Data centresDecisionMayo
Mayo County Council grants permission for data centre at Mullafarry and Tawnaghmore Upper, Killala, Co. Mayo
25 April 2025 · Permission.ie Planning Wire · from the Mayo County Council planning register · published 1 September 2026
Mayo County Council granted permission on 25 April 2025 for a data centre at Mullafarry and Tawnaghmore Upper, Killala, an application first lodged on 21 November 2024.
Key facts
- Reference
- 2460708
- Planning authority
- Mayo County Council
- Location
- Mullafarry and Tawnaghmore Upper, Killala, Co. Mayo
- Received
- 21 November 2024
- Application type
- PERMISSION
- Site area
- 10.6 hectares
- Status
- APPEALED
- Decision
- CONDITIONAL
- Decision date
- 25 April 2025
- Appeal
- ABP-322575-25
- Council file
- View on the Mayo County Council planning portal
In context
There were 3 nationally in the past twelve months. Of the 14 such applications decided by councils in the past three years, 86% were granted.
What happens next
The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 25 April 2025. If no appeal is lodged, the council’s decision stands and a final grant issues.
The development description, as lodged
Verbatim from the Mayo County Council register. This is the source for every figure in the story above.
The construction of a single data centre building located to the north of the site, with an overall gross floor area of c. 29,076 sq.m across two levels and an overall maximum height of c. 22.764m at parapet level. The data centre building includes data halls and associated electrical and mechanical plant rooms (c. 23,908 sq.m), an administrative and staff services block (c. 5,052 sq.m) and circulation and stairs (c. 116 sq.m). 2 no. external terraces are proposed to the east of the building (c. 309 sq.m) and an external generator yard to the south of the building (c. 5,205 sq.m) accommodating 25. no. backup / dispatchable generators and associated flues (to a height of c. 21.164m) within an enclosed compound. The construction of a sprinkler tank and pump house to the northeast of the site, the sprinkler tank is an overall height of c. 7.2 m and the pump house is a single storey building with an overall height of c. 4.15m and area GFA of c. 40.23 sq.m. The construction of an entrance hut at the main access to the south of the site, the hut is an overall height of c. 3.225m and area GFA of c. 11.6 sq.m. Construction of 2 no. site access points from the south and internal road network and circulation areas, footpaths, cyclist infrastructure, the provision of 56 no. car parking spaces (including 12 EV charging spaces and 7 disabled spaces, 3 of them EV), 20 no. cycle parking spaces, hard and soft landscaping and planting, site lighting, PV panels and plant at roof level, foul water connection connecting to existing WWTP in Killala Business Park, boundary treatments, green walls and all associated and ancillary works including underground foul and storm water drainage network and utility cables and all ancillary works and services. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority.
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "Mayo County Council grants permission for data centre at Mullafarry and Tawnaghmore Upper, Killala, Co. Mayo", 25 April 2025. https://www.permission.ie/news/mayo-county-council/2460708
<p>Source: <a href="https://www.permission.ie/news/mayo-county-council/2460708">Mayo County Council grants permission for data centre at Mullafarry and Tawnaghmore Upper, Killala, Co. Mayo</a>, Permission.ie analysis of the national planning register, 25 April 2025.</p>
Map, site boundary, timeline and nearby applications for 2460708.
All data centres applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Mayo the week it appears.
Set up alerts