Jabil Healthcare , Unit 210 IDA Waterford Industrial Park , Cork Road
CONDITIONALPlanning application 22657
Waterford - Waterford City and County Council
Proposed Development
a) Internal alterations at first floor level of Building B to form additional floor space (319m2) including installation of associated rooflights; b)Alterations to existing East (Rear) Elevation at second floor level of Building B incorporating installation of windows in existing external wall to existing storage/office space; c) Erection of an external walkway (24m2) at second floor level to link Building B & C together with installation of external door to access same from Building B; all together with associated works
View the full application file on the council's planning portal →Application Timeline
Application received
21 Jul 2022
Decision: CONDITIONAL
13 Sept 2022
Decision due
14 Sept 2022
Grant issued
18 Oct 2022
Application Details
- Location
- Jabil Healthcare , Unit 210 IDA Waterford Industrial Park , Cork Road
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Waterford City and County Council
Timeline
- Registration Date
- 21 July 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 13 September 2022
- Grant Date
- 18 October 2022
- Permission Expires
- 17 October 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
a) Internal alterations at first floor level of Building A to form additional floor space (616m2) including installation of associated rooflights & external windows; b) construction of a new entrance lobby (5.90m2) and first floor link corridor to Building A (112m2); c) internal alterations to Building A to accommodate improved stair and lift access; d) together with associated site works including installation of 6 No. material feed silos
Jabil Healthcare , Unit 210 IDA Waterford Industrial Park , Cork Road Waterford
a single storey Plant Room extension to the rear [east ] of the existing building inclusive of all associated ancillary works and associated site works at
Unit 210 , IDA Waterford Industrial Park , Cork Road Waterford
Permission for construction of a Stationary Battery Energy Storage facility, which includes twenty 20 ft containers and four medium voltage transformers. All associated site and development works.
Jabil Healthcare Unit 210 , IDA Industrial Estate , Cork Road
i ) Construction of a Stationary Battery Energy Storage facility, which includes twenty 20ft containers and four medium voltage transformers, ( ii ) All associated site and development works.
Jabil Healthcare Unit 210 , IDA Industrial Estate , Cork Road
for Construction of a 1MW/1.1MWh Stationary Battery Energy Storage facility, which includes 1no. 20ft container, 1no. medium voltage transformer and 1no. low voltage enclosure,All associated site and development works
Jabil Healthcare , Unit 210 IDA Industrial Estate , Cork Road Waterford
for the demolition of an existing carpentry training facility, and for the construction of a new two-story replacement training facility building, comprising of a carpentry training workshop and classroom together with all associated site development works at
Units 212-215 Waterford Training Centre , Waterford Industrial Park Cork Road , Waterford
to extend the front of the garage and also to extend the entrance porch
21 Tir Connell Ave , Lismore Lawn , Waterford
the construction of a new single storey Warehouse Extension and a new stand-alone Laboratory Consumables Store complete with all associated site works and services a
Unit 301 IDA Industrial Park , Cork Road co. Waterford , Waterford Ireland
the demolition of existing store (39.2 sq.m) and existing shelter (61.1 sq.m) on the West Elevation and existing plant enclosure (75 sq.m) to the North of Unit 301. The construction of a new 308 sq.m single storey Warehouse Extension (7.91 metres high) and a new 35.76 sq.m stand-alone Laboratory Consumables Store (5.5 metres high) complete with all associated site works and services
Unit 301 IDA Industrial Park , Cork Road co. Waterford , Waterford Ireland
to demolish existing side and rear extensions and construct a new two storey side extension, increase height of rear/side boundary wall to 2m, together with all associated site works
178 Lismore Park , Waterford
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?