Week of 26 February 2018: applications received in Kildare
17 planning applications were received by Kildare County Council between 26 Feb and 4 March 2018. Open any one for its full record, decision and site map.
- 18207CONDITIONAL
(a) 96 No. apartment units in 2 No. 4 storey apartment blocks – Type Block B. Block B consists of 48 units as follows: 2 No. 1 bedroom apartments, 6 No. 3 bedroom apartments and 40 No. 2 bedroom apartments with layouts to comply with current apartment development standards. (b) Access roads, surface car parking, drainage, extensive landscaping and all associated site development works
Station Road , Townland of Piercetown , NewbridgeKildare County Council28 Feb 2018 - 18205CONDITIONAL
for a change in house design from the one previously granted permission under Planning Reference 17/657. The floor area of the overall house is reduced to 255,54sqm (a reduction of 29.96sqm). There are also changes to the elevations and roof design to suit. The previously approved garage (floor area 52sqm) is still proposed but relocated on the site. The septic tank and percolation area; new piers and entrance gates to new vehicular entrance all remain as per the original granted application and no change is proposed. The site is located
Haynestown , Naas , Co. Kildare.Kildare County Council27 Feb 2018 - 18204CONDITIONAL
the removal of elevated ground to make site level for the construction of a new warehouse unit with associated parking, signage, new palisade fence, new attenuation tank, new pedestrian access from Crabapple Road with associated site works
Site Unit B , Crabapple Road (with rear access off Maple Drive) , Naas Enterprise ParkKildare County Council27 Feb 2018 - 18203REFUSED
construction of a two storey dwelling house, domestic garage, septic tank and percolation area, using the existing entrance as a shared entrance and all associated and necessary site works
Campbells Farm , Kilkea , Co. Kildare.Kildare County Council27 Feb 2018 - 18202CONDITIONAL
7 No. 4 bed 2 storey houses in 2 No. blocks of 3 and 4 houses and ancillary siteworks at a site between house Nos. 339B and 599 St. Mary’s Park,
St. Mary's Park , Leixlip , Co. Kildare.Kildare County Council27 Feb 2018 - 18201CONDITIONAL
change of use from light industry to office use at first floor level of existing full height workshop area, with internal alterations to existing offices
Maynooth DSU , Unit F8 Maynooth Business Campus , Straffan Road MoneycoolyKildare County Council27 Feb 2018 - 18200CONDITIONAL
change of use of office unit to coffee shop at this site. Coffee shop to hold capacity of 25 people, serving non-alcoholic beverages, cakes and pastries as a final products only, to avoid cooking at the premises. There will be no changes to front or rear elevation of Shopping Mall building,
Unit 3 Leixlip Shopping Mall , Main Street , LeixlipKildare County Council27 Feb 2018 - 18199N/A
a wraparound single storey front, side and partial rear extension, having a partial pitched roof to front and part side elevation with flat rood behind extension to be used as a granny flat
765 St Patricks Park , Celbridge , Co. KildareKildare County Council27 Feb 2018 - 18198CONDITIONAL
a first floor rear extension over existing with some internal alterations on first floor.
3 Brooklands , Clane , Co. KildareKildare County Council27 Feb 2018 - 18197CONDITIONAL
a two storey, 3 bedroom home of 115sqm and associated site works on an infill site
29 Glendara , Kill , Co. Kildare.Kildare County Council27 Feb 2018 - 18196N/A
a waste recovery facility. The subject site will be ca.7.33 hectares in size. The principal development activity will be the deposition of waste soil and stone at the quarry for the purposes of back filling. This will involve the use of subsoil and overburden, sourced from construction, renovation and demolition sites, to backfill and restore an existing void onsite created by past extraction of materials. The footprint of proposed area to backfill is 1.84 hectares in size. The proposed quantity of such material to be accepted and infilled would be less than 17,500 tonnes per annum and overall is expected to be approximately 100,000 tonnes throughout the operational phase of the proposed activity. The principal waste activity will be for the purposes of recovering said materials through land deposition, and to achieve the improvement and development of land and site restoration. In addition to the principal waste activity described above, it is proposed to carry out the following secondary waste recovery activities: Intake of topsoil, screening at proposed screening plant and resale of such material, Intake of gravel and sands, washing at existing washing plant and resale of such materials, Intake of concrete, concrete crushing using concrete crushing equipment, mixing with sand and gravel before being fed to the washing plant to form aggregate and resale of such material and intake of garden waste, shredding and composting of this waste within a silage pit draining to an underground effluent storage tank, for use for agricultural land spreading. In all less that 25,000 tonnes of waste materials will be accepted on-site for recovery per annum. A Waste Facility Permit will be obtained for site activities as they will fall under the scope of the Waste Management (Facility Permit and Registration) Regulations as amended.
Graney West , Castledermot , Co. KildareKildare County Council26 Feb 2018 - 18195CONDITIONAL
construction of a single and two storey extension to side and rear elevation and complete all ancillary site works
16 Parklands Lawns , Maynooth , Co. Kildare.Kildare County Council26 Feb 2018 - 18194N/A
(1) Two storey extension to side (including garage conversion to living accommodation); (2) Two storey and single storey extension to rear of existing semi-detached dwelling; and (3) Complete all ancillary site works
38 Oaklawn , Leixlip , Co. Kildare.Kildare County Council26 Feb 2018 - 18193REFUSED
the construction of a detached, single storey dwelling; the provision of a new shared vehicular entrance (including associated works to achieve sightlines, gates, piers and railings) and driveway; the provision of landscaping, including boundary treatments; and the provision of all other associated site excavation, infrastructural and site development works above and below ground, including waste water treatment system and percolation area
Autumn Leaves , Kilteel Upper , RathmoreKildare County Council26 Feb 2018 - 18192CONDITIONAL
re-opening of existing vehicular entrance to eastern front boundary and for retention permission for existing workshop and garage to rear of house with all associated site and drainage works
Coolfitch , Ardclough Road , CelbridgeKildare County Council26 Feb 2018 - 18191CONDITIONAL
construction of five detached dwellings, comprising of four no. part two storey, part single storey dwellings, one no. single storey dwelling with double garage, new site entrance and boundary walls, access driveways to service all individual houses, new boundary treatments to existing dwelling and adjoining childcare facility, five new individual waste water treatment systems with percolation areas, relocation of the existing on-site treatment system and percolation area, landscaping and all associated site development works
Rathmore West , Naas , Co.KildareKildare County Council26 Feb 2018 - 18190CONDITIONAL
1. Cow cubicle house including underground slatted slurry storage tank and feeding passages. 2. Milking parlour, dairy machine room, store room and farm office. 3. Cattle drafting yard and handling area. 4. Roofed collecting yard including underground slatted slurry storage tank. 5. Walled, unroofed silage pit. 6. Meal bin. 7. Demolition of existing loose house. Along with concrete yards and ancillary works
Gilltown , Kilcullen , Co. KildareKildare County Council26 Feb 2018
Source: the national planning applications dataset compiled from Ireland's planning authorities (Department of Housing, Local Government and Heritage). Applications are listed by the date the council received them.