Ballygunner GAA Club , Bishopscourt Ballygunner , Co. Waterford

CONDITIONAL

Planning application 2360495

Waterford - Waterford City and County Council

Proposed Development

erect a 19m high telecommunications monopole together with headframe, antennae, dishes and associated telecommunications equipment enclosed by security fencing and remove an existing 15m high telecommunications monopole.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 Oct 2023

  2. Decision: CONDITIONAL

    8 Dec 2023

  3. Decision due

    12 Dec 2023

  4. Grant issued

    11 Jan 2024

Application Details

Location
Ballygunner GAA Club , Bishopscourt Ballygunner , Co. Waterford
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Waterford City and County Council
Site Area
0.021 ha

Timeline

Registration Date
18 October 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
8 December 2023
Grant Date
11 January 2024
Permission Expires
10 January 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
21978REFUSED19 Oct 2021

to replace a 15m telecommunications monopole with a 24m telecommunications monopole together with antennae, dishes and associated telecommunications equipment enclosed by security fencing at

Ballygunner GAA Club , Bishopscourt , Ballygunner

175m
18865N/A20 Dec 2018

development consisting of retention permission to retain the existing six number lighting posts (15 meters) and retention permission to retain and operate the telecommunications antennas and associated cabinets at post number 6 as previously granted under planning reference 13/500026. The development will continue to form part of Meteor Mobile Communications Ltd existing and future telecommunications and broadband network

Ballygunner Hurling Club , Bishopscourt , Ballygunner

175m
21109CONDITIONAL18 Feb 2021

for development consisting of flood lighting including erection of new lighting columns, provision of generator and generator compound, removal of existing bases and lighting columns at existing playing pitch, development of a training area approximately 47m x 60m with flood lighting and fence to perimeter, lighting of existing ball alley, raising wall height of existing ball alley wall to provide additional hurling wall, walking track to full perimeter of grounds, lighting to existing carpark, existing entrance road and existing astroturf area at our grounds at

Bishopscourt , Ballygunner , Waterford

176m
20250N/A30 Apr 2020

retention permission to retain the existing six number lighting posts (15 metres) and retention permission to retain and operate the telecommunications antennas and associated cabinets at post number 6 as previously granted under local authority reference 13/500026. The development will continue to form part of Meteor Mobile Communications Ltd existing and future telecommunications and broadband network

Ballygunner Hurling Club , Bishopscourt , Ballygunner

269m
211099CONDITIONAL24 Nov 2021

for construction of extensions to front and side of our existing dwelling together with elevational changes, new soakaway, connection to on-site services and all associated site works

St. Mary's , Bishopscourt , Grantstown

283m
18459REFUSED5 Jul 2018

a single storey fully serviced detached dwelling with attic together with all associated site works to include new shared vehicular access/driveway, paddocks, detached garage, landscaping, boundary treatments, proprietary treatment system and percolation area, proposed well

Bishopscourt , Grantstown , Waterford

285m
2560935CONDITIONAL19 Dec 2025

for the following works to existing school, the construction of a new single storey extension consisting of 2 no. resource rooms with adjoining link corridor all located to the south and east side of the existing School with roof mounted PV panels together with all associated drainage, together with all ancillary and associated site works

Bishopscourt , Ballygunner , Waterford

286m
22755CONDITIONAL26 Aug 2022

for the construction of a new single storey extension consisting of 2 no. classrooms, 6. no resource rooms, 1. no. Assisted User WC and adjoining link corridor all located to the north side of the existing School, with roof mounted PV panels together with all associated drainage and external hardstand site works, the construction of a new carparking area located to the front (east) side of the existing school, together with all ancillary and associated site works

St. Mary's National School , Bishopscourt , Ballygunner

313m
2190N/A9 Feb 2021

the construction of a new fully serviced part single storey/part 2 storey detached dwelling house with attached car port, new vehicular entrance, landscaping and boundary treatments, together with all ancillary and associated site works

Bishopscourt , Co. Waterford

313m
20865N/A23 Nov 2020

construction of a new fully serviced part single storey/part 2 storey detached dwelling house with attached car port, new vehicular entrance, landscaping and boundary treatments, together with all ancillary and associated site works

Ballygunnercastle , Grantstown , Co Waterford

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?