Housing schemesDecisionDublin
South Dublin County Council grants permission for 181-home scheme at Permitted apartment Block E, (currently under construction), Co. Dublin
20 April 2026 · Permission.ie Planning Wire · from the South Dublin County Council planning register · published 25 August 2026
South Dublin County Council granted permission on 20 April 2026 for a 181-home scheme at Permitted apartment Block E, (currently under construction), an application first lodged on 23 March 2026.
Key facts
- Reference
- SDZ25A/0051W
- Planning authority
- South Dublin County Council
- Location
- Permitted apartment Block E, (currently under construction), Hallwell within the Tubber Lane Develo
- Received
- 23 March 2026
- Application type
- Permission
- Site area
- 1,700 hectares
- Homes
- 181
- Status
- Final Grant
- Decision
- Grant Permission
- Decision date
- 20 April 2026
In context
It is one of 64 housing scheme applications South Dublin County Council has received in the past twelve months, against 1,568 nationally. Of the 3,037 such applications decided by councils in the past three years, 79% were granted.
What happens next
The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 20 April 2026. If no appeal is lodged, the council’s decision stands and a final grant issues.
The development description, as lodged
Verbatim from the South Dublin County Council register. This is the source for every figure in the story above.
This application relates to development within the Adamstown strategic development zone (SDZ) and is subject to the Adamstown planning scheme 2014, as amended. Planning permission for modifications to the development permitted under Reg. Ref.: SDZ24A/0026W, which relates to permitted apartment Block E (currently under construction) at Hallwell within the Tubber Lane Development Area of the Adamstown SDZ, Tubber Lane, Adamstown, Lucan, Co Dublin. The application site is located to the south of Tubber Lane Road in the north-west of the Adamstown SDZ lands, east of the Celbridge Link Road, south of Hallwell Road and north of Shackleton Drive. The site is located in the southern part of the Phase 1 residential development permitted under Reg. Ref.: SDZ17A/0006, as amended under Reg. Ref.: SDZ18A/0005, Reg. Ref.: SDZ19A/0010, and Reg. Ref.: SDZ20A/0006. The proposed development comprises modifications to permitted apartment Block E to provide for 2 no. additional age friendly apartments, and will consist of the following: • Omission of permitted ancillary staff areas, and reduction and reconfiguration of ancillary communal lounge area at ground floor level and provision of 2 no. 1 bedroom apartments at ground floor level; • Minor modifications to the permitted building facades; • Minor modifications to the permitted site layout to facilitate 2 no. additional cycle parking spaces; • All associated modifications to landscaping, foul and surface water drainage, and services necessary to facilitate the development; • All associated site development and ancillary works. The proposed modifications will increase the total number of age friendly apartments within Block E by 2 no., from 22 no. to 24 no., and the total number of residential units within the permitted Phase 1 residential development, as amended, from 179 no. to 181 no. units.
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "South Dublin County Council grants permission for 181-home scheme at Permitted apartment Block E, (currently under construction), Co. Dublin", 20 April 2026. https://www.permission.ie/news/south-dublin-county-council/SDZ25A%2F0051W
<p>Source: <a href="https://www.permission.ie/news/south-dublin-county-council/SDZ25A%2F0051W">South Dublin County Council grants permission for 181-home scheme at Permitted apartment Block E, (currently under construction), Co. Dublin</a>, Permission.ie analysis of the national planning register, 20 April 2026.</p>
Map, site boundary, timeline and nearby applications for SDZ25A/0051W.
All housing schemes applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Dublin the week it appears.
Set up alerts