Application Timeline

  1. Application received

    16 Dec 2021

  2. Decision due

    18 Feb 2022

Application Details

Location
5 South Quay , Wicklow
Applicant
N/A
Application Type
N/A
Planning Authority
Wicklow County Council

Timeline

Registration Date
16 December 2021
Status
NEW APPLICATION
Decision
N/A
Decision Due
18 February 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

4m
22108CONDITIONAL8 Feb 2022

use of 5 South Quay as a restaurant/takeaway and the retention of the as constructed shopfront and awning

5 South Quay , Wicklow Town

37m
24431CONDITIONAL25 Oct 2024

(Section 254) for a scaffold

Wicklow Credit Union , Main Street , Wicklow Town

38m
2334CONDITIONAL19 Jan 2023

scaffold

4 Main Street , Wicklow Town , Co. Wicklow

39m
1860CONDITIONAL26 Jan 2018

scaffolding

Main Street , Wicklow Town

47m
21526CONDITIONAL7 May 2021

raised flower boxes and decked terrace

The Mariner , Main Street , Wicklow Town

49m
191209CONDITIONAL7 Nov 2019

change of use of unit 1 thereof from a betting office (this premises is vacant but was formerly used as a branch of Paddy Power) to a gaming outlet for amusement with prize machines. The application also includes the demolition of part of a dividing wall at ground floor level which separates Unit 1 and Unit 2 so as to facilitate the amalgamation of unit 1 with the Q Club, which currently occupies the basement of this building and which is soon to be extended into units 2 and 3 under Planning Register Reference 18/1435 (An Bord Pleanala Ref Pl27.303935). This proposal includes the erection of fascia signage and all ancillary site works

The Q Club , The Mall , Main Street

52m
201206CONDITIONAL26 Nov 2020

construction of a steel building for use as a micro-brewery connecting to mains and all associated site works

South Quay , Wicklow , Co. Wicklow

52m
18257REFUSED13 Mar 2018

change of use and extension to 3 no existing shop units in addition to alterations to the existing premises known as the Q club. The works will include the following (1) change of use of 3 no shop units into 1 ground floor entertainment venue circa 170.86 sqm, this converted unit will become part of the existing Q club premises circa 330.98 sqm (2) extension of circa 9.76 sqm to the front of the units which will enclose part of the existing covered area and form a new entrance and lobby area (3) alterations to elevations which will include a proposed new shop front (4) alterations to the existing Q club premises layout and entrance to allow for connection internally to the newly converted units on the ground floor including proposed new lift to basement (5) associated site works

The Mall Centre , Main Street , Wicklow Town

55m
181435REFUSED20 Dec 2018

recreational and entertainment development at Unit Numbers 2 and 3, along with works to the entrance to the basement area (and part of the basement itself) which comprises (1) the amalgamation of two vacant ground level shops (2) change from retail use of Units Numbers 2 and 3 to a refreshment / leisure centre (containing 105.4 sqm) which will form part of the existing Q Club premises which would then contain 436 sqm, with Unit Numbers 2 and 3, then containing a coffee dock, internet portals, pool tables and non gaming (amusement only) machines, (3) erection of a fascia signage (4) single storey 6.22 sqm extension to the front of Unit 3 to form a new entrance and lobby (5) internal alterations including male and female toilets and (6) new entrance for the basement including the installation of a lift linking the ground and basement levels along with (7) and all associated site works

The Q Club , The Mall , Main Street Wicklow

56m
2423CONDITIONAL22 Jan 2024

the installation of an ATM machine to the existing South Elevation

Casino Royale , The Mall Business Centre , Main Street

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?