← Back to search

Ballyartney , Labasheeda , Co. Clare

N/A

Planning application 2660652

Clare - Clare County Council

Proposed Development

for the construction of a new dwelling house and garage complete with a new entrance, wastewater treatment system and ancillary works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    7 Oct 2026

  2. Decision due (upcoming)

    1 Dec 2026

Application Details

Location
Ballyartney , Labasheeda , Co. Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Site Area
0.36 ha
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
7 October 2026
Status
NEW APPLICATION
Decision
N/A
Decision Due
1 December 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

220m
22185CONDITIONAL2 Mar 2022

to construct an extension to the rear of an existing dwelling house along with alterations to the existing house and ancillary works

Ballyartney , Labasheeda , Co Clare

318m
20611CONDITIONAL3 Sept 2020

for development to extend existing livestock slatted unit with cubicles and manure pit with associated ancillary siteworks

Ballyartney , Labasheeda , Co Clare

1.4km
21409CONDITIONAL28 Apr 2021

for a machinery/storage shed & planning PERMISSION to construct a slatted shed incorporating a calf creep along with all associated works

Cullenagh , Labasheeda , Kilrush Co Clare

1.4km
2360393CONDITIONAL22 Sept 2023

for development which will consist of: 1 No. enclosed battery energy storage system compound on a total of c. 6.2 hectare site, to include: 1 no. 220kv GIS electrical substation building and 1 no. single storey customer substation building, control and switch room, 220kv transformer and four no. auxiliary transformers, up to 192 battery storage blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units), 16 transformer and 32 inverter units. Including access tracks and site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV system, landscaping works and all associated ancillary infrastructure. The proposed development will have a projected life span of 35 years. A Natura Impact Statement has been prepared to accompany this application

Ballygeery West , Co. Clare

1.4km
22765N/A26 Aug 2022

for development which will consist of a 10 year planning permission for the construction of a: 1. enclosed battery energy storage system compound on a total of up to c.7.8-hectare site, to include: 1 no. TSO electrical substation building and 1 no. single storey customer substation, control and switch rooms, up to 19 battery storage block on concrete support structures including heating, ventilation and air conditioning unit (HVAC units) transformer and inverter units. Including access tracks and site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV system, landscaping works and all associated ancillary infrastructure

Ballygerry West , Co Clare

1.5km
21497CONDITIONAL20 May 2021

to apply for a 10 year planning permission for development on a c. 1 ha at Ballygeery West, Co Clare. The development will consist of the development and operation of a 250 to 500 MVA (electrical rating) synchronous condenser. The development which will be located within a site compound of c. 1 hectare behind the existing ESB substation for the purpose of stabilising the electricity grid will consist of the following elements; Compound building, within which the synchronous condenser generator and flywheel will be located (540m2c.7m high), Synchronous condenser, with a 250-500 MVA (electrical rating); Cooling equipment (c.160sqm., c. 3m high); 6 No. modular containers to house electrical and Control equipment (total area of c. 195sqm., c. 5m high), A generator step-up transformer, auxiliary transformer and electrical plant including an external circuit breaker (c.8m high); 1 No. firefighting water tank and pump, An above-ground oil separator and collection pit, Boundary fencing (c.3m high), palisade security entrance gate and CCTV, c.100m of underground cabling ducts and cable to the neighbouring ESB substation, All other ancillary and miscellaneous site works including site clearance; site access, internal roads and development of area of hard standing including a maintenance lay-down area. Planning PERMISSION is being sought for a duration of 10 years

Ballygeery West , Co Clare

1.5km
22854CONDITIONAL22 Sept 2022

to decommission the existing septic tank and install new wastewater treatment system with all necessary ancillary services

Labasheeda , Kilrush , Co Clare

1.6km
21265CONDITIONAL25 Mar 2021

to demolish existing side extension and construct a replacement side extension to the existing dwelling house along with all associated site works

Cullenagh , Labasheeda , Co Clare

1.6km
23195CONDITIONAL31 Mar 2023

for development in the townlands of Ballyartney, Ballygeery East, Ballygeery West, Cloonkerry West, Cullenagh, KilKerin, Killofin, Knockphutteen and Lakyle North, Co Clare. The proposed development will include; (1) An extension of the existing Kilkerin Point 220 kV Line Cable Interface Mast (LCIM) compound, to facilitate new electrical equipment for the connection of two new 220 kV cable circuits, including: (a) A new control cabin (approximately 13.4sqm floor area by 3.5m high, which includes 0.85m ground clearance) and 2 no. parking spaces; (b) Associated 220 kV electrical equipment including, cable sealing ends, insulators, overhead conductors, surge arrestors and lightning masts measuring 15m high (tallest compound structure); (c) 220 kV underground cabling from the associated underground transition pits to the cable sealing end equipment; palisade fencing (approximately 2.6m in height, up to 3.5m in height, including anti-climb device) and gates; and associated landscaping. The development will also comprise; (2) A new fibre optic cable measuring an approximate length of 8.9km routed between Kilkerin Point LCIM compound (townland of Lakyle North) and Prospect 220 kV substation (townland of Ballygeery West); (3) Decommissioning of existing 220 kV electrical equipment, security fencing and gate at Kilkerin Point 220 kV compound; and (4) All ancillary site development works including site preparation works, site clearance and levelling, hardstanding, internal access tracks and temporary construction compound. This planning application is accompanied by a Natura Impact Assessment (NIS)

Ballyartney Ballygeery East Ballygeery West , Cullenagh KilKerin Killofin , Knockphutteen and Lakyle North Co Clare

1.7km
23217REFUSED12 Apr 2023

to construct a dwelling house, shed and proprietary waste water treatment system along with ancillary site works

Cullenagh , Labasheeda , Co Clare

Affected by this application?

Open for submissions
28days left to make a submission

Observations close on Tuesday 10 November 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.

Check if you have grounds — free

Two questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?