← Back to search

The Maltings , South Link , Togher

CONDITIONAL

Planning application 2443306

Cork - Cork City Council

Proposed Development

Permission for the construction of reduced emissions malting infrastructure as part of the decarbonisation road map for the business. The development will consist of the construction of a four storey energy building with roof mounted equipment, single storey utilities building, a kiln with roof mounted ancillary equipment, a germination vessel with roof mounted ancillary equipment and adjoining three storey aeration building, associated malt conveying system including a six storey elevator enclosure, demolition of existing single storey storage building and all associated site works including, connections to existing on site services, surface water management, concrete paving and all ancillary site works as part of the malting plant development project at their site at the Maltings, South Link, Togher, Co Cork. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    7 Oct 2024

  2. Decision due

    17 Feb 2025

  3. Decision: CONDITIONAL

    17 Feb 2025

  4. Grant issued

    1 Apr 2025

Application Details

Location
The Maltings , South Link , Togher
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council

Timeline

Registration Date
7 October 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
17 February 2025
Grant Date
1 April 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

34m
2443043CONDITIONAL1 Jul 2024

The construction of a temporary single-storey modular office building and associated site works, including connections to existing on-site services, concrete footpath and all ancillary site works

The Maltings , South Link , Togher

63m
1938775CONDITIONAL9 Oct 2019

Permission... for the construction of a new single storey office building and all associated site works.

Togher Industrial Estate , Togher , Cork

104m
2039041CONDITIONAL20 Jan 2020

Permission for the construction of an extension of existing rain shelter canopy located to the front elevation of the existing building

An Post Delivery Service Unit , Togher DSU , Togher Industrial Estate

231m
2140073CONDITIONAL9 Apr 2021

Permission for a 666m. squared external hard surfaced yard for external storage of bulk sands and gravels which will be bagged along with precast concrete products.

West Link , Togher Industrial Estate , Ballycurreen

238m
2140483CONDITIONAL7 Sept 2021

Permission for the construction of a light industrial building and all ancillary car parking, fencing and site development works to the rear.

Unit 16A , Togher Industrial Estate , Ballycurreen Togher

239m
2543733CONDITIONAL21 Mar 2025

Permission for change of use of ground floor commercial unit to use as a dental practice.

Unit 16 , South Ring Business Park , Kinsale Road

306m
2140353CONDITIONAL13 Jul 2021

Permission for the demolition and removal of an existing dwelling and ancillary structures and the construction of a mixed-use residential and commercial development in 13 no. blocks comprising: 134 no. residential units in 12 no. 3-storey blocks (comprising a mix of 1,2 and 3 bed apartments/duplexes), a 3 storey neighbourhood centre building (block 10) which includes a restaurant/take-away, convenience retail, gym, dentist, physio, hairdressers and outdoor amenity at roof level; a creche (included in Block 9); a 158 no. bed hotel (Block 7, which primarily ranges in height from 6 to 9 storeys with a 2-storey annex) and which includes a swimming pool, gym, bar, cafe, restaurant and function room; a new entrance/signalised junction and improvements to the N27 including 2 no. bus stops, cycle lane and footpaths; and all associated ancillary development works including an ESB sub-station, landscaping and amenity areas, solar panels (at roof level), bin storage, car and bicycle parking.

The Kinsale Road , Ballycureen , Cork

317m
1737546CONDITIONAL24 Aug 2017

Permission for Retention for a two storey office building consisting of an area of 45m² at ground floor level and with an area of 45m² at first floor level along with all associated site works

Unit 20 , South Ring West Business Park , Tramore Road

322m
1938707CONDITIONAL18 Sept 2019

Permission for retention...for the constructed (circa 2006) additional mezzanine ancillary office floor area at first floor level, change of use of part of existing warehouse ground floor area to ancillary offices and service area, material alterations to existing external elevations and associated site works.

Unit 5 , Citylink Business Park , Forge Hill

334m
2443332CONDITIONAL22 Oct 2024

Permission for the conversion and alterations of existing office spaces into a funeral service room at the ground floor of the existing building at Cork Islamic Cultural Centre Tramore Road Cork T12XV27. Proposed works include the provision of new access door to front elevation and minor elevational changes and all associated site works

Cork Islamic Cultural Centre , Tramore Road , Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?