← Back to search

Maoil an Choirnigh , Rinn o gCuanach , Dungarvan

N/A

Planning application 2660883

Waterford - Waterford City and County Council

Proposed Development

Part Single Storey and Part One and a Half Storey Dwellinghouse, a Revised Double Entrance Design to replace existing entrance, Wastewater Treatment System and Percolation bed and all associated site development works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Nov 2026

  2. Decision due (upcoming)

    22 Jan 2027

Application Details

Location
Maoil an Choirnigh , Rinn o gCuanach , Dungarvan
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Waterford City and County Council
Site Area
0.237 ha

Timeline

Registration Date
19 November 2026Other applications received that week
Status
PRE_VALIDATION
Decision
N/A
Decision Due
22 January 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

151m
2072CONDITIONAL10 Feb 2020

to construct extension to the rear of my house comprising a utility room and kitchen extension in accordance with the drawings submitted

Mweelahorna , Ring , Co Waterford

151m
19960N/A13 Dec 2019

to construct an extension to the rear of house comprising a utility room and kitchen extension in accordance with the drawings submitted

Mweelahorna , Ring , Co. Waterford

428m
263N/A21 Jan 2026

a c.200KWp renewable energy solar PV installation consisting of up to c.400m2 (472 no) Ground Mounted solar panels and all associated works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413)

Rinn O gCuanach , Dun Garbhan , Co Waterford

428m
2641CONDITIONAL1 May 2026

a c.200kWp renewable energy solar PV installation consisting of up to c.400m2 (472No) Ground Mounted solar panels and all associated works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413)

Rinn Ó gCuanach , Dún Garbhán , Co. Waterford

428m
25173N/A15 Dec 2025

a c.200 KWP renewable energy solar PV installation consisting of up to c.400m2(472No) ground mounted solar panels and all associated works

Rinn O gCuanach , Dun Garbhan , Co Waterford

478m
18247CONDITIONAL13 Apr 2018

the indefinite retention of 1. a rear extension consisting of a kitchen/living room and sunroom 2. a rear extension consisting of an en-suite

2 Mweelahorna , Ring , Dungarvan

543m
2460055CONDITIONAL2 Feb 2024

Additional blocks of accommodation for adults in the form of 3 log cabin type units, additional parking bays and ancillary site works

Rinn Ó gCuanach , Dún Garbhán , Co. Phort Láirge

553m
20818CONDITIONAL5 Nov 2020

a iarraidh ar an Udaras thuasluaite chun sheomra ranga nua a thogaint mar aon le seomra stoir agus leithreas: seomra acmhainne nua; forhalla iontrala nua; chomh maith le aistraithe inmheanacha laistigh de'n scoil. Ta se ar intinn chomh maith sli isteach nua do choisithe a thogaint chomh maith le ceangal leis an gcoras searachais ata ann cheana fein agus oibreacha eile riachtanacha ar shuiomh

Scoil Naisiunta na Rinne , Maoil a Choirnigh , An Rinn

601m
1992CONDITIONAL15 Feb 2019

ná cur leis an tslí isteach ar chúl agus an seomra chruinnithe pobail ar an gcéad úrlar atá ann cheana fhéin. Táthar ag lorg cead athrú ábhartha úsáide chomh maith do seomra iarscoile a dhéanamh de sheomra chruinnithe pobail thuas staighre, chomh maith le athraithe a dhéanamh ar an seomara atá ann cheana fhéin ar an gcéad urlár agus aon oibreacha ginearálta eile riachtanacha ar an láithreán tógála

Ionard Pobail na Rinne , Maoil a 'Chóirnigh , An Rinn Dún Garbhán

603m
2660218CONDITIONAL8 Apr 2026

a single storey extension to an existing single storey dwelling, new roof lights to existing roof, demolition and replacement of the existing entrance porch structure (replaced with similar but bigger footprint) and all ancillary works

An Tigín Aerach Mweelnahorna , Ring Dungarvan , Co. Waterford

Affected by this application?

Open for submissions
29days left to make a submission

Observations close on Wednesday 23 December 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.

Check if you have grounds — free

Two questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?