Housing schemesDecisionTipperary
Tipperary County Council grants permission for 67-home scheme at Tyone, Nenagh, Co. Tipperary
17 September 2026 · Permission.ie Planning Wire · from the Tipperary County Council planning register · published 20 October 2026
Tipperary County Council granted permission on 17 September 2026 for a 67-home scheme at Tyone, Nenagh, an application first lodged on 27 July 2026.
Key facts
- Reference
- 26101
- Planning authority
- Tipperary County Council
- Location
- Tyone, Nenagh, Co. Tipperary
- Received
- 27 July 2026
- Application type
- EXTENSION OF DURATION
- Homes
- 67
- Status
- APPLICATION FINALISED
- Decision
- UNCONDITIONAL
- Decision date
- 17 September 2026
In context
It is one of 47 housing scheme applications Tipperary County Council has received in the past twelve months, against 1,579 nationally. Of the 3,034 such applications decided by councils in the past three years, 79% were granted.
What happens next
The applicant, or anyone who made a submission on the application, can appeal the decision to An Coimisiún Pleanála within four weeks of 17 September 2026. If no appeal is lodged, the council’s decision stands and a final grant issues.
The development description, as lodged
Verbatim from the Tipperary County Council register. This is the source for every figure in the story above.
the construction of 67 no. residential units, a new single storey crèche, single storey health centre and a 3 storey, 90 bed nursing home. The residential units will consist of: 5 no. 1-bed semi-detached bungalows, 5 no. 2 bed semi-detached bungalows, 13 no. 2 bed mid-terrace bungalows, 2 no. 2 storey 4-bed semi-detached houses, 2 no. 2 storey 4-bed mid terrace houses, 14 no. 2 storey 3 bed semi-detached houses, 14 no. 2 storey 2 bed mid-terrace houses and 1 no. apartment building consisting of: 8 no. 1-bed apartments and 4 no. 2-bed apartments over 2 storeys, located as follows, (2 no. 2 bed and 4 no. 1 bed apartments on ground floor, 2 no. 2 bed and 4 no. 1 bed apartments on first floor), the proposed development will also include new internal roadways and footpaths, a proposed new distributor road to the north and east of proposed development, pedestrian/cycle access off the existing Tyone Road to the west of the site, vehicular access from the existing Ormond Drive, south of proposed site, new vehicular and pedestrian access, new boundary treatments, landscaping, drainage, site services including new ESB Medium Voltage (MV) substation building and all ancillary site works
Cite this story
Free to quote, reproduce and republish with attribution (CC BY 4.0). Every figure on this page is traceable to the council record linked above; please link to this page so readers can check it too.
Source: Permission.ie analysis of the national planning register, "Tipperary County Council grants permission for 67-home scheme at Tyone, Nenagh, Co. Tipperary", 17 September 2026. https://www.permission.ie/news/tipperary-county-council/26101
<p>Source: <a href="https://www.permission.ie/news/tipperary-county-council/26101">Tipperary County Council grants permission for 67-home scheme at Tyone, Nenagh, Co. Tipperary</a>, Permission.ie analysis of the national planning register, 17 September 2026.</p>
Map, site boundary, timeline and nearby applications for 26101.
All housing schemes applicationsThe full register view, with a map and decision statistics.
Get stories like this the day they are lodged
A county watch emails you every new application in Tipperary the week it appears.
Set up alerts