← Back to search

West Link , Togher Industrial Estate , Ballycurreen

CONDITIONAL

Planning application 2140073

Cork - Cork City Council

Proposed Development

Permission for a 666m. squared external hard surfaced yard for external storage of bulk sands and gravels which will be bagged along with precast concrete products.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 Apr 2021

  2. Decision: CONDITIONAL

    1 Jun 2021

  3. Decision due

    3 Jun 2021

  4. Grant issued

    13 Jul 2021

Application Details

Location
West Link , Togher Industrial Estate , Ballycurreen
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council
Site Area
0.067 ha

Timeline

Registration Date
9 April 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
1 June 2021
Grant Date
13 July 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

45m
2140483CONDITIONAL7 Sept 2021

Permission for the construction of a light industrial building and all ancillary car parking, fencing and site development works to the rear.

Unit 16A , Togher Industrial Estate , Ballycurreen Togher

143m
1938707CONDITIONAL18 Sept 2019

Permission for retention...for the constructed (circa 2006) additional mezzanine ancillary office floor area at first floor level, change of use of part of existing warehouse ground floor area to ancillary offices and service area, material alterations to existing external elevations and associated site works.

Unit 5 , Citylink Business Park , Forge Hill

157m
174706N/A24 Mar 2017

Modifications and additions to previously approved planning application ref: 15/4491 as follows, i) Extended ground floor plan area – accommodating larger ‘Goods in/Goods out’ offices with enclosed link corridor, with footprint further extended to accommodate larger staff canteen area for a total extra ground floor footprint of 76.8sq.m, ii) Removal of existing lean to roofs over existing canteen & office areas on the existing south elevation, with a new flat roof and parapet structure to be constructed that will tie in with the new flat roof over extended ‘Goods in/Goods out’ offices, iii) Internal modifications to the first-floor area to include removal of 1 no. stair access to open plan office area from original application and reduction in first floor footprint by 56.2sq.m, iv) revised elevations reflected updated plan arrangements, v) connections to existing services and all associated site works.

West Link , Togher Industrial Estate , Ballycurreen Togher

157m
175060CONDITIONAL2 May 2017

To enclose part of the existing covered storage area to the main builders providers store to the South and East elevations, to provide ground floor accommodation space comprising of goods inwards and outwards offices, extended canteen area with new roof over existing canteen and office areas, provision of mezzanine infill office accommodation and internal modifications (change of plan from that permitted under Pl. Reg. No. 15/4491). Work to include for connections to existing services and all associated site works.

West Link , Togher Business Park , Ballycurreen Togher

174m
2341816CONDITIONAL2 Mar 2023

Permission is sought for the installation of roof-mounted solar photovoltaic panels including all ancillary works and services.

West Link , Togher Industrial Estate , Cork

175m
187397REFUSED20 Dec 2018

This is a new primary school opening in September 2019 and this start-up accommodation is required to enable the school to commence operation. The development will consist of the temporary change of use of existing office building to a temporary, two storey primary school (c 416.8 SQ. Mtrs). The development will involve minor revisions to property boundary to rear and side of building to include the erection of 2Mtr high welded mesh fencing and required access gates. Temporary Permission for a period no longer than 5 years is being sought.

Forge House , Forge Hill , Ballycurreen

202m
2443043CONDITIONAL1 Jul 2024

The construction of a temporary single-storey modular office building and associated site works, including connections to existing on-site services, concrete footpath and all ancillary site works

The Maltings , South Link , Togher

219m
1938775CONDITIONAL9 Oct 2019

Permission... for the construction of a new single storey office building and all associated site works.

Togher Industrial Estate , Togher , Cork

231m
2443306CONDITIONAL7 Oct 2024

Permission for the construction of reduced emissions malting infrastructure as part of the decarbonisation road map for the business. The development will consist of the construction of a four storey energy building with roof mounted equipment, single storey utilities building, a kiln with roof mounted ancillary equipment, a germination vessel with roof mounted ancillary equipment and adjoining three storey aeration building, associated malt conveying system including a six storey elevator enclosure, demolition of existing single storey storage building and all associated site works including, connections to existing on site services, surface water management, concrete paving and all ancillary site works as part of the malting plant development project at their site at the Maltings, South Link, Togher, Co Cork. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application

The Maltings , South Link , Togher

248m
184299CONDITIONAL6 Feb 2018

Retention of 2 no. extensions to the existing Materials Recovery facility, associated modification to the facade and all ancillary site development works. The proposed development comprises of an activity requiring a Waste Licence.

Forge Hill , Ballycurreen , Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?