HotelsDecisionDublin
Dublin City Council grants permission for 235-bedroom hotel at Dublin 8, Dublin
9 July 2024 · Permission.ie Planning Wire · from the Dublin City Council planning register · published 31 July 2026
Dublin City Council granted permission on 9 July 2024 for a 235-bedroom hotel at Dublin 8, an application first lodged on 15 May 2024.
Key facts
- Reference
- 3687/24
- Planning authority
- Dublin City Council
- Location
- A 0.1401 Ha Site on Lands at Molyneux Yard and Engine Alley and the site to the rear of No. 83 Meath Street, Dublin 8, (the site includes No. 75 Molyneux Yard)
- Received
- 15 May 2024
- Application type
- Permission
- Site area
- 0.1 hectares
- Bedrooms
- 235
- Status
- Appeal Decided
- Decision
- GRANT PERMISSION
- Decision date
- 9 July 2024
- Appeal
- ABP-320481-24 · GRANT PERMISSION
In context
It is one of 52 hotel applications Dublin City Council has received in the past twelve months, against 150 nationally. Of the 316 such applications decided by councils in the past three years, 88% were granted.
What happens next
The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 9 July 2024. If no appeal is lodged, the council’s decision stands and a final grant issues.
The development description, as lodged
Verbatim from the Dublin City Council register. This is the source for every figure in the story above.
PERMISSION : amendment permission to the permitted Hotel development granted under DCC Reg. Ref. 4262/19 & amended under Reg. Ref.. 4017/20 (ABP Ref. PL29S.309781) at a 0.1401 HA site on lands at Molyneux Yard and Engine Alley and the site to the rear of No. 83 Meath Street, Dublin 8 (the site includes No.75 Molyneux Yard as detailed on Eircode Mapper). The development will principally consist of: the provision of a new stair core and amendments to the layout of all permitted stair cores, as required for the fire safety certificate, resulting in an increase in floor area by c. 8 sq m; a reduction in the number of Hotel bedrooms from 265 No. to 235 No. bedrooms; a minor increase in the maximum height of the building by 0.58 metres to cater for lift overruns , minor revised elevational treatments; internal changes to the permitted internal layout; and all associated works.
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "Dublin City Council grants permission for 235-bedroom hotel at Dublin 8, Dublin", 9 July 2024. https://www.permission.ie/news/dublin-city-council/3687%2F24
<p>Source: <a href="https://www.permission.ie/news/dublin-city-council/3687%2F24">Dublin City Council grants permission for 235-bedroom hotel at Dublin 8, Dublin</a>, Permission.ie analysis of the national planning register, 9 July 2024.</p>
Map, site boundary, timeline and nearby applications for 3687/24.
Dublin planning registerEvery application lodged in Dublin, updated daily.
Get stories like this the day they are lodged
A county watch emails you every new application in Dublin the week it appears.
Set up alerts