Butlerstown South , Waterford , County Waterford
CONDITIONALPlanning application 2560661
Waterford - Waterford City and County Council
Proposed Development
to construct a single storey extension to the side of existing dwelling and to create a granny flat ancillary to the main dwelling along with associated site development works
View the full application file on the council's planning portal →Application Timeline
Application received
17 Sept 2025
Decision: CONDITIONAL
5 Nov 2025
Decision due
11 Nov 2025
Grant issued
12 Dec 2025
Application Details
- Location
- Butlerstown South , Waterford , County Waterford
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Waterford City and County Council
- Site Area
- 0.112 ha
- Floor Area
- 1 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 17 September 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 5 November 2025
- Grant Date
- 12 December 2025
- Permission Expires
- 11 December 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Extension of Duration of 16/232 - to construct two agricultural field entrances
Ballycashin , Butlerstown , Co Waterford
to construct a two storey family dwelling and detached garage together with wastewater treatment plant & percolation area, soakaways, new entrance, boundary treatment, connection to mains water and all associated site works
Butlerstown South , Co. Waterford
for the construction of a one-and-a-half-story family dwelling with a detached garage, water treatment system, percolation area, new entrance, boundary treatments, and all associated site works.
Ballycashin , Butlerstown , Co. Waterford
for the construction of a one-and-a-half-story family dwelling with a detached garage, water treatment system, percolation area, new entrance, boundary treatments, and all associated site works.
Ballycashin , Butlerstown , Co. Waterford
for the construction of a one-and-a-half-story family dwelling with a detached garage, water treatment system, percolation area, new entrance, boundary treatments, and all associated site works.
Ballycashin , Butlerstown , Co. Waterford
The construction of a cubicle shed incorporating new underground slurry storage and covering of existing slurry tank and associated site works
Ballycashin , Butlerstown , Waterford
construction of an underground slatted slury tank and silage slab and all ancillary site works
Ballycashin , Butlerstown , Waterford
for development which will consist of the following elements: A building (c.494 sq. m. and c.10m high) to house plant and equipment including 2 no. synchronous condensers with a storage room and a control and switchgear room; Plant and equipment to be located outside of the building but within a fenced compound which will include 2 no. Coolers surrounded by timber acoustic fencing, 2 no. Gas Circuit Breakers and a Switchgear Compound. The Switchgear Compound will have a galvanised?palisade security fence and include a transformer, a Low-Level Disconnector with Earth Switch, 2 no. High Level Disconnectors and a Circuit Breaker. The Switchgear Compound will connect the facility to the nearby ESB substation by underground cable. The proposed development will also include site clearance, landscaping, the enhancement of an existing agricultural access point, the construction of a hardcore access lane (grasscrete or similar), temporary surfacing works to facilitate construction access, the erection of a cattle stock fence, and drainage works to include a soakaway located to the northeast of the proposed building
Land to the north and east of the existing ESB 110kV substation , Butlerstown South Butlerstown , Co. Waterford
development which will consist of the following elements: A building (c.494 sq. m. and c.10m high) to house plant and equipment including 2 no. synchronous condensers with a storage room and a control and switchgear room; Plant and equipment to be located outside of the building but within a fenced compound which will include 2 no. Coolers surrounded by timber acoustic fencing, 2 no. Gas Circuit Breakers and a Switchgear Compound. The Switchgear Compound will have a galvanised?palisade security fence and include a transformer, a Low-Level Disconnector with Earth Switch, 2 no. High Level Disconnectors and a Circuit Breaker. The Switchgear Compound will connect the facility to the nearby ESB substation by underground cable. The proposed development will also include site clearance, landscaping, the enhancement of an existing agricultural access point, the construction of a hardcore access lane (grasscrete or similar), temporary surfacing works to facilitate construction access, the erection of a cattle stock fence, and drainage works to include a soakaway located to the northeast of the proposed building
Land to the north and east of the existing ESB 110kV substation , Butlerstown South Butlerstown , Co. Waterford
construction of a two storey dwelling, effluent treatment system and percolation area, entrance and associated siteworks
Butlerstown South , Butlerstown , Co. Waterford
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?