← Back to search

Chatsworth Lodge , Ballyarthur , Co. Wicklow

N/A

Planning application 2560152

Wicklow - Wicklow County Council

Proposed Development

sunroom extension and additional first floor residential accommodation together with free standing storage outbuildings for uses ancillary to main house

View the full application file on the council's planning portal →

Application Details

Location
Chatsworth Lodge , Ballyarthur , Co. Wicklow
Applicant
N/A
Application Type
RETENTION
Planning Authority
Wicklow County Council
Site Area
18.3 ha

Timeline

Registration Date
6 March 2025
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

18m
2560036N/A27 Jan 2025

sunroom extension and additional first floor residential accommodation together with free standing storage outbuildings for uses ancillary to main house

Chatsworth Lodge , Ballyarthur , Co. Wicklow

40m
2560277CONDITIONAL11 Apr 2025

sunroom extension and additional first floor residential accommodation together with free standing storage outbuildings for uses ancillary to main house

Chatsworth Lodge , Ballyarthur , Co. Wicklow

162m
19945CONDITIONAL27 Aug 2019

Dwelling, domestic garage, wastewater treatment unit and polishing filter, new well, new entrance onto lane and associated works

Ballyarthur , Avoca , Co Wickow

215m
17223CONDITIONAL3 Mar 2017

the construction of a bungalow with garage, well, new entrance off existing lane and for a new effluent treatment system to current EPA standards and all ancillary site works

Ballyarthur , Avoca , Co. Wicklow

268m
21957CONDITIONAL3 Aug 2021

proposed dwelling, waste water treatment system to EPA standards, garage , new entrance and associated works

Ballyarthur , Avoca , Co Wicklow

773m
23556REFUSED23 Jun 2023

the importation of material to in-fill and re-contour the subject site. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the Site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 2.43ha of the total site. The 2.43ha. is divided into 3 distinct phases - Phase 1 is 0.78ha, Phase 2 is 0.77ha and Phase 3 is 0.88ha. A fill plan has been drawn up for the importation of 18,200tonnes to fill Phase 1, 23,085tonnes to fill Phase 2, and 42,721tonnes to fill Phase 3, equating to a total of 84,006tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit

Knockanduff , Avoca , Co. Wicklow

944m
221092CONDITIONAL12 Oct 2022

proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works

Ballycooleen , Avoca , Co. Wicklow

979m
18506CONDITIONAL11 May 2018

demolish a 29 sqm extension to the side of the existing dwelling along with a 56 sqm outbuilding and erect a 122m extension to the side of the existing 55 sqm original dwelling, block up the existing vehicular entrance and construct a new vehicular entrance with improved sightlines along with all associated site development works

Ballycooleen , Avoca , Co. Wicklow

1.1km
21223CONDITIONAL4 Mar 2021

dwelling and garage with services and all associated site development works

Ballycooleen , Avoca , Co. Wicklow

1.1km
21697CONDITIONAL11 Jun 2021

the construction of a bungalow with garage, new vehicular entrance and driveway, new effluent treatment system to current EPA standards and all ancillary site works

Sheepwalk , Arklow , Co. Wicklow

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?