11 planning applications were received by Sligo County Council between 19 Feb and 25 February 2018. Open any one for its full record, decision and site map.
- 1850CONDITIONAL
PP - for development consisting of the continued use and operation of the existing quarry and quarry extension area (19 hectares) permitted under Plan Reg. Ref. No. PL02/299 (ABP Ref. No. PL21 .201367) including the existing concrete batching plant and block making facility (in its current location at the eastern end of the site); the existing access onto the N59 road; existing weighbridges; existing wheel wash; existing crushing and screening plant; existing washing plant and closed circuit washwater management system; revisions to the permitted quarry extraction area along the northern boundary; provision of a landscaped screening berm along the northern boundary; existing landscaped screening berms and associated landscaping works; and for final restoration of the quarry all within an application area of c.45 hectares
Abbeytown and Kilboglasy towlands , Ballysadare , Co SligoSligo County Council23 Feb 2018 - 1849CONDITIONAL
Development consisting of the filling of lands with construction and demolition waste (application area = 1.0 Ha, volume = 24,950 tonnes) together with screening berms and all associated ancillary works
Carrownamaddoo , Ballintogher West ED , Co. SligoSligo County Council23 Feb 2018 - 1848CONDITIONAL
Development consisting of the demolition of an existing habitable dwelling and replacing it with a split level domestic house (single storey at the front, 2 storey at the rear), relocate the site entrance, upgrade the existing waste water treatment system to currrent EPA regs and all ancillary works
Aughamore Near , SligoSligo County Council23 Feb 2018 - 1847CONDITIONAL
Development consisting of the construction of a new forest access road entrance
Srananagh Townland , Sooey , Co SligoSligo County Council22 Feb 2018 - 1846CONDITIONAL
Development consisting of the construction of a 4 bay open slatted shed, underground slurry store along with all associated site works
Carrigans Upper , Ballymote , Co SligoSligo County Council22 Feb 2018 - 1845CONDITIONAL
Retention permission for development at the existing filing station premises a) Retention of a single storey extension to the rear of the premises c.19 sq.m. b) retention of as constructed internal layout & elevations including the demolition of a single storey glazed bay window and replacement signage as installed c) Retention of alterations to the site boundary treatments and site layout. And all associated site development works and services provision
Drumderry and Cleavry , Castlebaldwin , Co SligoSligo County Council22 Feb 2018 - 1844CONDITIONAL
Development consisting of 1) Change of use of existing garage to residential accommodation and 2) erect a disabled accessible single storey extension for residential use to the same existing garage
Ballydawley Td , Ballygawley , Co SligoSligo County Council22 Feb 2018 - 1843CONDITIONAL
Development consisting of the construction of a new slatted shed and creep area and all associated site works
Drumfin , Via Boyle , Co SligoSligo County Council22 Feb 2018 - 1842CONDITIONAL
Development consisting of the construction of a new dwelling house, on-site waste water treatment system together with ancillary site development works
Emlymoran , Corballa , Co SligoSligo County Council21 Feb 2018 - 1840N/A
Development consisting of laying an underground 38kV Electricity cable and associated ducting and ancillary development primarily within the public road to facilitate the connection of the permitted Derrysallagh Wind Farm within the townlands of Derrysallagh and Glen, Co Sligo (Sligo County Council Planning Reference PL12/133) to the National electricity grid via the existing Garvagh 110 kV substation in the townland of Seltan, County Leitrim. Part of this development is in place and subject to a pending application for Substitute Consent to An Bord Pleanala (Ref: ABP-300811- 18). The proposed development within the jurisdiction of County Sligo for which Permission is sought includes the following: Installation of approximately 0.69 km of underground cable ducting, 2 No. joint bays and ancillary development laid primarily within the public road corridor with a section of ducting to be installed within a steel box structure to be fixed to Boleymaguire Bridge within the townlands of Carrowcashel, Co Sligo and Boleymaguire, Co Leitrim. Within the townlands of Tullynure and Carrowcashel, permission is sought for the carrying out of remedial works to approximately 1.28km of the installed underground cable ducting which is subject to a pending application for Substitute Consent to An Bord Pleanala (Ref: ABP-300811-18). Remedial works include the relaying of backfill material. Permission is also sought for the installation of the electricity cable following completion of the civil works. This application is accompanied by an Environmental Impact Assessment Report (EIAR) / Environmental Impact Statement (EIS).
Carrowcashel Tullynure , Glen and BallynasheeSligo County Council20 Feb 2018 - 1839REFUSED
for development consisting of the construction of a dwelling house, proprietary effluent treatment unit and soil polishing filter on site, together with all ancillary site works and services
Drum East , Rathcormack , Co. SligoSligo County Council19 Feb 2018
Source: the national planning applications dataset compiled from Ireland's planning authorities (Department of Housing, Local Government and Heritage). Applications are listed by the date the council received them.