← Back to search

Clonmellon Lodge , Killua Clonmellon , Co. Westmeath

N/A

Planning application 2660424

Westmeath - Westmeath County Council

Proposed Development

change of use from private residential to short-term rental accommodation. The property is a single-storey, detached, 6.3m tall building, and is a Protected Structure recorded in the Westmeath County Development Plan 2021-2027, RPS reference number 009-019. Also, a Protected Structure recorded in the Westmeath County Development Plan 2021-2027, RPS reference number 009-018, is within the curtilage of the above mentioned

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Aug 2026

  2. Decision due (upcoming)

    4 Oct 2026

Application Details

Location
Clonmellon Lodge , Killua Clonmellon , Co. Westmeath
Applicant
N/A
Application Type
RETENTION
Planning Authority
Westmeath County Council
Site Area
0.24 ha

Timeline

Registration Date
10 August 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
4 October 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

228m
21211CONDITIONAL20 Apr 2021

construction of a two storey dwelling with detached domestic garage and store and all associated site works

Clonmellon , Co Westmeath

230m
2560295N/A11 Jun 2025

change of house design from that previously granted under Planning Ref: 156121 & to change location of footprint of house and garage and all associated site development works

Clonmellon , , Co. Westmeath

230m
2560317CONDITIONAL24 Jun 2025

for a change of house design from that previously granted under Planning Ref: 166162 & and extension of duration 21211, & to change location of footprint of house and garage and all associated site development works

Clonmellon , Clonmellon , Co. Westmeath

426m
2460239REFUSED8 Jul 2024

extension & renovation of my existing dwelling to include external insulation with lime plaster finish, new windows and doors, two velux windows in the living room and one velux in the bathroom and 9 air vents and to remove roof on extension at the rear and put on a new flat roof and to demolish two chimneys and a shed at rear and to construct a French drain to the front of the dwelling with all ancillary site works

Main Street , Clonmellon , Co. Westmeath

570m
2360226CONDITIONAL18 Jul 2023

Retention of a rear ground floor extension also a window on the rear gable wall to allow for natural light in the attic space and with all associated site development works

Killua , Clonmellon , Co. Westmeath

580m
206334CONDITIONAL30 Nov 2020

Permission to erect a 15m high monopole telecommunications support structure together with antennas, dishes and associated telecommunications equipment and remove the existing 12m high timber pole at the Eir Exchange, Carraig Mhor, Clonmellon, Co. Westmeath.

Eir Exchange , Carraig Mhor , Clonmellon

615m
2460152CONDITIONAL6 May 2024

the erection of an aluminium framed awning over patio area, attached to the rear façade of the existing dwelling and all associated site works

4 Carraig Mhor , Clonmellon , County Westmeath

700m
21457CONDITIONAL16 Aug 2021

Permission to demolish existing garage at side of house and construct a two storey extension comprising en-suite double bedroom, family room and utility area linked to existing house, demolish existing conservatory to rear of the house and construct new kitchen extension. Construct a new single storey detached garage on north east part of site with extended driveway, All existing services on site to be extended and used in the new accommodation.

Killua , Clonmellon , Co Westmeath

700m
2158N/A11 Feb 2021

Renovation and extension of existing house, construction of a new two storey structure to the side of house linked by a glazing unit and separate domestic garage

Killua , Clonmellon , Co Westmeath

720m
196128CONDITIONAL16 May 2019

from retail use to retail use with ancillary off licence use

Main Street , Clonmellon , Co Westmeath

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?