Balleighteragh East , Dungarvan , Co. Waterford

CONDITIONAL

Planning application 22184

Waterford - Waterford City and County Council

Proposed Development

construct a dormer style dwelling, garage, wastewater treatment system, percolation area, splayed entrance and all ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 Mar 2022

  2. Decision: CONDITIONAL

    28 Apr 2022

  3. Decision due

    3 May 2022

  4. Grant issued

    14 Jun 2022

Application Details

Location
Balleighteragh East , Dungarvan , Co. Waterford
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Waterford City and County Council
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
9 March 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
28 April 2022
Grant Date
14 June 2022
Permission Expires
13 June 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

3m
21349REFUSED28 Apr 2021

outline planning permission to construct a dormer style dwelling, garage, wastewater treatment system, percolation area, splayed entrance and all ancillary site works at

Balleighteragh East , Dungarvan , Co Waterford

540m
2660103CONDITIONAL19 Feb 2026

the construction of a new part one and a half storey and part single-storey dwelling house, including domestic garage, along with new entrance driveway, septic tank with percolation area, connection to public water supply and all associated site works & drainage

Fruithill , Dungarvan , Co. Waterford

586m
23224CONDITIONAL19 Jul 2023

to construct a Single Storey Dwelling, Wastewater treatment system, Entrance and Ancillary works

Ballycoe , Dungarvan , Co Waterford

593m
17517CONDITIONAL14 Jul 2017

a dwelling house, garage, new entrance, wastewater treatment system, water borewell and all other ancillary site works

Fruithill , Dungarvan , Co. Waterford

594m
18329CONDITIONAL11 May 2018

to (1) Relocate further to the south and lower floor level of both dwelling house and garage as originally granted for under 17/517 (2) Slightly alter western site boundary line from that originally granted for under 17/517

Fruithill , Dungarvan , Co Waterford

635m
1956CONDITIONAL5 Feb 2019

alterations to boundaries of existing dwelling house site

Fruithill , Dungarvan , Co. Waterford

698m
2360446CONDITIONAL26 Sept 2023

for the alteration of site boundaries, the relocation of the driveway and construction of a new shared entrance. This is a change from the original planning permission P.D. 05/1181

Ballyeighteragh West , Kilgobinet , Dungarvan Co. Waterford.

740m
2360447CONDITIONAL26 Sept 2023

for the refurbishment and extension of the existing house, removal of the existing rear extension, realignment of the existing roof, changes to existing door and window opes, the upgrading of the waste water treatment system, the construction of a garage and a new shared entrance along with all associated site works

Ballyeighteragh West , Kilgobinet , Dungarvan Co. Waterford.

759m
2360477CONDITIONAL11 Oct 2023

to retain indefinitely openings for new windows to the existing dwelling house. Planning permission is also required for the construction of a one and a half storey extension with balcony to the rear of the existing dwelling house, alterations to existing entrance driveway and entrance walls, alterations to existing dwelling house and all ancillary works

Loughanunna , Dungarvan , Co. Waterford

759m
2360458N/A2 Oct 2023

to retain indefinitely openings for new windows to the existing dwelling house. Planning permission is also required for the construction of a one and a half storey extension with balcony to the rear of the existing dwelling house, alterations to existing entrance driveway and entrance walls, alterations to existing dwelling house and all ancillary works

Loughanunna , Dungarvan , Co. Waterford

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?