← Back to search

The Pilot House , 1 The Quay , Cheekpoint

N/A

Planning application 19846

Waterford - Waterford City and County Council

Proposed Development

the indefinite retention of the sub-division of the existing site, together with indefinite retention of elevational alterations to the rear

View the full application file on the council's planning portal →

Application Details

Location
The Pilot House , 1 The Quay , Cheekpoint
Applicant
N/A
Application Type
RETENTION
Planning Authority
Waterford City and County Council

Timeline

Registration Date
7 November 2019
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
19874REFUSED19 Nov 2019

the indefinite retention of the sub-division of the existing site, together with indefinite retention of elevational alterations to the rear of The Pilot House (PROTECTED STRUCTURE)

The Pilot House rear of , 1 The Quay , Cheekpoint

0m
21423CONDITIONAL14 May 2021

for sub division of an existing rear garden to create two separate private amenity spaces, 'private amenity space A' will be attached to Cottage No. 1, The Village (A Protected Structure) and 'Private Amenity Space B' will be provided for The Pilot House, an existing residential unit within the curtilage of Cottage 1. Permission is also sought to construct a single storey extension of 23 square metres, to the Pilot House to bring the total floor area to 45 square metres along with associated development works to facilitate the development of

Cottage No. 1 , The Village , Cheekpoint

69m
20181N/A19 Mar 2020

to construct a Wheelchair Accessible Ramp Access with Entrance gate and associated works to access proposed Pontoon facility at

Main Quay , Cheekpoint , Co Waterford

69m
20217CONDITIONAL7 Apr 2020

to construct a Wheelchair Accessible Ramp Access with Entrance gate and associated works to access proposed Pontoon Facility. An NIS (Natura Impact Statement) accompanies this Planning Application at

Main Quay , Cheekpoint , Co Waterford

194m
21723N/A26 Jul 2021

construction of a dormer type single-family dwelling, demolition of existing derelict structure on site, alteration to front boundary wall and site entrance, and all ancillary site works

The Mount , Cheekpoint , Co. Waterford

194m
21951CONDITIONAL12 Oct 2021

the construction of a dormer type single-family dwelling, demolition of an existing derelict structure on site, alteration to the front boundary wall, new site entrance and all ancillary site works

The Mount , Cheekpoint , Co. Waterford

194m
21904N/A28 Sept 2021

construction of a dormer type single-family dwelling, demolition of existing derelict structure on site, alteration to front boundary wall and site entrance, and all ancillary site works

The Mount , Cheekpoint , Co. Waterford

285m
19909N/A3 Dec 2019

the indefinite retention of a reconstructed dormer dwelling house and all associated site works

3 High Road , Cheekpoint , Co. Waterford.

285m
19938CONDITIONAL10 Dec 2019

the indefinite retention of a dormer dwelling house as constructed and all associated site works

No. 3 High Road , Cheekpoint , Co. Waterford

289m
2660364N/A26 May 2026

for the construction of a residential development containing 65No. dwelling units comprising of 13 No. two-storey 4 bed detached units, 40No. two-storey 3 bed semi-detached units, 4No. single-storey 3 bed semi-detached units and 8 No. single-storey detached units, site landscaping, boundary treatments, 2No. new vehicular and pedestrian entrances onto Cullens Hill (L4401), 2No. pedestrian entrances onto Strand Road (L4403), realignment and widening of the existing road and provision of a footpath to part of the Strand Road to north of the subject site, together with all associated site development works. (A Natura Impact Statement will be submitted to the Planning Authority with the planning application).

Cheekpoint , Co. , Waterford

The submission window has closed

Observations on this application closed on Wednesday 11 December 2019, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?