← Back to search

Unit 5 , Citylink Business Park , Forge Hill

CONDITIONAL

Planning application 1938707

Cork - Cork City Council

Proposed Development

Permission for retention...for the constructed (circa 2006) additional mezzanine ancillary office floor area at first floor level, change of use of part of existing warehouse ground floor area to ancillary offices and service area, material alterations to existing external elevations and associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 Sept 2019

  2. Decision due

    22 Jun 2020

  3. Decision: CONDITIONAL

    22 Jun 2020

  4. Grant issued

    4 Aug 2020

Application Details

Location
Unit 5 , Citylink Business Park , Forge Hill
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork City Council

Timeline

Registration Date
18 September 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
22 June 2020
Grant Date
4 August 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

81m
187397REFUSED20 Dec 2018

This is a new primary school opening in September 2019 and this start-up accommodation is required to enable the school to commence operation. The development will consist of the temporary change of use of existing office building to a temporary, two storey primary school (c 416.8 SQ. Mtrs). The development will involve minor revisions to property boundary to rear and side of building to include the erection of 2Mtr high welded mesh fencing and required access gates. Temporary Permission for a period no longer than 5 years is being sought.

Forge House , Forge Hill , Ballycurreen

111m
184299CONDITIONAL6 Feb 2018

Retention of 2 no. extensions to the existing Materials Recovery facility, associated modification to the facade and all ancillary site development works. The proposed development comprises of an activity requiring a Waste Licence.

Forge Hill , Ballycurreen , Co. Cork

111m
185176CONDITIONAL10 May 2018

An expansion to facilitate an increase in tonnage to 100,000 tonnes per annum of an existing Materials Recovery Facility. The proposed development will consist of 2 no. extensions to the existing waste handling building to allow for a proposed waste reception area, associated modifications to the facade, 1 no. diesel tank, external storage of ferrous and non ferrous metals, modifications to the site entrance including a new gate, fencing and all ancillary site development works. The Proposed development comprises of an activity requiring an Industrial Emissions Directive License. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the application.

Forge Hill , Ballycurreen , Co. Cork

143m
2140073CONDITIONAL9 Apr 2021

Permission for a 666m. squared external hard surfaced yard for external storage of bulk sands and gravels which will be bagged along with precast concrete products.

West Link , Togher Industrial Estate , Ballycurreen

182m
2140483CONDITIONAL7 Sept 2021

Permission for the construction of a light industrial building and all ancillary car parking, fencing and site development works to the rear.

Unit 16A , Togher Industrial Estate , Ballycurreen Togher

227m
174706N/A24 Mar 2017

Modifications and additions to previously approved planning application ref: 15/4491 as follows, i) Extended ground floor plan area – accommodating larger ‘Goods in/Goods out’ offices with enclosed link corridor, with footprint further extended to accommodate larger staff canteen area for a total extra ground floor footprint of 76.8sq.m, ii) Removal of existing lean to roofs over existing canteen & office areas on the existing south elevation, with a new flat roof and parapet structure to be constructed that will tie in with the new flat roof over extended ‘Goods in/Goods out’ offices, iii) Internal modifications to the first-floor area to include removal of 1 no. stair access to open plan office area from original application and reduction in first floor footprint by 56.2sq.m, iv) revised elevations reflected updated plan arrangements, v) connections to existing services and all associated site works.

West Link , Togher Industrial Estate , Ballycurreen Togher

227m
175060CONDITIONAL2 May 2017

To enclose part of the existing covered storage area to the main builders providers store to the South and East elevations, to provide ground floor accommodation space comprising of goods inwards and outwards offices, extended canteen area with new roof over existing canteen and office areas, provision of mezzanine infill office accommodation and internal modifications (change of plan from that permitted under Pl. Reg. No. 15/4491). Work to include for connections to existing services and all associated site works.

West Link , Togher Business Park , Ballycurreen Togher

280m
2341816CONDITIONAL2 Mar 2023

Permission is sought for the installation of roof-mounted solar photovoltaic panels including all ancillary works and services.

West Link , Togher Industrial Estate , Cork

296m
175360N/A31 May 2017

Construction of 16 no. dwelling houses (change of house type and layout to part of the permitted residential development as granted under 04/7674, extended under 10/5240 and 13/5025) and associated site works on sites 20-39 Farm Green.

20-39 Farm Green , Manor Farm , Lehenagh Beg

303m
2443043CONDITIONAL1 Jul 2024

The construction of a temporary single-storey modular office building and associated site works, including connections to existing on-site services, concrete footpath and all ancillary site works

The Maltings , South Link , Togher

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?