← Back to search

Ballinaskea House , Ballinaskea , Arklow

N/A

Planning application 2660892

Wicklow - Wicklow County Council

Proposed Development

RED III -

  1. (1)
    installation of a 227 sqm domestic ground-mounted solar photovoltaic (PV) panel system on steel support frames
  2. (2)
    erection of a domestic battery energy storage enclosure shed
  3. (3)
    all associated underground electrical cabling and PVC ducting
  4. (4)
    installation of the new site access gates with a gravel-surfaced front apron and additional wire boundary fencing
  5. (5)
    the removal of an existing Laurel hedge located to the north of the existing field entrance, and its replacement with a new Laurel hedge planted in a set-back position from the public road tarmac to maintain natural screening
  6. (6)
    the creation of an additional grass verge width to the north of the existing field entrance to improve visibility lines;
  7. (7)
    all associated site development, drainage, and landscaping works
View the full application file on the council's planning portal →

Application Details

Location
Ballinaskea House , Ballinaskea , Arklow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Wicklow County Council
Site Area
1.05 ha

Timeline

Registration Date
5 October 2026
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

15m
181256CONDITIONAL9 Nov 2018

partial demolition, extension and renovation of an existing two storey dwelling house, new Eurotank PE 7 Wastewater Treatment System with a sand polishing filter, demolition of an existing septic tank, demolition of an existing retaining wall, site excavation of 443 sqm and erection of new retaining wall and associated site development works

Ballinaskea House , Ballinaskea , Arklow

141m
1830CONDITIONAL18 Jan 2018

existing telecommunications support pole 10m high with antenna, equipment cabinet and associated equipment within a fenced compound. The development forms part of Vodafone Ireland Ltd existing GSM and 3G Broadband telecommunications network (11/4872)

Ballinaskea House , Ballinaskea Td , Arklow

198m
21336CONDITIONAL30 Mar 2021

of an existing telecommunications support structure (previously granted under Plan Ref No 07/374) together with associated ground equipment cabinets within a fenced compound

Ballinaskea , Arklow , Co Wicklow

216m
2227CONDITIONAL18 Jan 2022

construction of a 24 metre high free standing communications structure with its associated antennae, communication dishes, ground equipment, fencing and all associated site development works. the development will continue to form part of existing 3G and 4G Broadband network

Ballinaskea , Arklow , Co. Wicklow

466m
191036CONDITIONAL23 Sept 2019

porch to side of dwelling, garage to rear of dwelling and connect to existing services and all associated site works

Ballymoyle , Arklow , Co. Wicklow

467m
19956N/A29 Aug 2019

porch to the side of dwelling, Permission to erect a garage to the rear of dwelling and connect to existing services and all associated site works

Ballymoyle , Arklow , Co Wicklow

497m
18949CONDITIONAL22 Aug 2018

construct a bungalow with services, domestic garage and ancillary works

Ballymoyle , Arklow , Co. Wicklow

503m
171366N/A14 Nov 2017

bungalow with services, domestic garage and ancillary works

Ballymoyle , Arklow , Co. Wicklow

630m
23752CONDITIONAL6 Oct 2023

demolition of existing single storey shed and garage to rear, construction of new part single storey part storey and a half extension containing 2 dormer windows to rear, removal of existing septic tank and new replacement proprietary effluent treatment system and all associated site works

Sparrows Den , Johnstown North , Arklow

633m
19388N/A10 Apr 2019

demolition of existing storage shed, a new storage shed and associated site development works

Johnstown North , Arklow , Co. Wicklow

Affected by this application?

Open for submissions
26days left to make a submission

Observations close on Sunday 8 November 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.

Check if you have grounds — free

Two questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?