Battery storageDecisionSligo

Sligo County Council grants permission for battery energy storage plant at Ballysumaghan Fannybrook, Quarry Lane, Co. Sligo

10 October 2023 · Permission.ie Planning Wire · from the Sligo County Council planning register · published 1 September 2026

Sligo County Council granted permission on 10 October 2023 for a battery energy storage plant at Ballysumaghan Fannybrook, Quarry Lane, an application first lodged on 17 August 2023.

Key facts

Reference
2360214
Planning authority
Sligo County Council
Location
Townland of Ballysumaghan Fannybrook, Quarry Lane Co. Sligo, Ireland
Received
17 August 2023
Application type
PERMISSION
Site area
5.1 hectares
Permission sought
10 years
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision date
10 October 2023

In context

There were 60 nationally in the past twelve months. Of the 72 such applications decided by councils in the past three years, 78% were granted.

What happens next

The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 10 October 2023. If no appeal is lodged, the council’s decision stands and a final grant issues. The applicant sought a 10-year permission, which sets how long they have to start the development.

The development description, as lodged

Verbatim from the Sligo County Council register. This is the source for every figure in the story above.

A 10 year planning permission for the construction of a: 1. enclosed battery energy storage system compound on a total of up to c. 5.05 hectare site, to include: • 150 battery units set inside storage blocks on concrete support structures containing Heating, ventilation and air conditioning unit (HVAC units); • Transformer and inverter units on concrete support structures; • 1 no. two storey customer 220kV Gas Insulated Substation (GIS) (See Drawing 23553-201 and 23552-202); • 1No. Customer Control Building and 220kV Transformer with associated Switchgear; • 3No. Containing Back-up Generators, Auxiliary Transformers, Switchgear containers, LV and Control Containers; • 1No. Lightning Pole; • 2No. Firewater reservoir ponds with Pumping station and 1No. detention basin with associated drainage systems (as per Drawing 23553-102); • Security gates, 2.6m palisade perimeter security fencing, CCTV and lighting system, landscaping works and all associated ancillary infrastructure; • 4.5m wide Access tracks and site entrance along with upgrade works on the public site access road (c.950m), • Associated electrical cabling and ducting and all other ancillary and miscellaneous site works including site clearance; site access, internal roads and development of areas of hard standing including a maintenance lay-down area. • c.100m of underground cabling ducts and cable to the neighbouring ESB substation. A Natura Impact Statement has been prepared for this proposed development to assess and mitigate any potential ecological impacts. the development will be located at a site in the townland of Ballysumaghan, Fannybrook, Quarry Lane Co. Sligo. The proposed development will have a projected life span of 35 years.

Cite this story

Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.

For print or broadcast

Source: Permission.ie analysis of the national planning register, "Sligo County Council grants permission for battery energy storage plant at Ballysumaghan Fannybrook, Quarry Lane, Co. Sligo", 10 October 2023. https://www.permission.ie/news/sligo-county-council/2360214

For the web (with link)
<p>Source: <a href="https://www.permission.ie/news/sligo-county-council/2360214">Sligo County Council grants permission for battery energy storage plant at Ballysumaghan Fannybrook, Quarry Lane, Co. Sligo</a>, Permission.ie analysis of the national planning register, 10 October 2023.</p>
Full application record

Map, site boundary, timeline and nearby applications for 2360214.

Sligo planning register

Every application lodged in Sligo, updated daily.

Get stories like this the day they are lodged

A county watch emails you every new application in Sligo the week it appears.

Set up alerts
Sligo County Council grants permission for battery energy storage plant at Ballysumaghan Fannybrook, Quarry Lane, Co. Sligo | Permission.ie