Proposed Development
S254 for overground electronic communications infrastructure and any associated physical infrastructure, a telephone kiosk or pedestal
View the full application file on the council's planning portal →Application Timeline
Application received
28 Apr 2023
Application withdrawn
9 May 2023
Application Details
- Location
- Connawood Drive , Bray , Co. Wicklow
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Wicklow County Council
Timeline
- Registration Date
- 28 April 2023
- Status
- WITHDRAWN
- Decision
- N/A
- Withdrawn
- 9 May 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Proposed works involve wrapping the existing house with external insulation. Si
1 Connawood Way, Old Connawood, Bray, Dublin, A98 PX51
Permission for a single storey extension (32 sqm) to side and rear of dwelling
1 Connawood Way, Old Connawood, Bray, Co Dublin
Retention permission is sought for
4, Connawood Walk, Bray, Co Dublin, A98ET62
First floor extension on existing bungalow.
Silver Hill, Old Connaught Avenue, Bray, Co Dublin
Permission for Retention of; (i) advertising signage both located on the
Bray Vet, Veterinary Surgery, Old Connaught Avenue, Bray, Co Dublin
Planning permission is sought for the construction of a new two-storey
Bray Vet, Veterinary Surgery, Old Connaught Avenue, Bray, Co. Dublin
Permission for alterations to the previously approved new 2 storey
Veterinary Surgery, Old Connaught Avenue, Bray, Co Dublin
Planning permission is sought for the construction of a 2 storey, 349m2, veterin
Bray Vet, Veterinary Clinic, Old Connaught Avenue, Bray, Co.Dublin
Planning permission is sought for alterations to the previously approved new
Bray Vet, Veterinary Clinic, Old Connaught Avenue, Bray, Co. Dublin
Construction of a two storey extension to side of existing two storey detached
14, Connawood Walk, Old Conna Wood, Old Connaught Avenue, Bray, Co. Dublin
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?