← Back to search

Ballykean , Redcross , Co. Wicklow

CONDITIONAL

Planning application 22742

Wicklow - Wicklow County Council

Proposed Development

new dwelling, new garage, new entrance onto public road, wastewater treatment unit and soil polishing filter, new well and associated works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Jul 2022

  2. Further information requested

    17 Aug 2022

  3. Further information received

    14 Sept 2022

  4. Decision: CONDITIONAL

    23 Sept 2022

  5. Decision due

    11 Oct 2022

  6. Grant issued

    27 Oct 2022

Application Details

Location
Ballykean , Redcross , Co. Wicklow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Wicklow County Council
Site Area
0.28 ha
Floor Area
167 sq m
Residential Units
1

Timeline

Registration Date
4 July 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
23 September 2022
Grant Date
27 October 2022
Permission Expires
26 October 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

348m
22662CONDITIONAL14 Jun 2022

of extension to existing residence

Ballykeane Farmhouse , Ballykeane (Stringer) , Redcross

744m
2660562N/A22 Jun 2026

roofed horse walker together with all associated site works

Maltfield Stud , Redcross , Co.Wicklow

753m
2660604CONDITIONAL2 Jul 2026

roofed horse walker together with all associated site works

Maltfield Stud , Redcross , Co.Wicklow

835m
2460021CONDITIONAL22 Jan 2024

Change of use from the current residential use to short term lettings at Foal Lodge, Ballykean Estate, Redcross, Co. Wicklow

Foal Lodge , Ballykean Estate , Redcross

858m
17441CONDITIONAL21 Apr 2017

extension to rear of dwelling and velux windows to roof of dwelling and associated works

Oakwood Lodge , Ballykean (Stringer) , Redcross

1.1km
23207N/A3 Mar 2023

for the construction of a new detached two storey dormer style dwelling, with separate detached single storey domestic garage, and new on-site waste-water treatment facility to current EPA standards, together with a new private well and all ancillary site works

Springfarm , Redcross , Co. Wicklow

1.1km
2460156CONDITIONAL15 Mar 2024

the construction of a new detached two storey, split-level, dormer style dwelling with separate detached single storey domestic garage, and new on-site waste-water treatment facility to current EPA standards, together with a new private well, and all ancillary site works

Springfarm , Redcross , Co. Wicklow

1.2km
2560590CONDITIONAL1 Aug 2025

demolition of existing unused cow kennel shed and underground slatted slurry storage shed and for construction of a calf rearing shed and underground effluent storage tank and all associated siteworks

Ballydonnell , Redcross , Co. Wicklow

1.2km
2460474N/A2 Aug 2024

the importation of material to in-fill and re-contour the subject site at Ballinabarny South, Redcross, Wicklow. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 3.72ha. of the total site. The 3.72ha is divided into 4 distinct phases - Phase 1 is 1.82ha, Phase 2 is 0.58ha, Phase 3 is 0.66ha and Phase 4 is 0.66ha. A fill plan has been drawn up for the importation of 41,552tonnes to fill Phase 1, 25,243tonnes to fill Phase 2, 28,596tonnes to fill Phase 3, and 28,596 to fill Phase 4, equating to a total of 123,987 tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit

Ballinabarny South , Redcross , Co. Wicklow

1.2km
2460521REFUSED27 Aug 2024

(i) a new entrance (ii) existing entrance to be closed and made obsolete (iii) the importation of material to in-fill and re-contour the subject site, and all associated site development works. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 3.72ha. of the total site. The 3.72ha is divided into 4 distinct phases - Phase 1 is 1.82ha, Phase 2 is 0.58ha, Phase 3 is 0.66ha and Phase 4 is 0.66ha. A fill plan has been drawn up for the importation of 41,552tonnes to fill Phase 1, 25,243 tonnes to fill Phase 2, 28,596 tonnes to fill Phase 3, and 28,596tonnes to fill Phase 4, equating to a total of 123,987tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit

Ballinabarny South , Redcross , Co. Wicklow

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?