Week of 24 October 2022: applications received in Sligo
5 planning applications were received by Sligo County Council between 24 Oct and 30 October 2022. Open any one for its full record, decision and site map.
- 22355CONDITIONAL
development consisting of installation of a new disabled accessible lift, alteration of the external elevation and internal layouts along with miscellaneous site works associated with the development. This proposed development is within the curtilage of the following protected structures: (a) the Holy Cross Priory; (b) the old west end gable wall of the original circa 1845 church, and; (c) the Holy Cross Church
Holy Cross Priory , Dominick Street , SligoSligo County Council28 Oct 2022 - 22354CONDITIONAL
development consisting of renovation of existing single storey cottage, to include single and two storey extension to rear, construction of a detached garage to rear, a new wastewater treatment plant and upgrading of existing access and all associated site works
Gortnadrung , Ballintrillick , Co. SligoSligo County Council28 Oct 2022 - 22352CONDITIONAL
development consisting of (a) A High Inertia Synchronous Compensator (HISC) compound containing 1 No. HISC unit enclosed within a steel clad framed style structure (12.1m max height) and supported by 7 No. electrical equipment containers (containing ancillary power supply products including static frequency converters, MV switchgear, exciters, LV distribution, control room); 4 No. external cooler units; main, auxiliary & start-up electrical transformers, generator circuit breakers, switchgear equipment, and 1 No. back up diesel generator and associated diesel storage tank; (b) A 220kV High Voltage Gas Insulated Switchgear (GIS) compound containing a GIS building with all control & HV equipment within a single storey building (13.2m max height). The building will be surrounded by a compound road and contained within a 2.6 high galvanised steel palisade fence; (c) A 220kV underground cable to the existing adjoining Eirgrid substation boundary; (d) New access road and entrance from the L5204; (e) All associated and ancillary site works necessary to facilitate the development including: all necessary drainage systems, foundations works for the above compounds, various underground cables and ducts, equipment plinths, internal services roads, rainwater harvesting systems, welfare and office units, 2 No. material storage containers, compound lighting and palisade gates and fencing, security lighting, CCTV, hardstanding areas and boundary security fence. Planning permission to construct the development is sought for a period for 10 years. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies the application.
Ballysumaghan , Sooey , County SligoSligo County Council27 Oct 2022 - 22351CONDITIONAL
development consisting of: The 10 year permission for the construction and operation of a synchronous condenser facility. The facility will be a fenced compound ca. 1.196ha in size. The development will have a 30 year operational lifetime and will consist of a synchronous condenser, which will include the following elements: generator and flywheel building (ca. 600 sq.m., ca. 12.5m high) to house the equipment including the generator, flywheel, lube oil skid, vacumn skid, TEWAC pump skid, reverse switch cubicle and star point cubicle; SFC start-up equipment room (ca. 43.650 sq.m., ca. 4.20m high); AC/DC room (ca. 81.480 sq.m., ca. 4.20m high); C&P room (ca. 70.685 sq.m., ca. 4.20m high); battery room (ca. 28.130 sq.m., ca. 4.20m high); storage room (ca. 49.200 sq.m., ca. 4.20m high); supporting components of plant within the compound that include: outdoor cooler (ca. 190.925 sq.m., ca. 2.660m high); start-up transformer & auxiliary transformer structure (ca. 68.265 sq.m., ca. 4.50m high; step-up transformer (ca. 170.985 sq.m., ca. 8.0m high) partially surrounded by a fire wall; and, generator circuit breaker (40.160 sq.m., ca.10m high). All other ancillary and miscellaneous site works including: six (6 No.) lightening masts - height of lightening masts will be determined by lightening protection study prior to commencement of construction; site clearance; site access; separation walls (ca. 8m high) to the south of the transformers; internal hardcore access track; and, development of areas of hard standing including a maintenance layout area. The development will be bound by 2.4m high perimeter fencing. The application is accompanied by a Natura Impact Statement (NIS)
Ballysumaghan , Co. SligoSligo County Council26 Oct 2022 - 22350CONDITIONAL
development consisting of alterations to south east elevation including installation of 3 no dormer windows and change to existing single storey roof all to existing dwelling
Kilkilloge , Mullaghmore , Co. SligoSligo County Council25 Oct 2022
Source: the national planning applications dataset compiled from Ireland's planning authorities (Department of Housing, Local Government and Heritage). Applications are listed by the date the council received them.