An Linn Bhuí , Baile na nGall Mór , An Rinn Dún Garbhán
CONDITIONALPlanning application 1946
Waterford - Waterford City and County Council
Proposed Development
teach cónaithe stór go leith agus garaiste a thógaint chomh maith le bealach isteach nua, córas cóireála séarachais, limistéar meath-laithe agus áiseanna is oibreacha eile ábartha a bhaineann leis an tógail ag an láithreán
View the full application file on the council's planning portal →Application Timeline
Application received
31 Jan 2019
Decision: CONDITIONAL
26 Mar 2019
Decision due
27 Mar 2019
Grant issued
2 May 2019
Application Details
- Location
- An Linn Bhuí , Baile na nGall Mór , An Rinn Dún Garbhán
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Waterford City and County Council
- Floor Area
- 231 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 31 January 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 26 March 2019
- Grant Date
- 2 May 2019
- Permission Expires
- 1 May 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
chun athruithe ar ár teorainn láithreáin mar a bhí roimhe seo ama dheonú faoi PD 02/1308
An Linn Bhuí , Baile na nGall Mór , Dún Garbhán
le hathruithe a dhéanamh agus críoch a chur le tigh cónaithe, garáiste agus slí isteach gur tugadh cead dóibh cheana faoi PD 08/213, córas cóireála fuíolluisce a insealbhú agus oibreacha fo-ghabhálacha
Baile na nGall Mór , An Rinn , Co. Phort Láirge
development to include the construction of two storey extension to rear, side and over existing dwelling, two no. single storey rear extensions, entrance canopy and car port to front of existing dwelling. Works to include single storey extension to existing garage, new garden shed and all associated internal remodelling and site works
1 Radharc na Mara , An Rinn , Dun Garbhan
Is é atá i gceist san fhorbairt ná an síneadh le díon cothrom atá ann cheana féin a leagan go talamh, mar aon le hathruithe inmheánacha agus síneadh aon stóir nua a thógaint siar ó dheas, athruithe ar na fuinneoga atá ann cheana féin agus fuinneoig nua a oscailt siar ó thuaidh ón teach atá ann cheana féin. Lorgaítear cead chomh maith do shlí isteach nua, mar aon le córas searachais nua agus gach gné d’oibreacha láithreáin a bhaineann leo ag an láithreán seo.
An Linn Bhuí Baile na nGall Mór , An Rinn Dún Garbháin , Co. Phort Láirge
Is é atá i gceist san fhorbairt ná tigh nua aon úrlár a thógaint le garáiste, bealach isteach nua, córás nua fuíolluisce, maraon le ceangailt leis an gcorás uisce poiblí agus gach gné d’oibreacha láithreáin a bhaineann leis ag an láithreán seo i
Cill an Fhuarthainn , Rinn Ó gCuanach , Dún Garbháin Co. Phort Láirge
Áiseanna páirceála nua, chomh maith le athruithe ar an mbóthar rochtana dá réir maraon le gach obair fhorbartha choimhdeachta agus seirbísí láithreáin a théann leis.
Pairc na Seachin , Killinoorin Ring , Waterford
the construction of a new petrol filling station together with associated overhead canopy (4.5 meters high) and 2 no. fuel dispensing pumps, compressed air tyre pump and water dispenser, new vehicular access entrance, new associated car parking, installation of 2 no. 40,000 litre underground fuel storage tanks together with all ancillary and associated site works
Spar Baile na nGall , An Rinn , Dungarvan
the construction of a new petrol filling station together with associated overhead canopy (4.5 meters high) and 2 no. fuel dispensing pumps, compressed air tyre pump and water dispenser, new vehicular access entrance, new associated car parking, installation of 2 no. 40,000 litre underground fuel storage tanks together with all ancillary and associated site works
Spar , Baile na nGall , An Rinn Dungarvan
(a). Single storey entrance building with function space, gallery space, staff kitchen and office space (total gfa: 480 sqm) (b). Two storey office block (total gfa: 1023 sqm) (c). Single storey plant/ service block (total gfa: 65 sqm) The site development works include - a proposed central courtyard, covered walkways and small outdoor performance space. - New circulation road and staff parking. - Primary vehicular access to the site is maintained via the existing main entrance to the site from R674 with proposed upgrading of entrance way. - Bin Refuse Storage Area and Designated Bicycle Shelter providing for 17 no. spaces. - New external landscaped areas. - Extension to existing Playground with new playground facilities and parking. - All associated site development works including all landscaping and site service works.
Ionad Pobail agus Fiontraíochta An Rinn , Baile na nGall Beag , An Rinn
Is é atá i gceist san fhorbairt ná: Áiseanna páirceála nua, chomh maith le athruithe ar an mbóthar rochtana dá réir maraon le gach obair fhorbartha choimhdeachta agus seirbísí láithreáin a théann leis.
Pairc na Seachin , Killinoorin Ring , Waterford
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?