demolish existing dormer dwelling, to decommission existing septic tank, to construct a replacement dwelling which is to be a dormer style dwelling, wastewater treatment system, percolation area, alterations to existing entrance from public road to improve sightlines, and all ancillary site works
View the full application file on the council's planning portal →Application Timeline
Application received
3 Mar 2022
Decision: CONDITIONAL
26 Apr 2022
Decision due
27 Apr 2022
Grant issued
2 Jun 2022
Application Details
- Location
- Greenan , Kilmacthomas , County Waterford
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Waterford City and County Council
- Floor Area
- 1 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 3 March 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 26 April 2022
- Grant Date
- 2 June 2022
- Permission Expires
- 1 June 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
a Dormer style two-storey house, a separate utility/ garden store building, set back at entrance, driveway and parking, treatment system and percolation area, a well and associated siteworks at Greenan, Co. Waterford.
Greenan , Kilmacthomas , Co. Waterford
to erect a dwelling house, detached garage, sewage treatment system and all ancillary works
Grenan , Kilmacthomas , Co. Waterford
to erect a dwelling house, detached garage, sewage treatment system and all ancillary works
Grenan , Kilmacthomas , Co. Waterford
for the restoration of part of an exhausted quarry void located within the former rock quarry at Carroll’s Cross in the townland(s) of Greenan and Ballyshanock. The application area will be ca. 4.7 hectares and the void which will be subjected to restoration covers an area of ca. 2.37ha. The development will consist of the restoration of the void with either: 1) Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will result in the Proposed Development operating as a soil recovery facility that requires a waste management licence from the EPA; or, 2) Soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product at its source of origin and transported as a by-product material to enable the Site to be restored. The Site would then operate under conditions of planning. The proposed works will also involve the removal of an existing silo onsite, the relocation of a groundwater monitoring well, installation of road pipe culvert in the Dawn River and amendments to the existing culvert crossing the Waterford Greenway (including the construction of onsite access ramps approaching the existing culvert either side of the Greenway), along with ancillary works and landscaping. The area of the Site which will be restored currently comprises of exposed and disturbed rock from past quarry activities. The Site will be restored to species rich grassland which may be subjected to low level grazing. A planning permission of 15 years is being sought for the Proposed Development. The application is accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) which will be available for inspection. The Development will take place at The
Former Roadstone Carrolls Cross Quarry , Greenan and Ballyshanock , Waterford
the restoration of part of an exhausted quarry void located within the former rock quarry at Carroll’s Cross in the townland(s) of Greenan and Ballyshanock. The application area will be ca. 4.7 hectares and the void which will be subjected to restoration covers an area of ca. 2.37ha. The development will consist of the restoration of the void with either: 1) Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will result in the Proposed Development operating as a soil recovery facility that requires a waste management licence from the EPA; or, 2) Soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product at its source of origin and transported as a by-product material to enable the Site to be restored. The Site would then operate under conditions of planning. The proposed works will also involve the removal of an existing silo onsite, the relocation of a groundwater monitoring well, installation of road pipe culvert in the Dawn River and amendments to the existing culvert crossing the Waterford Greenway (including the construction of onsite access ramps approaching the existing culvert either side of the Greenway), along with ancillary works and landscaping. The area of the Site which will be restored currently comprises of exposed and disturbed rock from past quarry activities. The Site will be restored to species rich grassland which may be subjected to low level grazing. A planning permission of 15 years is being sought for the Proposed Development.
Former Roadstone Carrolls Cross Quarry , Greenan and Ballyshanock , Waterford
for a concrete batch manufacturing facility consisting of the following; one concrete batching plant unit including a control cabin, four no. cement silos (to 15 metres in height) six no. storage bins, a reserve water tank, a truck wash out area with settlement tanks used for water collection and re-cycling, 2.750m2 storage yard and associated land-scaping and ancillary service all contained within 2.2 hectares of the Roadstone Carroll's Cross facility. The existing ancillary quarry facilities, such as wheelwash, weighbridge and site entrance will continue to be used to service the development. A Natura Impact Statement (NIS) will accompany the Planning Application. The development is situated in the townlands of
Greenan and Ballyshonock , Kilmacthomas , Co Waterford
for a concrete batch manufacturing facility consisting of the following; one concrete batching plant unit including a control cabin, four no. cement silos (to 15 metres in height), six no. storage bins, a reserve water tank, a truck wash out area with settlement tanks used for water collection and recycling, 2,750m2 storage yard and associated landscaping and ancillary service all contained within 2.2 hectares of the Roadstone Carrolls Cross facility. The existing ancillary quarry facilities such as wheelwash, weighbridge and site entrance will continue to be used to service the development. The development is situated in the townlands of Greenan and Ballyshonock, Kilmacthomas, Co. Waterford. A Natura Impact Statement (NIS) will accompany the Planning Application
Greenan and Ballyshonock , Kilmacthomas , Co Waterford
for the refurbishment of the existing cottage including raising the roof to allow a storey and a half, the addition of gable windows and rooflights to the front, elevational changes to the front façade, the construction of a rear storey and a half extention with dormer window and rooflights, the widening of the existing driveway entrance and the installation of a new waste water treatment system and polishing filter, the construction of a garage workshop and all associated site works at
Carrolls Cross , Kilmacthomas , Co Waterford
a ten-year planning permission for a solar energy development comprising photovoltaic solar panels on ground-mounted frames; photovoltaic solar panels on roof-mounted frames to be installed on the roof of an existing industrial building; inverters; transformer unit; electrical and communications cabling; access track and associated site entrance; security fencing; pole-mounted security cameras; and all associated and ancillary site development, landscaping and reinstatement works. The operational lifetime of the proposed development is 35-years. The development is for the purposes of an activity requiring an Integrated Pollution Control Licence and an Industrial Emissions Licence
Carroll's Cross , Ballyshonock , Kilmacthomas
to construct two fattening pig houses and a bunded concrete base for liquid feed tanks and associated site works. A Natura Impact Statement and Environmental Impact Report are submitted with the application. The site of the proposed development has an IPPC License Ref. No. PO686-01.
Greenan , Kilmacthomas , Co. Waterford
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?