Woodstock , Cappoquin , Co. Waterford
CONDITIONALPlanning application 2360610
Waterford - Waterford City and County Council
Proposed Development
for the construction of a detached timber-frame dwelling, wastewater bio treatment tank and raised soil polishing percolation area, potable well, vehicular entrance and all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
14 Dec 2023
Decision: CONDITIONAL
7 Feb 2024
Decision due
16 Feb 2024
Grant issued
21 Mar 2024
Application Details
- Location
- Woodstock , Cappoquin , Co. Waterford
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Waterford City and County Council
- Site Area
- 0.202 ha
- Floor Area
- 148.9 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 14 December 2023
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 7 February 2024
- Grant Date
- 21 March 2024
- Permission Expires
- 20 March 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the minor amendments to development permitted under ref. no 23/60610 and comprises the replacement of a detached timber-frame dwelling with a detached block-work dwelling, including ancillary localised site works. The residential development permitted under ref. no. 23/60610 remains otherwise unchanged.
Woodstock , Cappoquin , Co. Waterford
the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application
Woodstock and Kereen Lower , Cappoquin , Co. Waterford
for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application
Kereen Lower , Cappoquin , Co. Waterford
PERMISSION for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application
Woodstock and Kereen Lower , Cappoquin , Co. Waterford
for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application.
Woodstock & Kereen Lower , Cappoquin , Co. Waterford
for the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application
Woodstock and Kereen Lower , Cappoquin , Co. Waterford
to extend the infill part of the Exhausted Quarry with Inert Material and an area to recycle construction materials
Kereen Lower , Cappoquin , Co. Waterford
to extend the infill part of the Exhausted Quarry with Inert Material and an area to recycle construction materials
Kereen Lower , Cappoquin , Co. Waterford
to extend the infill part of the Exhausted Quarry with Inert material and an area to recycle construction materials. The activity involved an activity that requires a Waste Facility Permit.
Kereen Lower , Cappoquin , Co. Waterford
Extension of Duration to Planning File 17/160 to extend the infill part of the exhausted quarry with inert material and an area to recycle construction materials. The activity involves an activity that requires a waste facility permit
Kereen Lower , Cappoquinn , Co. Waterford
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?