Proposed Development

to apply for a 10 year planning permission for development on a c. 1 ha at Ballygeery West, Co Clare. The development will consist of the development and operation of a 250 to 500 MVA (electrical rating) synchronous condenser. The development which will be located within a site compound of c. 1 hectare behind the existing ESB substation for the purpose of stabilising the electricity grid will consist of the following elements; Compound building, within which the synchronous condenser generator and flywheel will be located (540m2c.7m high), Synchronous condenser, with a 250-500 MVA (electrical rating); Cooling equipment (c.160sqm., c. 3m high); 6 No. modular containers to house electrical and Control equipment (total area of c. 195sqm., c. 5m high), A generator step-up transformer, auxiliary transformer and electrical plant including an external circuit breaker (c.8m high); 1 No. firefighting water tank and pump, An above-ground oil separator and collection pit, Boundary fencing (c.3m high), palisade security entrance gate and CCTV, c.100m of underground cabling ducts and cable to the neighbouring ESB substation, All other ancillary and miscellaneous site works including site clearance; site access, internal roads and development of area of hard standing including a maintenance lay-down area. Planning PERMISSION is being sought for a duration of 10 years

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 May 2021

  2. Further information requested

    8 Jul 2021

  3. Further information received

    6 Sept 2021

  4. Decision: CONDITIONAL

    29 Sept 2021

  5. Decision due

    3 Oct 2021

  6. Grant issued

    3 Nov 2021

Application Details

Location
Ballygeery West , Co Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council

Timeline

Registration Date
20 May 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
29 September 2021
Grant Date
3 November 2021
Permission Expires
2 November 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

44m
2360393CONDITIONAL22 Sept 2023

for development which will consist of: 1 No. enclosed battery energy storage system compound on a total of c. 6.2 hectare site, to include: 1 no. 220kv GIS electrical substation building and 1 no. single storey customer substation building, control and switch room, 220kv transformer and four no. auxiliary transformers, up to 192 battery storage blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units), 16 transformer and 32 inverter units. Including access tracks and site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV system, landscaping works and all associated ancillary infrastructure. The proposed development will have a projected life span of 35 years. A Natura Impact Statement has been prepared to accompany this application

Ballygeery West , Co. Clare

49m
22765N/A26 Aug 2022

for development which will consist of a 10 year planning permission for the construction of a: 1. enclosed battery energy storage system compound on a total of up to c.7.8-hectare site, to include: 1 no. TSO electrical substation building and 1 no. single storey customer substation, control and switch rooms, up to 19 battery storage block on concrete support structures including heating, ventilation and air conditioning unit (HVAC units) transformer and inverter units. Including access tracks and site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV system, landscaping works and all associated ancillary infrastructure

Ballygerry West , Co Clare

498m
17554CONDITIONAL19 Jul 2017

to construct an extension incorporating a sports/general purpose hall to the existing clubhouse in lieu of previous extension granted under Planning permission reference No. P14-74

Ballyguiry , Labasheeda , Co. Clare

498m
17372N/A18 May 2017

for a change of design of the extension to the clubhouse previously granted under Planning Permission Reference no. P14-74

Ballyguiry , Labasheeda , Co Clare

538m
2560287CONDITIONAL21 May 2025

for the construction of an extension to the rear and front of an existing dwelling house along with alterations to the existing house and ancillary works

Ballyartney , Labasheeda , Co Clare

1.2km
20611CONDITIONAL3 Sept 2020

for development to extend existing livestock slatted unit with cubicles and manure pit with associated ancillary siteworks

Ballyartney , Labasheeda , Co Clare

1.5km
22185CONDITIONAL2 Mar 2022

to construct an extension to the rear of an existing dwelling house along with alterations to the existing house and ancillary works

Ballyartney , Labasheeda , Co Clare

1.6km
2560816CONDITIONAL18 Dec 2025

to extend and refurbish an existing house along with all associated works

Cullenagh , Labasheeda , Co. Clare

1.6km
19880CONDITIONAL11 Nov 2019

to construct a slatted house incorporating a feeding passage and calving area along with all other necessary ancillary and associated works

Ballygeery East , Labasheeda , Co. Clare

1.6km
21265CONDITIONAL25 Mar 2021

to demolish existing side extension and construct a replacement side extension to the existing dwelling house along with all associated site works

Cullenagh , Labasheeda , Co Clare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?