Harbour Street , Mullingar , Co. Westmeath
N/APlanning application 2660413
Westmeath - Westmeath County Council
Proposed Development
RED III - Development which will consist of: The installation of a single biomass boiler enclosure located to the rear of the school and two new 2,000kg LPG tanks located to the side of the site. This site contains two protected structures; Loreto Convent School (15310152 / RPS No. 019-144) and Loreto Convent Graveyard/Cemetery (Reg No: 15310153 / RPS No. 019-145) This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
View the full application file on the council's planning portal →Application Timeline
Application received
6 Aug 2026
Decision due (upcoming)
30 Sept 2026
Application Details
- Location
- Harbour Street , Mullingar , Co. Westmeath
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Westmeath County Council
- Site Area
- 3.127 ha
Timeline
- Registration Date
- 6 August 2026
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 30 September 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
development will consist/consists of the installation of a single biomass boiler enclosure and new 2000 litre LPG tank located to the rear of the site.
Harbour St , Mullingar , Co. Westmeath
development which will consists of the installation of a single biomass boiler enclosure and two new 2,000 litre LPG tanks located to the rear of the site. This site contains two protected structures Reg No: 15310153 and 15310152.
Harbour St , Mullingar , Co. Westmeath
RED III - The development will consist of: The installation of a single biomass boiler enclosure and two new 2,000 litre LPG tanks located to the rear of the site. This site contains two protected structures; Loreto Convent School (15310152 / RPS No. 019-144) and Loreto Convent Graveyard/Cemetery (Reg No: 15310153 / RPS No. 019-145). This development is covered by the provisions of the Renewable Energy Directive III (Directive EU 2023/2413) and it is important to note that the planning permission may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Harbour St , Mullingar , Co. Westmeath
change of use from retail to a coffee shop with signage along the front and rear elevations and associated site works.
Unit 3 Aldi Car Park , Green Road , Mullingar
change of use from Retail use (159sqm) and Office (159sqm) use to Dental surgery use (318sqm), internal fit out works to include the amalgamation of units 2 & 3, front and rear elevation changes with associated signage
Units 2 & 3 , Green Road , Mullingar
change of use from retail unit to a coffee shop with signage along the front and rear elevations and associated site works.
Unit 2 Aldi Car Park , Green Road , Mullingar
Retention permission for an outdoor timber construction seating area of 35.98sqm
Eurospar Supermarket , Green Rd Commons , Mullingar
construction of a single storey detached gym building and all associated site works. The proposed works are within the curtilage of a protected structure, St. Mary’s College (Hevey Institute) – RPS no: 019-157
Coláiste Mhuire , College Street , Mullingar
RETENTION of extension at the front to include a porch and brick finish and at the rear a two storey extension to include on the ground floor dining area, lounge, store, utility and w.c. and on first floor a bedroom, bathroom and w.c
4 St Bridgets Terrace , Mulllingar , Co. Westmeath
to provide 1 no. single storey 158sqm prefabricated structure to comprise of a classroom, sensory room and resource room to be located at the north western corner of the site, associated works including adjusting drainage and other site works.
Harbour Street , Mullingar , Co.Westmeath
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?