Planning application 20469

Wicklow - Wicklow County Council

Proposed Development

construction of 14 storage units, for active registered fishers (under license agreement), with internal dimensions of approximately 35 sq metres and associated siteworks including provision for connection to services and two concrete slab work areas approximately of 8 metres by 4 metres

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 May 2020

  2. Decision due

    16 Jul 2020

  3. Decision: UNCONDITIONAL

    11 Nov 2020

  4. Grant issued

    14 Dec 2020

Application Details

Location
Inner Harbour / Dock , Off South Quay , Arklow Harbour
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Wicklow County Council
Site Area
1 ha

Timeline

Registration Date
22 May 2020
Status
APPLICATION FINALISED
Decision
UNCONDITIONAL
Decision Date
11 November 2020
Grant Date
14 December 2020
Permission Expires
13 December 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

82m
2660272CONDITIONAL7 Apr 2026

construction of two display buildings (Total Area 174sqm), external landscaping and all associated site works

The Harbour , South Quay , Arklow

98m
22567N/A25 May 2022

development of a pontoon and associated services and infrastructure

The Inner Harbour , South Quay , Arklow

124m
211316CONDITIONAL2 Nov 2021

Demolition of existing building & structures and removal of existing syncrolift at the water's edge. Development to the south of South Quay will comprise the erection of a new building with a 4 storey element to the front, to a 2 storey at rear, to provide operation & maintenance facilities to support the operation of an offshore windfarm. The proposed building will consist of office, warehousing & welfare facilities & other ancillary uses associated with the offshore windfarm operation. Landscaped terraces are proposed at roof level at the 2 storey and 3 storey levels of the proposed building. A c. 40m lattice communication mast, associated with the proposed use, is proposed for the southern corner of the site. Car parking for 60 vehicles along with cycle parking for 26 bicycles & 5 motorcycles. An ESB substation is proposed to the south of the building. Waste & recycling storage is proposed on site. Vehicular & pedestrian entrance gates onto South Quay & pedestrian & bicycle entrance to the west. Security fencing around the site. Development to the north of South Quay will comprise a general area for the berthing of vessels to service the offshore windfarm. A pontoon is proposed along with up to 4 cranes for loading & unloading of vessels. Shore side storage is also proposed including 2 shipping containers, a bunded waste oil tank, a grey water tank, a treatment unit/equipment kiosk & 2 bunded fuel storage tanks. A blackwater tank is proposed below ground. Parking for 6 vehicles to the north & west of the site. A flood wall. Vehicular and pedestrian entrance gates onto South Quay & pedestrian emergency entrance to the west are proposed. Proposed to construct a ramp on the section of South Quay to tie in with flood wall. Access between the areas to the north & south of South Quay will be via a raised ramp along South Quay with controlled crossing across South Quay. New paving at this location and to the west of the building. Wastewater on site will be stored underground and removed to a treatment plant. Also proposes the dredging of approx. 6,000m3 of material from the nearshore area to provide for navigational depth, berthing area and manoeuvring area for vessels. Landscaping, utilities & other services proposed throughout the site & all other associated works. Applicant seeks 10 years in which to construct the development. An Environmental Impact Assessment Report & a Natura Impact Statement have been prepared.

South Quay , Arklow , Co. Wicklow

134m
211273N/A22 Oct 2021

Demolition of existing building & structures and removal of existing syncrolift at the water's edge. Development to the south of South Quay will comprise the erection of a new building with a 4 storey element to the front, to a 2 storey at rear, to provide operation & maintenance facilities to support the operation of an offshore windfarm. The proposed building will consist of office, warehousing & welfare facilities & other ancillary uses associated with the offshore windfarm operation. Landscaped terraces are proposed at roof level at the 2 storey and 3 storey levels of the proposed building. A c. 40m lattice communication mast, associated with the proposed use, is proposed for the southern corner of the site. Car parking for 60 vehicles along with cycle parking for 26 bicycles & 5 motorcycles. An ESB substation is proposed to the south of the building. Waste & recycling storage is proposed on site. Vehicular & pedestrian entrance gates onto South Quay & pedestrian & bicycle entrance to the west. Security fencing around the site. Development to the north of South Quay will comprise a general area for the berthing of vessels to service the offshore windfarm. A pontoon is proposed along with up to 4 cranes for loading & unloading of vessels. Shore side storage is also proposed including 2 shipping containers, a bunded waste oil tank, a grey water tank, a treatment unit/equipment kiosk & 2 bunded fuel storage tanks. A blackwater tank is proposed below ground. Parking for 6 vehicles to the north & west of the site. A flood wall. Vehicular and pedestrian entrance gates onto South Quay & pedestrian emergency entrance to the west are proposed. Proposed to construct a ramp on the section of South Quay to tie in with flood wall. Access between the areas to the north & south of South Quay will be via a raised ramp along South Quay with controlled crossing across South Quay. New paving at this location and to the west of the building. Wastewater on site will be stored underground and removed to a treatment plant. Also proposes the dredging of approx. 6,000m3 of material from the nearshore area to provide for navigational depth, berthing area and manoeuvring area for vessels. Landscaping, utilities & other services proposed throughout the site & all other associated works. Applicant seeks 10 years in which to construct the development. An Environmental Impact Assessment Report & a Natura Impact Statement have been prepared.

South Quay , Arklow , Co. Wicklow

135m
22146CONDITIONAL15 Feb 2022

1. Demolition of existing structures on site. 2. Construction of a new two storey modular office building. 3. Amendments to existing shed on site. 4. New vehicular entrance, car parking, storm and foul drainage and all associated site works

South Quay , Arklow , Co. Wicklow

194m
18164CONDITIONAL19 Feb 2018

change of use of part warehouse to sports and recreation facility including minor elevational alterations

South Quay , Arklow , Co. Wicklow

214m
2560140N/A4 Mar 2025

single storey extension (Gross Area 326 Sqm) to east end of existing unit and all associated site works

Smurfit Kappa , Tinahask Lower Dock Road , Arklow

216m
2560183CONDITIONAL16 Mar 2025

demolition of existing walkway building (60sqm), removal of external storage structure(65sqm), and construction single storey extension (Gross Area 326 Sqm) to east end of existing unit and all associated site works

Smurfit Kappa , Tinahask Lower Dock Road , Arklow

227m
25126CONDITIONAL15 May 2025

construction of a building to display historic Coastguard horse drawn carriages previously used for rescue and ancillary works

Seafarers Memorial Garden , South Quay , Tinahask Lower

254m
22143N/A15 Feb 2022

external doors, external stairs and associated site works

Arklow Scout Den ,

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?