← Back to search

Barnamirw , Enniskerry , Co. Wicklow

N/A

Planning application 2360

Wicklow - Wicklow County Council

Proposed Development

new dwelling, bored well, effluent disposal system to EPA guidelines, forming new vehicular entrance on to existing driveway and associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    25 Jan 2023

  2. Application withdrawn

    2 Jun 2023

Application Details

Location
Barnamirw , Enniskerry , Co. Wicklow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Wicklow County Council
Site Area
1.03 ha

Timeline

Registration Date
25 January 2023Other applications received that week
Status
WITHDRAWN
Decision
N/A
Withdrawn
2 June 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

34m
201177REFUSED23 Nov 2020

dwelling, connection to existing well, effluent disposal system to EPA guidelines 2009 forming new vehicular entrance onto existing driveway ad associated site works

Barnamire , Enniskerry , Co. Wicklow

38m
2560402N/A29 May 2025

revised house type to that previously approved on site, reference PRR 23/60226 the development includes revised dwelling dwelling connection to existing well, on site effluent disposal system to EPA guidelines, forming new vehicular entrance on to existing public road and associated site works

Barnamire , Enniskerry , Co. Wicklow

45m
221389N/A21 Dec 2022

New dwelling, bored well effluent disposal system to EPA guidelines, forming new vehicular entrance on to existing driveway and associated site works.

Barnamire , Enniskerry , Co. Wicklow

48m
2560535CONDITIONAL15 Jul 2025

revised house type to that previously approved on site, reference PRR 2360226 the development includes revised dwelling dwelling connection to existing well, on site effluent disposal system to EPA guidelines, forming new vehicular entrance on to existing public road and associated site works

Barnamire , Enniskerry , Co. Wicklow

58m
2360226REFUSED16 Aug 2023

new dwelling, bored well, effluent disposal system to EPA guidelines, forming new vehicular entrance on to public road and associated site works

Barnamire , Enniskerry , Co Wicklow

72m
19630N/A10 Jun 2019

dwelling connection to existing well, on site effluent disposal system to EPA guidelines 2009 forming new vehicular entrance onto existing public road and associated site works

Barnamire , Enniskerry , Co. Wicklow

289m
191116CONDITIONAL11 Oct 2019

alterations to previously granted permission 19/101 consisting of increase in size of living room and front porch area, relocation of proposed front door and minor alterations to window configuration

Farrantree , Barnmire , Enniskerry

289m
20414N/A5 May 2020

alterations and extensions to previously approved planning permissions 19/101 and 19/1116. Alterations include for modification to window configuration and location, change to porch roof and window configuration and for provision of a dormer roof over stairwell to rear of house

Farrantree , Barnamire , Enniskerry

291m
22521CONDITIONAL16 May 2022

single storey extension to southern elevation(front) with partly flat roof & partly pitched roof with two roof lights; proposed energy upgrades to include replacement of external windows, modifications to heating system and the addition of solar panels to the front south facing roof slope; relocation of main entrance; alterations to elevations and internal layout, as well as all ancillary site development works

Farrantree , Barnamire , Enniskerry

292m
19101CONDITIONAL5 Feb 2019

extension to southern elevation (front) and alterations to the existing house including landscaping and associated works

Farrantree , Barnmire , Enniskerry

The submission window has closed

Observations on this application closed on Tuesday 28 February 2023, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?