Tober Upper , Dunlavin , Co. Wicklow
CONDITIONALPlanning application 201101
Wicklow - Wicklow County Council
Proposed Development
construct a dwelling house, secondary sewerage treatment system and percolation area, domestic garage, new entrance, alterations to roadside boundary fence and all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
30 Oct 2020
Further information requested
15 Dec 2020
Further information received
26 Jan 2021
Decision: CONDITIONAL
11 Feb 2021
Decision due
22 Feb 2021
Grant issued
19 Mar 2021
Application Details
- Location
- Tober Upper , Dunlavin , Co. Wicklow
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Wicklow County Council
- Site Area
- 0.32 ha
- Floor Area
- 178 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 30 October 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 11 February 2021
- Grant Date
- 19 March 2021
- Permission Expires
- 18 March 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
section 42 extension of appropriate period - 20/1101 - construct a dwelling house, secondary sewerage treatment system and percolation area, domestic garage, new entrance, alterations to roadside boundary fence and all associated site works
Tober Upper , Dunlavin , Co. Wicklow
dwelling house, secondary sewerage treatment system and percolation area, domestic garage, entrance, alterations to roadside boundary fence and all associated site works
Tober Upper , Dunlavin , Co. Wicklow
revised site layout plan to Planning Application Reference number 20/1101 (planning permission for dwelling house, secondary sewerage treatment system and percolation area, domestic garage, new entrance, alterations to roadside boundary fence and all associated site works). The revisions refer to a new finished floor level to the dwelling house and domestic garage
Tober Upper , Dunlavin , Co. Wicklow
construct no.2 dwelling houses, sewage treatment systems, percolation areas and all associated site works
Tober Upper , Dunlavin , Co. Wicklow
2 no dwelling houses, secondary sewerage treatment systems, domestic garages, alterations to existing roadside boundary fence, new entrance and all ancillary site works
Tober Upper , Dunlavin , Co. Wicklow
2 no dwelling houses, secondary sewerage treatment systems, domestic garages, alterations to existing roadside boundary fence, new entrance and all ancillary site works
Tober Upper , Dunlavin , Co. Wicklow
2 dwelling houses, sewerage treatment systems, percolation areas and all associated site works
Tober Upper , Dunlavin , Co. Wicklow
revised site layout plan to Planning Application Reference number 20/1101 (planning permission for dwelling house, secondary sewerage treatment system and percolation area, domestic garage, new entrance, alterations to roadside boundary fence and all associated site works). The revisions refer to a new finished floor level to the dwelling house and domestic garage
Tober Upper , Dunlavin , Co. Wicklow
dwelling house, on site sewerage treatment system, improvements to existing laneway, connections to group water scheme and all associated site works
Tober Upper , Dunlavin , Co. Wicklow
extraction of sand and gravel from an existing quarry which is additional to that permitted by planning reference 04/699 and substitute consent number SU0012. The proposed additional area is approximately 8.4 hectares where it is proposed to extract sand and gravel at a rate of approximately 70,000 tonnes per annum. The proposed development also includes a portaloo, temporary portacabin office and canteen on site together with all site ancillary works, wheel wash, weighbridge, well pumphouse, berm and fencing. The application is accompanied by an Environmental Impact Statement (not referred to an Environmental Impact Assessment Report (EIAR))
Tober Upper , Dunlavin , Co. Wicklow
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?