Leigh Rinn Ua gCuanach , Dún Garbhan , Co. Port Lairge
N/APlanning application 2660206
Waterford - Waterford City and County Council
Proposed Development
Chead pleanála chun áit chónaithe aon stóir nua, córas cóireála fuíolluisce agus bealach isteach nua láithreáin a thógáil mar aon leis na hoibreacha agus na seirbhísí suímh go léir a bhaineann leis
View the full application file on the council's planning portal →Application Timeline
Application received
7 Apr 2026
Further information requested
26 May 2026
Further information received
4 Aug 2026
Decision due
31 Aug 2026
Application Details
- Location
- Leigh Rinn Ua gCuanach , Dún Garbhan , Co. Port Lairge
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Waterford City and County Council
- Site Area
- 0.31 ha
Timeline
- Registration Date
- 7 April 2026
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 31 August 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
demolition of existing single storey house and replacement with new dormer dwelling, shed, site works, new wastewater treatment system and percolation area and all ancillary works
Deise View , Leagh , Ring Dungarvan
iartha garaiste/stor, ata ann cheana fein a chomhsho go ait chonaithe, athraithe i gcoiriu na bhfuinneog san aireamh; sieadh dormanaigh a thogaint, coras choireail fuiolluisce nua a suiteail, comhbhealach isteach a thogail, agus oibreacha coimhdeacha
An Leith , Rinn ua gCuanach , Co Phort Lairge
garáiste/stór, atá ann cheana féin, a chomhshó go áit chónaithe, athraithe I gcóiriú na bhfuinneog san áireamh; córas chóireáil fuíolluisce nua a suiteáil, comhbhealach isteach a thógail, agus oibreacha coimhdeacha
An Léith , Rinn ua gCuanach , Co. Phort Láirge
is sought for the existing single storey extension to the front of the existing dwelling, together with detached outbuildings all located within the confines of the site.
Leagh , Ring , Dungarvan
EXTENSION OF DURATION OF 12/368 - to construct single-storey split-level extension to cottage, convert existing domestic garage/ store to living including consequential alterations to elevations to form a single dwelling unit and grannyflat, install wastewater treatment system to serve extended dwelling and ancillary works
Leagh , Ring , Dungarvan
athrú a dhéanamh ar na pleanannaa gceadaíodh (faoi thagairt pleanála PD. 12/368) chun síneadh a thógáil, atá aon stóir agus dhá stór I bpáirt, ar an teachín; an garáiste/stór a chomhshó go áit chónaithe, athraithe ingear iarmhartach san áireamh; córas chóireáil fuíolluisce chun freatal ar an teaghais atá ann cheana; agus oibreacha coimhdeacha
An Léith , Rinn ua gCuanach , Co. Phort Láirge
an teachín atá ann cheana féin a scartáil agus áit chónaithe nua a thógáil, atá aon stóir i bpáirt agus dhá stóir i bpáirt, córas chóireáil fuíolluisce nua sa suiteáil in ionad, na daibhche séarachais atá ann cheana féin, athraithe a dhéanamh ar an mbealach isteach atá ann cheana chun comhbhealach isteach a thógail agus oibreacha coimhdeacha
An Léith , Rinn ua gCuanach , Co. Phort Láirge
construction of a new single storey house, a waste water treatment system and an entrance along with all associated site works
Shanbally , Ring , Dungarvan
construction of a new single storey house, a waste water treatment system and an entrance along with all associated site works
Shanbally , Ring , Dungarvan
2 storey extension (91m2 to ground floor & 9.5m2 to first floor over 51.5m2 garage at semi basement level) to the rear and side of the exiting house, internal alterations, demolition of existing out building to the rear, with the associated drainage, ground works, garden walls, terraces, landscaping and associated works
An Nead , Leagh , An Rinn
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?