Athlone Business Park , Kilmacuagh Bunahinley , Dublin Road Athlone

CONDITIONAL

Planning application 2360199

Westmeath - Westmeath County Council

Proposed Development

development which will consist of : The Construction of a Temporary Car parking Facility for 195 cars complete with new entrance off existing road network, new fencing, gates, public lighting, landscaping and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    30 Jun 2023

  2. Further information requested

    21 Aug 2023

  3. Further information received

    6 Sept 2023

  4. Decision due

    3 Oct 2023

  5. Decision: CONDITIONAL

    3 Oct 2023

  6. Grant issued

    16 Nov 2023

Application Details

Location
Athlone Business Park , Kilmacuagh Bunahinley , Dublin Road Athlone
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Westmeath County Council
Site Area
0.611 ha

Timeline

Registration Date
30 June 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
3 October 2023
Grant Date
16 November 2023
Permission Expires
15 November 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

157m
2441CONDITIONAL11 Jun 2024

development which will consist of amendments and extension to the existing car park (c. 2,517sqm) to provide segregated parking for 13 no. HGV's a dedicated pedestrian route and all associated site development works

The Mail Centre , Athlone Business Park , Kilmacuagh Athlone

180m
2560543CONDITIONAL6 Nov 2025

development will principally consist of the reversion of the premises (2,116 sq m) from its current use as a distribution hub to the previously permitted use as a builders’ merchants; removal of the existing mezzanine (182 sq m), and provision of two new mezzanine areas (670 sq m and 133 sq m); internal modifications; elevational changes including the provision of a roller shutter door on the east elevation and 3 No. fire escape doors on the east, west and south elevations; a canopy structure attached to the south elevation; new signage including elevational signage and an illuminated freestanding sign (3 m in height); provision of a security hut (5.3 sq m); the omission of 1 No. car parking space to facilitate cycle parking; the minor repositioning of car parking spaces; HGV loading bays; external storage; hard and soft landscaping; and all associated site and development works above and below ground. The gross floor area of the building will increase from 2,116 sq m to 2,737 sq m, and the maximum building height of 10.265 m will remain unchanged

A site of 1.26 Ha at Athlone Business Park , Dublin Road Athlone , Co. Westmeath

182m
197222CONDITIONAL23 Oct 2019

Erection of one internally illuminated wall sign and two non-illuminated wall signs to replace existing

Athlone Business Park , Dublin Road , Bunnahily

237m
2460473CONDITIONAL12 Dec 2024

construction of a new Warehouse / Garage Unit and associated office space (1,054 sqm total) for the servicing / maintenance of vehicles, primarily trucks and vans. The proposed development will include all earthworks, drainage infrastructure and attenuation, landscaping, security fencing / boundary treatment, car parking spaces, truck parking spaces, bicycle parking spaces, and all other associated site development works above and below ground level. The proposed development will include all associated site development works with connections to existing services previously permitted and constructed

Athlone Business Park Kilmacuagh (Castlemaine) TD. , and Bunnahinly TD. , Athlone

243m
21234REFUSED30 Apr 2021

The construction of a single-storey discount foodstore (with ancillary off-licence sales) of 2,494sqm gross floor space; demolition of structures on site (including the dismantling and removal of the car sales showroom structure for reuse elsewhere); provision of 128 surface car parking spaces (including electrical vehicle charging spaces); reuse and minor adjustments to an existing northerly vehicular access and closure of the southerly vehicle access point; various pedestrian access points and boundary treatments (including a new pedestrian access point in the existing wall on the northern boundary of the site) and retaining structures; a new public plaza area fronting on to Dublin Road; cycle parking spaces; trolley bay enclosure (58sqm); hard and soft landscaping, drainage and water services; roof plant including photovoltaic panels and all other ancillary and associated works, including ESB substation building (26sqm). Signage on the proposed store and a "flagpole" sign. The proposed store would replace the applicant's existing trading store, located immediately to the north west of the application site. Site area is 1.06 hectares.

Colm Quinn Motorstore , Athlone Business Park , Dublin Road

249m
22497CONDITIONAL13 Oct 2022

The development will consist of the installation of 2 No. HVO fuel above ground storage tanks (a 80,000 litre and a 50,000 litre tank), the relocation of an existing 12,000 litre HVO fuel above ground storage tank and an existing 1,000 litre Ad Blue above ground storage tank, the installation of 2no. fuel pumps and all ancillary site works

Athlone Business Park , Dublin Road , Kilmacuagh (Castlemaine)

329m
187106CONDITIONAL12 Jun 2018

Alterations include 15sqm extension to the restaurant area, 7.2sqm extension to freezer and chiller and 0.5sqm extension to pay booth, total 22.7sqm, removal of existing doors at entrance lobby to be replaced with automatic sliding doors. New roof cladding over existing roof, additional signage to North and West elevations, reduction of yard to the rear of the building. additional drive thru ,lane with order point, 3no. menu signs, 1no additional grill bay parking space and pedestrian crossing and associated site works

Creggan Roundabout , Dublin Road , Athlone

334m
22470CONDITIONAL27 Sept 2022

erect 1256.36 sq m of photovoltaic panels on the roof of the existing building in our factory, trading as DPD HQ Ireland, with all associated site works

Athlone Business Park , Dublin Road , Athlone

348m
2560100CONDITIONAL11 Mar 2025

development consisting of proposals to retain the existing use of Willow Park Community House as a community centre and construct new single-storey extensions to either end of the existing building; Construct a new canopy along the length of the building; Alter the existing building and carry out associated site works. The site works will comprise new fencing, drainage, hard & soft landscaping, relocation of existing sheds and works to widen the existing site entrance. The proposed works will be carried out in two phases. Phase 1 will comprise an extension to Room no.1, alterations to the existing building, a new canopy and associated site works. Phase 2 will comprise an extension to Room no.2, associated canopy, relocation of existing sheds and associated site works

133 Meadowbrook , Willow Park , Athlone

352m
197013CONDITIONAL18 Jan 2019

The erection of a steel frame & cladding for a wheelie bin storage area (28sq m) & the erection of 7 no. bike racks to the west side of the NCT centre together with all associated site works.

Kilmartins N6 Centre , Bunahinly Brawney , Dublin Rd