← Back to search

Blenheim Hill , Ballymaclode , CO Waterford

CONDITIONAL

Planning application 2542

Waterford - Waterford City and County Council

Proposed Development

for the indefinite retention of the existing construction works comprising of the existing store and existing open store area together with all ancillary and associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 Apr 2025

  2. Decision: CONDITIONAL

    30 May 2025

  3. Decision due

    3 Jun 2025

  4. Grant issued

    8 Jul 2025

Application Details

Location
Blenheim Hill , Ballymaclode , CO Waterford
Applicant
N/A
Application Type
RETENTION
Planning Authority
Waterford City and County Council

Timeline

Registration Date
9 April 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
30 May 2025
Grant Date
8 July 2025
Permission Expires
7 July 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

16m
2360511CONDITIONAL25 Oct 2023

for construction of a single storey extension to the side of the existing dwelling, upgrade of existing septic tank to on-site treatment system and all associated site development works

Blenheim Hill , Ballymaclode , Halfway House

117m
2360634REFUSED21 Dec 2023

for the bulk excavation dig and alteration of levels, to reduce ground locally to that compatible with adjacent lands, together with all associated site development works all to the rear of Suir Garages

Passage Cross , Ballygunnertemple , Waterford

139m
19336CONDITIONAL17 May 2019

(a) the indefinite retention of an existing on-site store building and (b) extension to an existing machinery yard area associated with the agri-business and all site works

Suir Garages , Ballygunnertemple , Passage Cross

142m
2560467N/A7 Jul 2025

the construction of an agricultural vehicle testing facility incorporating associated offices, together with all associated site development works,

Suir Garages Passage Cross , Ballygunnertemple , Waterford

142m
2560484N/A15 Jul 2025

for the construction of 1no building, 7.25m overall height, for use as an agricultural vehicle testing facility, incorporating associated offices and mounted signage to the front elevation of the unit, together with all associated site development works,

Suir Garages Passage Cross , Ballygunnertemple , Waterford

142m
2560585REFUSED22 Aug 2025

for the construction of 1no building, 7.25m overall height, for use as an agricultural vehicle testing facility, incorporating associated offices and mounted signage to the front elevation of the unit, together with all associated site development works,

Suir Garages Passage Cross , Ballygunnertemple , Waterford

173m
18608CONDITIONAL7 Sept 2018

construction of an additional floor above the existing bungalow and the construction of a single storey extension to the south façade of the bungalow. In addition, the change of use and refurbishment of the existing commercial/industrial units to ancillary domestic use including a new site entrance and new wastewater treatment system together with all ancillary site works

Halfway House , Ballymaclode , Waterford

226m
22332REFUSED20 Apr 2022

SECTION 254 LICENCE for proposed 18m lollipop Streetpole Solution with antennas and ground equipment

Junction of the Dunmore Road (R683) and the , Dunmore East Road (R684) at the front of , an Applegreen filling station in

410m
2460145N/A26 Mar 2024

Permission for indefinite retention of a 105m2 portal frame garage bay, retention of a 56m2 workshop storage loft and rear stairs access, plus retention of office and workshop signage at

Ballygunnertemple , Waterford , Co. Waterford

427m
22333CONDITIONAL20 Apr 2022

RETENTION PERMISSION for INDEFINITE RETENTION of an existing enlargement of our existing bus parking apron and PLANNING PERMISSION for Demolition of existing 31m2 administration building and the construction of a new 66.4m2 single storey administration/drivers building, demolition of existing 110m2 single span bus garage and construction of a new two bay 146m2 extension to our existing garage, workshop and store, alterations and extension to our existing drivers and visitors car park, PERMISSION for construction of boundary walls and enclosures, alterations and widening of existing depot entrance, plus all associated site works and PERMISSION for completion of same

J.J. Kavanagh and Sons depot , Ballygunnertemple , Waterford

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?