← Back to search

Craffield , Aughrim , Co. Wicklow

CONDITIONAL

Planning application 201251

Wicklow - Wicklow County Council

Proposed Development

dwelling, well, effluent treatment system, upgrading existing entrance and associated works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 Dec 2020

  2. Further information requested

    8 Feb 2021

  3. Further information received

    25 Mar 2021

  4. Decision: CONDITIONAL

    8 Apr 2021

  5. Decision due

    21 Apr 2021

  6. Grant issued

    19 May 2021

Application Details

Location
Craffield , Aughrim , Co. Wicklow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Wicklow County Council
Site Area
0.404 ha
Floor Area
235 sq m
Residential Units
1

Timeline

Registration Date
8 December 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
8 April 2021
Grant Date
19 May 2021
Permission Expires
18 May 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

841m
17552CONDITIONAL16 May 2017

and completion of replacement single storey extension to dwelling with new slate roof and velux windows and associated works

Roddenagh Cottage , Roddenagh , Aughrim

844m
17384N/A10 Apr 2017

and completion of replacement single storey extension to dwelling with new slate roof and velux windows and associated works

Roddenagh Cottage , Roddenagh , Aughrim

1.1km
2660718N/A13 Aug 2026

1. retention permission for as constructed dwelling 2. retention permission for garage 3. retention permission for revised site boundaries 4. permission for extension to the side of existing dwelling 5. permission for relocation of 2no roof lights on the rear roof plane

Balleeshal , Aughrim , Co.Wicklow

1.2km
2660755N/A25 Aug 2026

RED III application Level 1 - consist of a ten year planning permission to develop an electricity service, entailing the laying of approximately 23.9 kilometers of 38kV cable from the consented Ballymanus Wind Farm (Reg. Ref. 17/814) to connect the wind farm to the national grid at the existing Arklow 220kV ESB Station, County Wicklow, the proposed grid connection will be installed within existing private tracks and public roadway and include, provision of joint bays, draw pits, communication chambers, three phase electrical cables, optical fibre cables and cable sheath sectionalising chambers, water and rail crossings by (i) bridge crossings, (ii) horizontal directional drilling and iii) guided auger bore, limited ancillary forestry felling to facilitate construction and operation of the proposed development, reinstatement of land, road and track surface above the proposed cabling trench, all associated ancillary works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted with the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended, When a notice issues in accordence with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

In the townlands of Askakeagh Ballymanus Killaduff Roddenagh Kilballyowen Killacloran Coolahullin , Tinnakilly Lower Ballymorris Lower Ballymorris Upper Templelusk Knockanmohill Ballinamona Garnagowlan , Kilcarra West Kilcarra East Glenart Shelton Ab

1.2km
17814REFUSED5 Jul 2017

ten year permission for development of a wind energy project. The development will consist of up to eleven wind turbines with a maximum overall height of 150m to blade tip from existing ground level, a transformer at each turbine, a hard stand area adjacent to each turbine, a 38kV electrical substation and all associated infrastructure and works, up to two permanent / temporary meteoroligcal mast with a maximum overall height of 100m tip from existing ground level and all associated infrastructure and works, a temporary site compound and all associated works, new site tracks and upgraded site tracks and all associated works, two new access entrance to local road and all associated works, 20kV underground cables facilitating the connection of turbines to 38kV electrical substation and all associated infrastructure and works, land clearance including tree felling and vegetation removal, and all ancillary works. An Environmental Impact Statement accompanies the application

Roddenagh Kiladuff Ballymanus , Preban Ballinglen Askakeagh , Co. Wicklow

1.2km
2560466REFUSED25 Jun 2025

construction of a new dwelling, new access, installation of a wastewater treatment system and percolation area, new well and all associated site works

Roddenagh , Aughrim , Co. Wicklow

1.3km
18817CONDITIONAL17 Jul 2018

dwelling, wastewater treatment system to EPA 2009 standards, garage, domestic entrance and associated works

Roddenagh Hill , Aughrim , Co. Wicklow

1.3km
181143CONDITIONAL12 Oct 2018

and completion of domestic garage / store to rear of dwelling and associated works

Roddenagh Hill , Aughrim , Co. Wicklow

1.3km
21117CONDITIONAL10 Feb 2021

single storey extension to the side of my existing dwelling house and all associated site works

Balleeshal , Aughrim , Co. Wicklow

1.4km
23486CONDITIONAL25 May 2023

for as constructed dwelling

Roddenagh , Aughrim , Co. Wicklow

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?