17 Robinstown Cottages , Mullingar , Co. Westmeath
CONDITIONALPlanning application 2460003
Westmeath - Westmeath County Council
Proposed Development
alteration, refurbishment and extension of property. The work to be undertaken will include the installation of a new waste water treatment system and associated site works and the demolition of the existing flat roofed extension which will be replaced by a new extension. This new extension will be constructed in accordance with current planning requirements and modern building standards
View the full application file on the council's planning portal →Application Timeline
Application received
2 Jan 2024
Further information requested
26 Feb 2024
Further information received
27 Feb 2024
Decision: CONDITIONAL
22 Mar 2024
Decision due
25 Mar 2024
Grant issued
30 Apr 2024
Application Details
- Location
- 17 Robinstown Cottages , Mullingar , Co. Westmeath
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Westmeath County Council
- Site Area
- 0.17 ha
- Floor Area
- 74.5 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 2 January 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 22 March 2024
- Grant Date
- 30 April 2024
- Permission Expires
- 29 April 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
RETENTION of our existing extension at rear to include porch, kitchen, hall, w.c. and lounge and to construct an extension to the rear of our dwelling to include a bedroom, wardrobe and en-suite with all ancillary site works
7 Robinstown Cottages , Mullingar , Co. Westmeath
erection of 1 no. free standing Totem sign with associated site works located at the site entrance of Lough Sheever Corporate Park
Lough Sheever Corporate Pk , Robinstown , Mullingar
development consisting of the provision of commercial buildings arranged in 6 no. blocks. Block Z1, Z2 & Z3 comprise 2559.3 sq. M. Retail Warehousing with ancillary office and wc facilities; Blocks Z4 & Z5 comprise 3683.1 sq. m. of office space over 3 and 4 no. stories; Block Z6 comprises a 173.4 sq. m. café; an esb sub station and switch room; entry is via 2 no. access points of the corporate park service road comprising an existing entrance and new vehicular entrance. The development will provide 204 no. parking spaces, including EV charge points, and 76 no. cycle spaces; HGV set down areas; ancillary hard and soft landscaping, bin stores, signage, public lighting, boundary treatments and all associated site works
Lough Sheever Corporate Park Robinstown Roundabout , Robinstown , Mullingar
development which will consist of the provision of commercial buildings arranged in 5 no. blocks. Block Z1 & Z2 comprising 3315 sq. M. of warehousing with ancillary office and wc facilities; Blocks Z4 & Z5 comprise 3683.1 sq. m. of office space over 3 and 4 no. stories; Block Z6 comprising of 377.5m² of café and office space.; an esb sub station and switch room; entry is via 2 no. access points of the corporate park service road comprising an existing entrance and new vehicular entrance. The development will provide 161 no. parking spaces, including EV charge points, and 76 no. cycle spaces; HGV set down areas; ancillary hard and soft landscaping, bin stores, signage, public lighting, entrance totem, boundary treatments and all associated site works
Lough Sheever Corporate Park , Castlepollard Road , Mullingar Co. Westmeath
comprising an International Film Studio Campus, as incorporates, an international base for Headquarters Administration and Office space of 10,388 sqm, a 4 to 5 storey building; 4 no. Film/TV Sound studios in 2 no. blocks of 5330 sqm and 5068 sqm respectively; a workshop building for set and prop construction 5142 sqm, an ESB substation 38 sqm, security office 10.5 sqm with associated barrier controlled entry system, all associated parking spaces, 278 no. car, 11 no. articulated truck, 7 no. motorhome & 50 no. cycle, internal road layouts, above and below ground services as includes for; the rerouting of the 38kV ESB underground cabling and associated amendments to the 110kV high voltage overhead line by means of a 110kV earthwire poleset relocation and associated works; on site wastewater pumping station, surface water attenuation area and flood compensation areas, solar photovoltaic panels at roof level to office and workshop buildings, sedum roofs to office elements of the workshop and studio buildings; landscaping and boundary treatments and a new access road from the existing roundabout.
Lough Sheever Corporate Park , Robinstown (Levigne) Td , Mullingar
proposed single storey extension to the rear of the existing warehouse including associated ancillary site development works and services alterations
Lough Sheever Corporate Park , Mullingar , Co.Westmeath
new extension to the existing Wines Direct Warehouse with associated site development works and services alterations, the proposed extension will be consistent with the current building form and finishes
Wines Direct , Lough Sheever Corporate Park , Mullingar
development for a temporary car park of total 126 no. spaces on a site of 0.88 hectares at, Site 45 Lough Sheever Corporate Park, Robinstown, Mullingar, Co. Westmeath. The proposed temporary car park will facilitate 9 no. additional HGV spaces in the existing Regional Distribution Centre (RDC) apron, by the removal and relocation of 55 car parking spaces along with an additional, to be provided, 71 no. car parking spaces totalling 126 no. car spaces in the area designated for temporary parking. The proposed development will include a new dedicated segregated access for car parking off the existing roundabout serving Sites 45 & 46 and a linked internal bridged access over the existing perimeter swale to connect to the existing car park. The proposed development will incorporate landscaping treatment, boundary fencing, tarmacadam access roads and access footpaths and compacted temporary loose material as specified for parking areas.
Site 45 Lough Sheever Corporate Park , Robinstown , Mullingar
Erection of a low level boundary wall with wire mesh fencing over, erection of entrance gates, erection of metal palisade fencing to side boundary and all ancillary site works
Lands adjacent Unit 14 , Lough Sheever Corp Park , Mullingar
the development to be retained comprises of modifications to permitted site layout granted under Application Register Reference 07/5463 and all other associated site development works to include the following: (i) construction of external storage compound which adjoins existing retail building (GFA 40sqm.); (ii) an extended car parking area with additional hardstanding which incorporates 9no. car parking spaces along with the retention of 10no. additional car parking spaces within the site; (iii) the relocation of existing services area to southern corner; (iv) the relocation of existing jet wash to western boundary; (v) the relocation of vent stack and fuel filling points to northern boundary and; (vi) 2no. non-illuminated box signs which front onto public road
Texaco Robinstown Filling Station , Robinstown Mullingar , Co. Westmeath
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?