Holycross , Butlerstown , Waterford
N/APlanning application 2660017
Waterford - Waterford City and County Council
Proposed Development
the construction of a car rental hub comprising of 101m2, single storey office building along with an adjoining canopy to be used as a car wash/valeting bay. Site works to consist of a new entrance from the R680 road, 45 No. car parking spaces to include EV charging and disabled access spaces, landscaping, lighting, entrance gates, signage, boundary treatment, foul pumping station with connection to public foul sewer via a rising foul mains and water mains connection, together with all associated site development works. A Natura Impact Statement (NIS) accompanies this application.
View the full application file on the council's planning portal →Application Details
- Location
- Holycross , Butlerstown , Waterford
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Waterford City and County Council
- Site Area
- 0.868 ha
Timeline
- Registration Date
- 14 January 2026
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the construction of a car rental hub comprising of 101m2, single storey office building along with an adjoining canopy to be used as a car wash/valeting bay. Site works to consist of a new entrance from the R680 road, 45 No. car parking spaces to include EV charging and disabled access spaces, landscaping, lighting, entrance gates, signage, boundary treatment, foul pumping station with connection to public foul sewer via a rising foul mains and water mains connection, together with all associated site development works. A Natura Impact Statement (NIS) accompanies this application.
Holycross , Butlerstown , Waterford
for development consisting of a proposed exit onto the R680 Road along with associated site development works all adjoining to the existing hospital
UPMC Whitfield Hospital , Cork Road Butlerstown North , Waterford
Construction of an external roof access stair to the eastern elevation and all subsequent affected areas. Permission is also sought for construction of plant to roof level to accommodate 4 No. air handling units and all associated works
UPMC Whitfield hospital , Cork Road , Butlerstown North
Indefinite retention of 3 no. single storey temporary structures consisting of 1. Mobile MRI trailer unit with prefabricated link corridor (44.1m²); 2. Prefabricated building containing equipment store, break room & office (147.6m²) & 3. Prefabricated building for storage purposes (18.0m²) along with associated site development works all adjoining existing hospital
UPMC Whitfield Hospital , Cork Road Butlerstown North , Waterford
the temporary installation for a period of 12 months of a self-contained mobile operating theatre and the construction of associated link corridor and external ramp. Complete with all associated site works at site
UPMC Whitfield Hospital , Cork Road , Butlerstown North
for development consisting of extension to existing car park to finalise and make permanent 36 number existing temporary car parking spaces. Extending and upgrading carpark lighting to new LED light fittings, drainage and all associated site works at
IDA Ireland , Waterford Business and Technology Park , Butlerstown North
EXTENSION OF DURATION OF Planning Refs. 11/174 and 16/39 to construct 2 no. car showrooms incorporating workshops, staff rooms and ancillary facilities with mezzanine level, new access roadway for Cork Road, on-site customer and staff car parking, the provision of three totem signs, connection to on-site foul water treatment plant, drainage and connection to services and all associated site works
Butlerstown North , Cork Road , Co. Waterford
EXTENSION OF DURATION of planning ref. 11/174 and 16/39 to construct 2 no. car show rooms incorporating workshops, staff rooms and ancillary facilities with mezzanine level, new access roadway for Cork Road, on-site customer and staff car parking, the provision of three totem signs, connection to on-site foul water treatment plant, drainage and connection to services and all associated site works
Butlerstown North , Cork Road , Co. Waterford
site alterations at facility to consist of : 1. Provision of 33 no. new car parking spaces. 2. Provision of 3 no. new flagpoles, with a maximum height of 7m, and signage. 3. Provision of 2.5m tall paladin security fence enclosing services compound. 4. Provision of vehicle barriers at the 2 no. existing site entrances. 5. External patio area and landscaping. Also applying for retention permission for 21 no. car parking spaces and re-location of the existing footpath. To be done together with all associated site development works
EirGen Pharma Ltd. , IDA Technology Park Butlerstown , Cork Road
EXTENSION OF DURATION OF 16/498 - expansion and extension of the existing unit, along with the provision of additional parking. Works to consist of 1. Alteration of existing building to include provision of new escape doors and louvres in south and east facades, new backlit signage, new single storey loading bay / workshop extension (80 sqm) to east elevation, provision of mezzanine first floor (1480 sqm) over entire existing waterhouse area to rear of building, and provision of new roof mounted plant. 2. Provision of new 3 storey extension (15,570 sqm) to north of existing unit consisting of production space, warehouse and canteen on ground floor, offices and gantry mounted plant space on first floor, office / laboratory space on second floor, roof-mounted fully enclosed plantrooms and stair access at roof level and backlit signage to north elevation. 3. Provision of a new 2 storey central utilities building (341 sqm) to the east of the existing building, incorporating a fenced in area for external flues at ground level and plant mounted of roof over ground. A new pipe will connect services to the existing building and proposed extension. 4. Alteration of existing site to include extension of existing internal site access road, new 1.5m high totem signage, provision of new bicycle shelter, provision of new landscaping and provision of 199 no. new parking spaces in addition to the 62 no. existing parking spaces maintained for a total of 261 no. parking spaces. All of the above to be done together with all associated site development works
IDA Technology Park , Butlerstown , Cork Road
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?