Wineport , Ballykeeran Athlone , Co.Westmeath
CONDITIONALPlanning application 2360455
Westmeath - Westmeath County Council
Proposed Development
development which will consist of demolition of the existing dwelling and construction of a one and a half-story dwelling in lieu of the existing house including new garage, new site entrance, new driveway, together with all ancillary site works. Natura Impact Statement has been prepared in respect of this planning application
View the full application file on the council's planning portal →Application Timeline
Application received
20 Dec 2023
Decision: CONDITIONAL
21 Feb 2024
Decision due
22 Feb 2024
Grant issued
5 Apr 2024
Application Details
- Location
- Wineport , Ballykeeran Athlone , Co.Westmeath
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Westmeath County Council
- Site Area
- 0.391 ha
- Floor Area
- 275 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 20 December 2023
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 21 February 2024
- Grant Date
- 5 April 2024
- Permission Expires
- 4 April 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
development which will consist of demolition of the existing dwelling and construction of a one and a half-story dwelling in lieu of the existing house including new garage, new site entrance, new driveway, together with all ancillary site works
Wineport , Ballykeeran Athlone , Co.Westmeath
(1) Agricultural slatted cattle shed incorporating slatted areas, underground slurry storage tanks and concrete apron (2) Dungstead for existing stable (3) and all ancillary and associated site works
Wineport , Ballykeeran , Athlone
The development will consist of a raw water intake works and WTP. The Intake Works will contain a building incorporating a pump room, control rooms, (¡Ü7.0m high above a 6.4m deep sump) and ESB substation, siteworks and landscaping at the Portaneena Amenity Area. The WTP will contain the following structures: 3 Nr Inlet Contact Tanks: ¡Ü5.0m (h = height) Main treatment building:¡Ü9.6m (h); Chemical Storage Tanks: 2 Nr @ 8.0m (h), 2 Nr @5.2m (h) and 4 Nr @ 4.5m (h); 5 Nr Filters:¡Ü5.5m (h) Pipework Gallery: ¡Ü7.5m (h) Backwash Tank:¡Ü3.5m (h) Contact/Clear Water Tank: ¡Ü3.5m (h) Used Washwater Tank: ¡Ü3.5m (h) Dewatering Building : ¡Ü8.8m (h) 2 Nr Washwater Clarifiers: ¡Ü7.0m (h) 2 Nr Sludge Thickening Tanks: ¡Ü5.5m (h) Sludge Balance Tank: ¡Ü5.5m (h) Chemical Dosing Building: ¡Ü7.5m (h) Pump Building:¡Ü4.7m (h) ESB substation with MCC room: ¡Ü3.2m (h) Admin/Control Building: ¡Ü6.2m (h) The development will also include access and site roadways, parking and hardstanding areas, landscaping, external lighting, security fencing, drainage and all associated ancillary works and infrastructure and other enabling civil works. Significant additional data and a revised NIS in relation to this application have been furnished to the planning authority and are available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy.
Killinure Water Treatment Plant , Portaneena , Athlone
The proposed development comprises a raw water Intake Works and Water Treatment Plant (WTP) at Killinure Lough within the Portaneena townland, Athlone, Co Westmeath. The Intake Works will contain a building incorporating a pump room, control rooms, and ESB substation ( 7.0m high above a 6.35m deep sump) siteworks and landscaping at the Portaneena Amenity Area. The WTP will contain the following structures: 3 NR Inlet Contact Tanks: 5.0m (h); Main treatment building: 9.6m (h); Chemical storage tanks: 2 Nr @ 8m (h), 2 Nr @ 5.2 (h) and 4 Nr @4.5m (h); 5 Nr Filters: 5.5m (h), pipework gallery 7.5 m (h); Backwash tank 3.5m (h); used washwater tank 3.5m (h) Dewatering building:8.8m (h); 2 Nr Washwater clarifiers: 7.0 m (h) 2 Nr sludge Thickening Tanks: 5.5m (h) Sludge Balance Tank:5.5m (h)Chemical dosing building 7.46m (h), pump building 4.7m (h) ESB substation with MCC room: 3.237m (h) Admin/Control Building 6.3m (h). The development will also include access and site roadways, parking and hardstanding areas, landscaping, external lighting, security fencing, drainage and all associated ancillary works and other enabling works.
Killinure Water Treatment Plant , Portaneena , Athlone
Construction of a two-storey wellness phase in the form of a two-storey extension to the existing building (and including small plant room and yard at basement level). The extension will contain reception, changing, waiting area and small treatment rooms and small balcony at first floor plus relaxation area and a small pool at ground floor plus change of existing store to changing area, together with associated alterations to existing building, external ground finishes, and connections to existing underground services together with the addition of new small balcony area serving existing first-floor bedrooms. The application also includes the removal of existing small relaxation room at existing ground floor corridor and the construction of two infill bedrooms in existing gap space (one at ground floor and one at first floor thereover). A Natura Impact Assessment has been prepared in respect of the proposed development.
Portaneena , Glasson
To convert existing function room into 3 no guest rooms and to construct new function room (including toilets, functions bar, store and roof terrace) as an extension to the existing first floor of the building plus associated new structure, stair and service lift to ground floor and associated alterations to existing building. The works will also include small extension to existing kitchen including new roof and glazing to same, together with associated internal modifications to existing building and its external areas/underground services
Wineport Lodge , Portaneena , Glasson
to construct 3 no floating ‘pod’ type guest rooms together with associated small link deck, associated drainage and water services connections to Wineport Lodge existing services and associated works, located at Wineport Lodge. The application includes an Appropriate Assessment Screening Report
Wineport Lodge Portaneena , Glasson , Athlone
to construct a storage shed and associated site works
Wineport , Portaneena , Glasson
development which will consist of the following: (i) Demolition of existing dwellings porch and demolition of shed adjacent to dwelling (ii) permission for an extension to north east and north west elevations of existing dwelling (iii) rooflights to north west and south east elevations (iv) minor alterations to existing elevations (v) conversion of attic space to a study and storage space (vii) revised site boundaries and all associated site works
Portaneena , Glasson , Co. Westmeath
Demolition of existing dwelling and the construction of a new two-storey dwelling and all associated site works
Birch Quay , Ballykeeran , Athlone
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?