Site 40 Lough Sheever Corporate Park , Robinstown , Mullingar
CONDITIONALPlanning application 2560169
Westmeath - Westmeath County Council
Proposed Development
Change of use of the existing warehouse section of Unit 40 into office and the construction of a first-floor office area within the structure of the existing warehouse. Permission is also sought for all the associated elevation changes in terms of new windows and doors and removal of some existing windows and roller shutter door. Permission is also required for revised car park/ yard layout, ancillary structures including bin stores, bicycle shelter and all associated site development works to complete the development.
View the full application file on the council's planning portal →Application Timeline
Application received
9 Apr 2025
Decision due
3 Jun 2025
Decision: CONDITIONAL
3 Jun 2025
Grant issued
10 Jul 2025
Application Details
- Location
- Site 40 Lough Sheever Corporate Park , Robinstown , Mullingar
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Westmeath County Council
- Site Area
- 0.36 ha
Timeline
- Registration Date
- 9 April 2025
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 3 June 2025
- Grant Date
- 10 July 2025
- Permission Expires
- 9 July 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
development consisting of an Electrical Vehicle (EV) Charging Station, site of 0.14Ha. The development will consist of 5 no. EV charging stations, 3 no. canopies incorporating approx. 17 sqm in area of solar panels per canopy, 1 no. disabled access public convenience (WC), 1 no. ESB substation, 1 no. SSE substation with new access to and egress form the site and all associated landscaping and above and below ground ancillary works
Site 36 Lough Sheever Corporate Park , Robinstown , Mullingar
the construction of a new CVRT Centre (Commercial Vehicle Roadworthiness Testing Centre) with a total floor area of 780m2. The building will consist of 600m2 ground floor area with 2 testing lanes, reception, offices, waiting areas and toilets together with 180m2 of first floor area with additional waiting areas, toilets, offices and storage together with site landscaping, covered bicycle shelter and all associated site works including carparking with 1 No. EV charging space, 2 No. bus EV charging points and 1 No. accessible EV charging space. The works will also include for alterations of existing site entrance – enlargement of existing automatic gate system, a new pedestrian gate and new 7m wide exit only gate from the site onto existing estate road
Site 39 Lough Sheever Corporate Park , Ballyglass Mullingar , Co. Westmeath.
the Construction of a new CVRT Centre (Commercial Vehicle Roadworthiness Testing Centre) with a total floor area of 780m2. The building will consist of 600m2 ground floor area with 2 testing lanes, reception, offices, waiting areas and toilets together with 180m2 of first floor area with additional waiting areas, toilets, offices and storage together with site landscaping, covered bicycle shelter and all associated site works including carparking with 1 No. EV charging space, 2 No. bus EV charging points and 1 No. accessible EV charging space. The works will also include for alterations of existing site entrance – enlargement of existing automatic gate system, a new pedestrian gate and new 7m wide exit only gate from the site onto existing estate road. An AA Screening Report and NIS (Natura Impact Statement) have been submitted as part of the application
Site 39 Lough Sheever Corporate Park , Ballyglass Mullingar , Co. Westmeath.
Proposed new site entrance gates with piers, new front boundary wall with metal fencing and site boundaries together with all associated site works
Site 39 , Lough Sheever Corp Park , Robinstown
development which will consist of: (a) The construction of a three-storey, multiple occupant building, capable of accommodating various enterprise users. The office use will be as described under class 3 of article 10 part 4 of the 2001 planning and development regulations. (b) Connection to existing services within the estate including foul, watermain and surface water drainage services. (c) The works will also include: provision of a new site entrance to the existing estate access road, modification of the existing footpath, new footpaths, paving, parking, boundary treatments, ancillary structures including bin stores, bicycle shelter and all associated site development works to complete the development
Site 38 Lough Sheever Corporate Park , Robinstown , Mullingar Co.Westmeath
development of a truck parking area with an office building, repair shed, overground fuel storage, perimeter fence and associated site works
34 Lough Sheever Corporate Park , Robinstown , Mullingar
Modification to previously granted and amended Lidl Regional Distribution Centre (RDC) storage and distribution warehouse (WCC REG. Refs 18/6264 & 19/6330) at Lough Sheever Corporate Park, Robinstown (Levinge), Mullingar Co Westmeath. The proposed amendments application comprises modifications to the permitted and subsequent amended scheme as follows; the demolition of units 32A, B & C (539.2 sqm) and provision of a new HGV Parking Area of 56 no. spaces and associated driver welfare building (81 sqm) HGV parking provision totals 90 no. space as per previously approved 83 no, a further reduced staff and operational car park area as totals 244 no. car parking spaces 317 previously approved, further revisions and modifications to the existing administration block for a total floor area of 1,479 sqm, 1,791 sqm previously granted, revisions to roof profiles of extended warehouse as amended and permitted with total height increased by 0.8m from 15.465m to 16.265m, reconfigured surface water layout as facilities a new attenuation pond of 800 cubic meter capacity. The amendments as otherwise referred relies on the previously granted scheme 18/6264 as revised by 19/6330
Lidl Regional Distribution Centre , Lough Sheever Corp Park , Robinstown(Levinge)
change of use from wholesale hardware outlet (WCC Reg. Ref 05/5263) to a Class 5 wholesale warehouse and an extension of the unit by 1,054 sqm. The existing unit of 3,130 sqm and the extension of 1,054 sqm, (947 sqm at ground floor and an additional 107 sqm at 1st floor mezzanine in existing building) will represent a proposed total wholesale warehouse unit area 4,184 sqm, the development also comprises the formation of a new goods delivery access, provision of 52 no. car parking spaces, a secure cycle parking bay providing 8 no. cycle spaces, 3 no. HGV/container parking spaces, all ancillary works above and below ground, landscaping and boundary treatments.
Site 28 (Former Heiton Buckley Unit) , Lough Sheever Corporate Park , Robinstown Mullingar
fix (2 no. total) wall mounted brand identification signage (9.75 x 2.3m approx. each) and associated external lighting to the north-east & south-east elevations.
Site 28 Lough Sheever Corporate Park , Robinstown , Mullingar
construction of a 142.5 sq.m single story extension to the existing Value Centre facility to provide protection from the weather while loading and unloading goods
Unit 28 Lough Sheever Corporate Park , Robinstown , Mullingar
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?