Clonfad , Dalystown Mullingar , Co. Westmeath
N/APlanning application 2460037
Westmeath - Westmeath County Council
Proposed Development
construction of a dwelling consisting of two new bedrooms and living quarters that will incorporate the use of existing buildings. The application will also include a new effluent treatment system with percolation area all other landscaping, site-works and drainage
Application Details
- Location
- Clonfad , Dalystown Mullingar , Co. Westmeath
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Westmeath County Council
- Site Area
- 0.291 ha
Timeline
- Registration Date
- 16 February 2024
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construction of a dwelling consisting of two new bedrooms and living quarters that will incorporate the use of existing buildings. Retention permission for the refurbishment of said buildings and change of use of the existing structures from an agricultural shed to form part of the domestic house is also being sought. The application will also include a new effluent treatment system with percolation area all other landscaping, site-works, and drainage
Clonfad , Dalystown Mullingar , Co. Westmeath
to construct one number detached two storey dwelling, one number detached single storey garage, to relocate and upgrade existing entrance to public road, to connect to public watermain, to install a septic tank and percolation area and all associated site works at
Clonfad , Dalystown , Co. Westmeath.
change of design to that previously granted planning permission under File Ref no. 15/6046 consisting of single storey extension to side (south) elevation, form new entrance to house front (east) elevation and replace the existing entrance door with a window and remove existing door on side (south) elevation and replace with a window and minor internal alterations to the existing house.
Clonfad , Dalystown , Mullingar
permission to construct a new carpark to act as an overflow for existing car park and all associated site works.
Rathnure , Dalystown , Mullingar
construction of a new carpark to act as an overflow for existing car park and all associated site works
Rathnure Dalystown , Mullingar , Co Westmeath.
reposition the domestic vehicular entrance, 18m southeast along the existing boundary of the proposed site and to close existing agricultural entrance. Permission is also sought to construct a new single storey dwelling, the installation of a packaged waste water treatment system and polishing filter and all associated site works.
Clonfad , Dalystown , Co.Westmeath
to reposition the domestic vehicular entrance, 18m southeast along the existing boundary of the proposed site and to close existing agricultural entrance. Permission is also sought to construct a new single storey dwelling, the installation of a packaged wastewater treatment system and polishing filter and all associated site works
Clonfad , Dalystown , Co Westmeath
to construct a new single storey dwelling, treatment system, percolation area and all associated site works.
Clonfad , Dalystown , Co. Westmeath.
to reposition the domestic vehicular entrance, 18m southeast along the existing boundary of the proposed site and to close existing agricultural entrance. Permission is also sought to construct a new single storey dwelling, the installation of a packaged waste water treatment system and polishing filter and all associated site works
Clonfad , Dalystown , Co Westmeath
to reposition the domestic vehicular entrance, 18m southeast along the existing boundary of the proposed site and to close existing agricultural entrance. Permission is also sought to construct a new single storey dwelling, the installation of a packaged waste water treatment system and polishing filter and all associated site works
Clonfad , Dalystown , Co Westmeath
The submission window has closed
Observations on this application closed on Thursday 21 March 2024, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?