Glenayre House , Newcastle Upper , Newcastle

N/A

Planning application 1986

Wicklow - Wicklow County Council

Proposed Development

18/385 for detached dwelling and ancillary site works including effluent disposal system to current EPA standards and vehicular entrance to serve the proposed dwelling and existing riding arena and stables (existing entrance granted permission under Ref 06/5421 to be closed)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    30 Jan 2019

  2. Further information requested

    19 Mar 2019

  3. Further information received

    24 Apr 2019

  4. Application withdrawn

    20 May 2019

Application Details

Location
Glenayre House , Newcastle Upper , Newcastle
Applicant
N/A
Application Type
PERMISSION CONSEQUENT
Planning Authority
Wicklow County Council
Site Area
0.615 ha
Floor Area
256.38 sq m
Residential Units
1

Timeline

Registration Date
30 January 2019
Status
WITHDRAWN
Decision
N/A
Withdrawn
20 May 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

2m
191373CONDITIONAL19 Dec 2019

Reference Number 18/385, detached dwelling, which will include four bedrooms, reception rooms, garage, landscaping and associated site works. Permission is also sought for vehicular entrance to the site, wastewater treatment unit to EPA 2009 standards and a soil polishing filter on the site in accordance with the outline permission

Glenayre House , Newcastle Upper , Newcastle

7m
1934N/A16 Jan 2019

18/3850 detached dwelling and ancillary site works including effluent disposal system to current EPA standards and vehicular entrance to serve the proposed dwelling and existing riding arena and stables (existing granted permission under Ref 06/5421 to be closed)

Newcastle Upper , Newcastle , Co. Wicklow

11m
18385CONDITIONAL13 Apr 2018

detached dwelling and ancillary site development works including effluent disposal system to current EPA standards and vehicular entrance to serve the proposed dwelling and existing riding arena and stables (existing entrance granted permission under Ref 06/5421 to be closed)

Glenayre House , Newcastle Upper , Newcastle

13m
17948N/A4 Aug 2017

detached dwelling & ancillary site development works including effluent disposal system to current EPA standards with access through existing vehicular entrance

Glenayre , Newcastle Upper , Newcastle

158m
17463N/A26 Apr 2017

13/8961 for a new single storey split level 4 bedroom dwelling (223 sqm) and associated site works including wastewater treatment system, driveway, entrance and landscaping

Site 6 Glebe Lane , The Rectory , Newcastle Upper

158m
17507CONDITIONAL8 May 2017

single storey split level 4 bedroom dwelling (223 sqm) and associated site works including wastewater treatment system, driveway, entrance, and landscaping

Site 6 Glebe Lane , The Rectory , Newcastle Upper

167m
22332CONDITIONAL4 Apr 2022

(a) the construction of a 143sqm two-storey, three bedroom partially submerged, detached dwelling, (b) a new wastewater treatment system and soak-away, (c) 3.6m internal driveway and vehicular access onto Glebe Lane as per grant of permission 17/507, (d) All associated site works and landscaping

0.20ha site at 6 Glebe Lane , Newcastle , Co. Wicklow

182m
18969CONDITIONAL28 Aug 2018

dwelling, wastewater treatment system to current EPA standards and all associated ancillary site works

Site7 , Newcastle Upper , Newcastle

185m
17257CONDITIONAL14 Mar 2017

1 no dwelling and associated effluent treatment system together with associated site works

Newcastle Upper , Newcastle , Co. Wicklow

228m
22228CONDITIONAL10 Mar 2022

demolition of existing barn, provision of a new entrance, new dormer style dwelling, wastewater treatment system to current EPA standards and all associated ancillary site works and services

Newcastle Upper , Newcastle , Co. Wicklow

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?