Ballykean , Redcross , Co. Wicklow
CONDITIONALPlanning application 22742
Wicklow - Wicklow County Council
Proposed Development
new dwelling, new garage, new entrance onto public road, wastewater treatment unit and soil polishing filter, new well and associated works
View the full application file on the council's planning portal →Application Timeline
Application received
4 Jul 2022
Further information requested
17 Aug 2022
Further information received
14 Sept 2022
Decision: CONDITIONAL
23 Sept 2022
Decision due
11 Oct 2022
Grant issued
27 Oct 2022
Application Details
- Location
- Ballykean , Redcross , Co. Wicklow
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Wicklow County Council
- Site Area
- 0.28 ha
- Floor Area
- 167 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 4 July 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 23 September 2022
- Grant Date
- 27 October 2022
- Permission Expires
- 26 October 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
of extension to existing residence
Ballykeane Farmhouse , Ballykeane (Stringer) , Redcross
roofed horse walker together with all associated site works
Maltfield Stud , Redcross , Co.Wicklow
roofed horse walker together with all associated site works
Maltfield Stud , Redcross , Co.Wicklow
Change of use from the current residential use to short term lettings at Foal Lodge, Ballykean Estate, Redcross, Co. Wicklow
Foal Lodge , Ballykean Estate , Redcross
extension to rear of dwelling and velux windows to roof of dwelling and associated works
Oakwood Lodge , Ballykean (Stringer) , Redcross
for the construction of a new detached two storey dormer style dwelling, with separate detached single storey domestic garage, and new on-site waste-water treatment facility to current EPA standards, together with a new private well and all ancillary site works
Springfarm , Redcross , Co. Wicklow
the construction of a new detached two storey, split-level, dormer style dwelling with separate detached single storey domestic garage, and new on-site waste-water treatment facility to current EPA standards, together with a new private well, and all ancillary site works
Springfarm , Redcross , Co. Wicklow
demolition of existing unused cow kennel shed and underground slatted slurry storage shed and for construction of a calf rearing shed and underground effluent storage tank and all associated siteworks
Ballydonnell , Redcross , Co. Wicklow
the importation of material to in-fill and re-contour the subject site at Ballinabarny South, Redcross, Wicklow. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 3.72ha. of the total site. The 3.72ha is divided into 4 distinct phases - Phase 1 is 1.82ha, Phase 2 is 0.58ha, Phase 3 is 0.66ha and Phase 4 is 0.66ha. A fill plan has been drawn up for the importation of 41,552tonnes to fill Phase 1, 25,243tonnes to fill Phase 2, 28,596tonnes to fill Phase 3, and 28,596 to fill Phase 4, equating to a total of 123,987 tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit
Ballinabarny South , Redcross , Co. Wicklow
(i) a new entrance (ii) existing entrance to be closed and made obsolete (iii) the importation of material to in-fill and re-contour the subject site, and all associated site development works. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 3.72ha. of the total site. The 3.72ha is divided into 4 distinct phases - Phase 1 is 1.82ha, Phase 2 is 0.58ha, Phase 3 is 0.66ha and Phase 4 is 0.66ha. A fill plan has been drawn up for the importation of 41,552tonnes to fill Phase 1, 25,243 tonnes to fill Phase 2, 28,596 tonnes to fill Phase 3, and 28,596tonnes to fill Phase 4, equating to a total of 123,987tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit
Ballinabarny South , Redcross , Co. Wicklow
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?