← Back to search

Gaoth na Mara Maoil an Choirnigh , Ring , Co.Waterford

N/A

Planning application 2460457

Waterford - Waterford City and County Council

Proposed Development

Extension to Dwelling House

View the full application file on the council's planning portal →

Application Details

Location
Gaoth na Mara Maoil an Choirnigh , Ring , Co.Waterford
Applicant
N/A
Application Type
RETENTION
Planning Authority
Waterford City and County Council
Site Area
0.9 ha

Timeline

Registration Date
8 August 2024
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2460521CONDITIONAL11 Sept 2024

of extension to dwelling house

Gaoth na Mara Maoil an Choirnigh , Ring , Co.Waterford

51m
19429CONDITIONAL14 Jun 2019

ná tigh cónaithe nua aon urláir a tógaint, chomh maith athruithe a dhéanamh ar an slí isteach atá ann cheana fhéin, ceangal lesi an córas searachais poiblí agus gach gné d'oibreacha láthreáin eile a bhaineann leis

Maoil a Chóirnigh , An Rinn , Dún Garbhán

98m
2360401CONDITIONAL1 Sept 2023

(1) a rear kitchen extension (2) a change in roof style from that originally granted planning permission and (3) a change of site boundaries from that originally granted planning permission on Planning Ref: 91/489.

Mweelnahorna , Ring , Dungarvan

100m
2660218CONDITIONAL8 Apr 2026

a single storey extension to an existing single storey dwelling, new roof lights to existing roof, demolition and replacement of the existing entrance porch structure (replaced with similar but bigger footprint) and all ancillary works

An Tigín Aerach Mweelnahorna , Ring Dungarvan , Co. Waterford

148m
22534N/A16 Jun 2022

Beartaímse, Séan Ó’Muirithe, iarratas a chur isteach ar Comhairle Cathrach agus Contae Phort Lairge chead imlíneach chun forbairt a dhéanamh ag an láithreán seo i Maoil a Chóirnigh, An Rinn, Dún Garbhán, Co. Phort Lairge. Is é atá i gceist san fhorbairt ná chun tig chónaithe aon úrlar a thógaint, sli isteach, ceangal a dhéanamh leis an gcóras uisce poiblí agus séarachas poiblí agus na hoibreacha láithreán cúnta

Maoil a Chóirnigh , An Rinn , Dún Garbhán

148m
22480N/A3 Jun 2022

chun tig chónaithe aon úrlar a thógaint, slí isteach, ceangal a dhéanamh leis an gcóras uisce poiblí agus séarachas poiblí agus na hoibreacha láithreán cúnta

Maoil a Chóirnigh , An Rinn , Dún Garbhán

228m
18247CONDITIONAL13 Apr 2018

the indefinite retention of 1. a rear extension consisting of a kitchen/living room and sunroom 2. a rear extension consisting of an en-suite

2 Mweelahorna , Ring , Dungarvan

247m
20576REFUSED20 Aug 2020

the construction of 46 no. mixed storey dwellings, comprising of : 12 no. 4 bed 2-storey detached dwellings, 2 no. 4 bed 2-storey semi-detached dwellings, 28 no. 3 bed 2-storey semi-detached dwellings and 4 no. detached 2 bed elderly units. New 2m high concrete block site boundary walls to perimeter of the site with localized timber post & rail sections as per site plan. New entrance to public road, all connections to public services and all associated site development works

Mweelahorna , An Rinn , Co. Waterford

360m
18147CONDITIONAL5 Mar 2018

chun cur leis an Naíonra agus athchóiriú a dhéanamh air. Sé atá I gceist ná seomra ranga nua aon úrlár a thógaint, maraon le fáiltiú, oifig, seomra storáis agus áiseanna eile a bhaineann leis an tógáil a chur san áireamh chomh maith le aon oibreacha eile riachtanacha ar shuíomh

Ionad Pobail na Rinne , Maoil a'Chóirnigh , An Rinn Dún Garbhán

360m
1992CONDITIONAL15 Feb 2019

ná cur leis an tslí isteach ar chúl agus an seomra chruinnithe pobail ar an gcéad úrlar atá ann cheana fhéin. Táthar ag lorg cead athrú ábhartha úsáide chomh maith do seomra iarscoile a dhéanamh de sheomra chruinnithe pobail thuas staighre, chomh maith le athraithe a dhéanamh ar an seomara atá ann cheana fhéin ar an gcéad urlár agus aon oibreacha ginearálta eile riachtanacha ar an láithreán tógála

Ionard Pobail na Rinne , Maoil a 'Chóirnigh , An Rinn Dún Garbhán

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?