← Back to search

Tober Lower , Dunlavin , Co. Wicklow

N/A

Planning application 23740

Wicklow - Wicklow County Council

Proposed Development

sought to retain existing farmyard entrance and ancillary works

View the full application file on the council's planning portal →

Application Details

Location
Tober Lower , Dunlavin , Co. Wicklow
Applicant
N/A
Application Type
RETENTION
Planning Authority
Wicklow County Council
Site Area
0.5 ha

Timeline

Registration Date
29 September 2023
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

20m
23751CONDITIONAL6 Oct 2023

existing farmyard entrance and ancillary works

Tober Lower , Dunlavin , Co.Wicklow

167m
2475CONDITIONAL16 Feb 2024

59.6 sq m single storey extension to 50.3 sq m farm dwelling house, new on-suite sewerage treatment system to serve dwelling house and all ancillary site works. Permission also sought for conversion of existing Dutch style hay shed to self catering agri-tourism accommodation, consisting of a two storey 3 bed room unit, and a single storey 2 bed room unit, conversion of old dairy to farm product workshop and conversion of old cattle shed to class room, 11 no. car parking spaces, new onsite sewerage treatment system to serve converted buildings. Alterations to existing entrance and all ancillary site works

Tober Lower , Dunlavin , Co. Wicklow

215m
22632N/A8 Jun 2022

construct 2 no. dwelling houses, O'Reilly Oaktown Sewerage Treatment Systems to serve each house, domestic garages, connections to public water- main, alterations to existing entrance and all ancillary site works

Tober Lower , Dunlavin , Co. Wicklow

233m
23576CONDITIONAL4 Jul 2023

construction of 2 No. dwelling houses. O'Reilly Oaktown Sewerage Treatment Systems to serve each house, domestic garages, connections to public water-main, alterations to existing entrance and all ancillary site works

Tober Lower , Dunlavin , Co. Wicklow

247m
2560253CONDITIONAL7 Apr 2025

revised house type on previously granted site (PRR 23576 ) for house type of Sarah Darcy and all ancillary site works

Tober Lower , Dunlavin , Co. Wicklow

250m
22727N/A30 Jun 2022

construct 2 no. dwelling houses, O'Reilly Oaktown Sewerage Treatment Systems to serve each house, domestic garages, connection to public water-main, alterations to existing entrance and all ancillary site works

Tober Lower , Dunlavin , Co. Wicklow

363m
20199N/A28 Feb 2020

side extension to existing single storey house and permission for side and rear extension to existing single storey house and all associated site development works

Park Lane , Tober Lower , Dunlavin

370m
211013CONDITIONAL16 Aug 2021

construct a first floor extension to bungalow over the central section of house when viewed from the public road. The existing ground floor area is 216.01 sqm and this will remain unchanged while the new first floor extension will add 74.88sqm. Alterations to ground floor layout will include the changing of a bedroom into a utility room and the repurposing of a second bedroom to a stairwell. The proposed two new bedrooms will compensate for the loss of the ground floor bedrooms resulting in no additional loading to the approved septic tank system.

Park Lane Stud Park Lane , Tober Lower , Dunlavin

371m
20225CONDITIONAL5 Mar 2020

side extension to existing single storey house and permission for side and rear extension to existing single storey house and all associated site development works

Park Lane , Tober Lower , Dunlavin

477m
22353N/A7 Apr 2022

of conversion of former domestic garage to granny flat and all ancillary site works

Dunlavin Lower , Dunlavin , Co. Wicklow

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?