← Back to search

Ballyduff West , Co. Waterford

N/A

Planning application 2360163

Waterford - Waterford City and County Council

Proposed Development

the construction of a new two-storey dwelling, associated effluent treatment plant and percolation area, detached domestic garage, construction of a new vehicular entrance and the erection of new site boundaries, together with all associated site development works including partial setback of existing roadside boundary at Ballyduff West, Co. Waterford

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Apr 2023

  2. Application withdrawn

    14 Jun 2023

Application Details

Location
Ballyduff West , Co. Waterford
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Waterford City and County Council
Site Area
1.635 ha

Timeline

Registration Date
28 April 2023
Status
WITHDRAWN
Decision
N/A
Withdrawn
14 June 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

2m
2360558REFUSED20 Nov 2023

the construction of a new two- storey dwelling, detached domestic garage, construction of a new vehicular entrance, the erection of new site boundaries and the installation of a new pumped effluent line discharging to the public sewer, together with all associated site works including partial setback of existing roadside boundary

Ballyduff West , Co. , Waterford

65m
18221REFUSED5 Apr 2018

development consisting of the construction of a fully serviced bungalow, bio-waste sewage treatment system and all associated site works

Ballyduff Lower , Kilmeaden , Co. Waterford

76m
1936REFUSED28 Jan 2019

development consisting of the construction of a fully serviced bungalow, bio-waste sewage treatment system and all associated site works

Ballyduff Lower , Kilmeaden , Co. Waterford

89m
18776CONDITIONAL16 Nov 2018

EXTENSION OF DURATION PD13/272 to erect a Flower Packing Building and 1000sq metre Poly tunnel, waste water treatment system, percolation area, water storage tank and all associated accommodation and site works

Ballyduff West , Via Kilmeaden , Co. Waterford

167m
20445CONDITIONAL7 Jul 2020

for construction of single storey extension to the side of the existing building and changes to front façade fenestration including new roof lights together with all additional site works at

Ashler , Ballyduff West , Kilmeaden

195m
21498REFUSED1 Jun 2021

the construction of a bungalow, bio-waste sewage treatment system and all associated site works

Ballyduff Lower , Kilmeaden , Co Waterford

195m
18222REFUSED5 Apr 2018

development consisting of the construction of a fully serviced bungalow, bio-waste sewage treatment system and all associated site works

Ballyduff Lower , Kilmeaden , Co. Waterford

228m
22808CONDITIONAL13 Sept 2022

for change of use from stables to a dwelling house together with planning permission for sub-division of the site, waste water treatment plant and percolation area, soakaway, shared entrance, connection to mains water and all associated site works

Ballyduff , Kilmeaden , Co. Waterford

228m
22773N/A1 Sept 2022

for change of use from stables to a dwelling house together with planning permission for waste water treatment plant and percolation area, soakway, shared entrance, connection to mains water and all associated site works

Ballyduff , Kilmeaden , Co. Waterford

266m
21167CONDITIONAL5 Mar 2021

indefinite retention of the following works to my existing dwelling house comprising minor internal refurbishment and alteration work, permission for the construction of a new double door to the West (Side) elevation, the construction of a single storey extension to the South East (Rear) of the existing dwelling house and the construction of a standalone single storey garage, together with all ancillary and associated site works at

Ballyduff West , Kilmeaden , Co Waterford

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?