Kingsmeadow Pastimeknock , Kilbarry Ballynaneashagh , Waterford City County Waterford
N/APlanning application 2660654
Waterford - Waterford City and County Council
Proposed Development
The proposed development will consist of the construction and operation of a development consisting of an energy centre building, landscaping works, roof mounted solar PV and all other associated ancillary infrastructure within the townland of Kingsmeadow together with an associated heat pipeline network extending from the proposed energy centre building along sections of Kilbarry Road, Cork Road (R680) and Brown’s Road through the townlands of Kingsmeadow, Pastimeknock, Kilbarry and Ballynaneashagh, Waterford City, County Waterford. The Waterford Energy Centre building will integrate multiple low carbon energy technologies including the installation of Air Source Heat Pumps (ASHPs), and gas boilers, for peak load support and emergency back up. The proposed energy centre building will have a building height of 6.2m, with solar PV panels mounted on the building rooftop. The proposed development will also include a heat pipeline network consisting of 2no. pipes, with a diameter of 450mm each, spanning a distance of approximately 1,470m in an underground trench, from the proposed energy centre building, extending onto Kilbarry Road, crossing into Cork Road (R680) travelling the length of Cork Road before terminating outside the IDA Industrial Estate on Brown’s Road, linking the proposed Waterford Energy Centre building to future heat customer buildings in the area. Ancillary development will consist of security fencing, access and parking, drainage infrastructure, and landscaping works at the proposed energy centre building. Site preparation will involve foundation works, and construction of essential access facilities to support overall functionality for the purpose of generating renewable heat energy and transmitting it to future heat customer buildings in the area (Proposed Development) within the townlands of Kingsmeadow, Pastimeknock, Kilbarry and Ballynaneashagh, Waterford City, County Waterford. A 10 year permission is sought for the construction of the proposed development. Forthe purposes of the Renewable Energy DirectiveIII(Directive(EU)2023/2413),the proposed development includes relevant solar energy development comprising approximately21.6kWofroofmountedsolar PV and the installationof3no. small scale1.5MWnon-ground, air source heat pumps. InaccordancewithArticle239of the PlanningandDevelopmentRegulations2001(as amended)
View the full application file on the council's planning portal →Application Timeline
Application received
27 Aug 2026
Decision due (upcoming)
21 Oct 2026
Application Details
- Location
- Kingsmeadow Pastimeknock , Kilbarry Ballynaneashagh , Waterford City County Waterford
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Waterford City and County Council
- Site Area
- 3.4 ha
Timeline
- Registration Date
- 27 August 2026
- Status
- PRE_VALIDATION
- Decision
- N/A
- Decision Due
- 21 October 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Section 254 Licence Application for 15m high telecommunications smart streetpole solution
R680 Cork Road/Claremont Road Junction , Waterford City
Section 254 Licence for Streetpole and Cabinet which are already in place and licence is due to expire in August 2024
Cork Road , Claremont , Waterford
for the proposed internal changes of use of 795 sqm tenant office space to the provision of medical clinical services and associated facilities
Former Waterford Crystal Offices and showrooms , Cork Road , Kilbarry
for Amendments to previously granted Planning Permission Ref. No. 19/425. Proposed changes to consist of: A. Change of use of previously granted 906m2 restaurant area to office space. B. Alterations to internal layout to consist of additional office space of 154.5m2. C. Alterations to facades including provision of additional entrance or exit doors to facilitate alterations to internal layout. D. Alterations to external finish materials. E. Alterations to screening for roof plant areas. F.Alterations to car park areas to include alterations to existing car park entrance, additional 27 No. car parking spaces, additional cycle shelters, provision of car charging stations and expansion of existing site access road. G. Alterations to landscaped areas. H. New, stand-alone ESB Substation and switch room building. I.Relocation of bin store.
Former Waterford Crystal Factory , Cork Road Killbarry , Waterford
works consisting of the following: A. Replacement of the cladding and glazing on all elevations of the existing three storey office block. B. Alterations to existing internal layout and elevations to include removal and relocation of existing windows and doors. C. Construction of a 920m2 office extension at ground floor, first floor and second floor level. D. Construction of a 1760m2 third floor level over the existing and extended office block. E. Change of use of a section of the former showrooms to office use. F. Provision of a food court and retail unit in a section of the former showrooms. G. Demolition of single storey former restaurant. H. Construction of an outside tiered seating along with a new pedestrian access to the Cork Road. Planning permission is also sought for car parking, lighting, drainage connections and all associated site works
The Former Waterford Crystal Offices & Showrooms , Cork Road , Kilbarry
Extension of Duration of Planning Ref: 19/425 for A. Replacement of the cladding and glazing on all elevations of the existing three storey office block. B. Alterations to existing internal layout and elevations to include removal and relocation of the existing windows and doors. C. Construction of a 920m2 office extension at ground floor, first floor and second floor level. D. Construction of a 1760m2 third floor level over the existing and extended office block. E. Change of use of a section of the former showrooms to office use. F. Provision of a food court and retail unit in a section of the former showrooms. G. Demolition of single storey former restaurant. H. Construction of an outside tiered seating along with a new pedestrian access to the Cork Road. Planning Permission is also sought for car parking, lighting, drainage connections and all associated site works at the Former Waterford Crystal Offices & Showrooms
Kilbarry , Cork Road , Waterford
for minor amendments to Reg. Ref: 25/163 for installation of external signage and manifestations, comprising 1No. 4.78m long x 1.9m high external illuminated sign and 1No. 7.5m long x 3.5m high window manifestation with eye logo on southern elevation, and 1No. 4.43m long x 1.2m high external illuminated sign on eastern elevation.
Former Waterford Crystal Offices and Showrooms , Cork Road , Waterford
minor amendments to Reg. Ref: 25/163 for installation of external signage and manifestations, comprising 1No. 4.78m long x 1.9m high external illuminated sign and 1No. 7.5m long x 3.5m high window manifestation with eye logo on southern elevation, and 1No. 4.43m long x 1.2m high external illuminated sign on eastern elevation
Former Waterford Crystal Offices and Showrooms , Cork Road , Waterford
for the following Large-Scale Residential Development (LRD) comprising of the construction of a student accommodation development which will consist of the construction of 85 no. student accommodation apartments (ranging in size from 5-bed apartments to 8-bed apartments) comprising a total of 582 no. bed spaces in 4 no. blocks ranging in height from 4-6 storeys, with student amenity facilities including 1 no. retail/cafe unit, communal areas, laundry room, reception, student and staff facilities, storage, ESB substation/switch room, bin and general stores and plant rooms. The development also includes the provision of landscaping and amenity areas including a central courtyard space, public realm/plaza (fronting on to the Cork Road), the provision of a set down area, 1 no. vehicular access point onto Ballybeg Drive, car and bicycle parking, footpaths, signage, boundary treatment, pedestrian and cycle improvements to Lacken Road (including a pedestrian crossing) and all ancillary development including pedestrian/cyclist facilities, lighting, drainage (including 2 no. bio retention ponds and upgrades to existing culverts), landscaping, boundary treatments and plant including PV solar at roof level. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application. The NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority.
Cork Road , Kilbarry Road and Ballybeg Drive at Kilbarry , Cork Road Waterford
for the following Large-Scale Residential Development (LRD) comprising of the construction of a student accommodation development which will consist of the construction of 85 no. student accommodation apartments (ranging in size from 5-bed apartments to 8-bed apartments) comprising a total of 582 no. bed spaces in 4 no. blocks ranging in height from 4-6 storeys, with student amenity facilities including 1 no. retail/cafe unit, communal areas, laundry room, reception, student and staff facilities, storage, ESB substation/switch room, bin and general stores and plant rooms. The development also includes the provision of landscaping and amenity areas including a central courtyard space, public realm/plaza (fronting on to the Cork Road), the provision of a set down area, 1 no. vehicular access point onto Ballybeg Drive, car and bicycle parking, footpaths, signage, boundary treatment, pedestrian and cycle improvements to Lacken Road (including a pedestrian crossing) and all ancillary development including pedestrian/cyclist facilities, lighting, drainage (including 2 no. bio retention ponds and upgrades to existing culverts), landscaping, boundary treatments and plant including PV solar at roof level. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application. The NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority.
Cork Road , Kilbarry Road and Ballybeg Drive at Kilbarry , Cork Road Waterford
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.