Proposed Development

alterations and extension of property, namely for the addition of 2 no. dormer windows to existing bedroom area at first floor in existing cottage and for the construction of a dormer extension to the rear, all with associated site development works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Mar 2018

  2. Further information requested

    1 May 2018

  3. Further information received

    13 Jun 2018

  4. Decision: REFUSED

    17 Jul 2018

  5. Decision due

    18 Jul 2018

Application Details

Location
The Pump Cottage , Ballygunnermore , Co. Waterford
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Waterford City and County Council
Floor Area
112 sq m
Residential Units
1

Timeline

Registration Date
12 March 2018
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
17 July 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

295m
18710CONDITIONAL18 Oct 2018

to construct an A-frame livestock shed containing straw bedded area, feed passage also to cover existing U/G slatted tank and associated site works with the development

Ballygunnercastle , Waterford

476m
18841CONDITIONAL17 Dec 2018

to construct a Cubicle shed with slatted tanks, loose area, milking area, drafting area, storage area and all associated site works. Demolition of loose shed is also required

Ballygunner Castle , Grantstown , Co. Waterford

479m
2360441CONDITIONAL21 Sept 2023

to construct walled silage pits, concrete aprons, effluent tank and all associated site works. Demolition of storage shed is also required

Ballygunner Castle , Grantstown , Co. Waterford

479m
2360142CONDITIONAL17 Apr 2023

to construct (i) slatted shed extension (ii) storage shed extension and all associated site works

Ballygunner Castle , Grantstown , Co. Waterford

518m
2360518CONDITIONAL27 Oct 2023

for development consisting of demolition and alteration to the existing cottage. Demolition and alteration: (i) demolition of existing porch and eastern gable wall. (ii) alteration of the existing ground floor layout, extension to the front (northern) and side (eastern) and back (southern) elevations of the dwelling at this level; (iii) conversion of new first floor traditional style dormer extension over existing building including first floor extension to the side (eastern) elevation (iv) provision for the widening of the existing vehicular access, (v) all ancillary works, inclusive of Suds drainage, landscaping and boundary treatment necessary to facilitate the proposed development.

Bishopscourt Cottage , Grantstown , Co. Waterford

537m
21313CONDITIONAL19 Apr 2021

retention permission and planning permission at a 2.22 hectare site, retention permission is sought for 2 no. prefabricated units (these 2 no. units form part of the overall 12 no. units on site which were permitted under Reg. Ref: 16/642) for use as part of the existing school, of which 11 no. units were constructed on site. The 2 no. units are replacements for 2 no. units previously permitted under Reg. Ref. 16/642 following irreparable storm damage to the original 2 no. units. Retention permission is also sought, for a temporary period of 5 years, for prefabricated unit no. 13 to the north east of the site entrance, for use as a school classroom. Permission is sought for temporary permission for a period of five years for the extension of the permission previously granted under Reg. Ref. 16/642 for prefabricated single storey buildings comprising of 12 no. classrooms and associated toilet blocks, locker room and store rooms, administration office, staff room and reception, translucent canopy and extension to the existing canopy over existing units nos. 3, 4, 5, 11 and proposed unit no. 12 and all existing associated site works, including site entrance, realigned roadside boundary, new footpath from the entrance gate to the school buildings, foul pumping station, storm attenuation system, car parking, fencing, connections to existing services and all associated and ancillary works.

Gaelcholaiste Phort Lairge , Bishopscourt , Ballygunner

537m
20943CONDITIONAL11 Dec 2020

construction of a 2 storey extension to existing 2 storey dwelling along with all associated site works

No. 103 The Crescent , Kilcaragh Park , Ballygunner

539m
2560541CONDITIONAL1 Aug 2025

1. The demolition of 1152.9 sq.m temporary educational facility consisting of prefabricated single storey buildings, comprising of 14 classrooms, 1 staff room, administration offices, toilet blocks, vehicular and pedestrian access gates, signage, car park, footpath and astro turf pitch. 2. The demolition of 77sq.m of a temporary creche facility comprising of prefabricated single storey building with outdoor play area. 3. The construction of a new standalone 5,573sq.m post primary school. Accommodation provides for 2 classroom special education needs unit with all associated facilities, 12 general classrooms, 1 multimedia room, 1 music room, 1 textile room, 1 design room, I graphics room, 2 science laboratories with associated preparation room, 1 engineering room, 1 construction studies with associated preparation room, 1 art room with associated project store, 1 home economics room, 1 library, 1 general purpose hall, 1 staff room, 1 kitchenette, 3 SET Rooms, 7 administrative rooms, 1 multi use hall and associated PE store, 1 fitness suite, 2 changing rooms, ancillary accommodation and circulation. 4. Realignment of roadside boundary, reconfiguration of existing entrance egress, construction of a new pedestrian path, cycle path, new entrance access road, front boundary wall with signage, 2 No. gates, a public drop-off area and 1 no bus stop. 5. Construction of a new internal carriageway, car park with 48 no. car park spaces, parent drop off area, 70 no. cycle space, 4 No bus drop off, 2 No special education needs unit drop off and new signage above the main building entrance. 6. Construction of ESB substation, switch room, foul pump station, bio retention soakway, LPG area, bin store, external store, covered yard, heat pump compound, 3 ball courts, 1 Astro turf pitch, all associated ancillary site development, drainage, fencing and landscape works.

Gaelcholáiste Phort Láirge , Bishopscourt , Ballygunner Waterford

541m
22868CONDITIONAL11 Oct 2022

the installation of 1 no. prefabricated temporary structure consisting of 2 no. classrooms, 2 no. toilets and circulation space together with all associated site works

Gaelcholaiste Phort Lairge , Bishopscourt , Ballygunner

558m
22556CONDITIONAL22 Jun 2022

development consisting of; - widening of existing site entrance which includes removal of the existing gate, wall and gate pier, removal of existing evergreen trees and perimeter fence, - widening of existing entrance road, new concrete footpath, new tactile paving, - proposed perimeter paladin fence - proposed pedestrian gate, railings, concete steps, landing and bollards, - proposed sliding gate system, - proposed rendered blockwork wall, pier, capping and signage, - relocation of existing flag pole, - partial relocation of previously granted walking track, - proposed pedestrian crossing, line markings, and all associated site works

Ballygunner Hurling Club , Bishopscourt , Ballygunner