No.9 Assumption Place , Station Road , Shean Upper
CONDITIONALPlanning application 2140244
Cork - Cork City Council
Proposed Development
Permission for to construct a two storey extension to the rear of our house, to construct a new ground floor bay window to the side, to demolish old existing kitchen to rear, to construct a 2.0m. high concrete block boundary wall with pedestrian gate to the rear and all associated ancillary site development works
View the full application file on the council's planning portal →Application Timeline
Application received
31 May 2021
Decision due
8 Feb 2022
Decision: CONDITIONAL
8 Feb 2022
Grant issued
22 Mar 2022
Application Details
- Location
- No.9 Assumption Place , Station Road , Shean Upper
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork City Council
- Site Area
- 0.042 ha
Timeline
- Registration Date
- 31 May 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 8 February 2022
- Grant Date
- 22 March 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for the construction of a new single storey extension to the side of dwelling house and all associated site works at 5 Assumption Terrace, Station Road, Blarney, Cork.
5 Assumption Terrace , Station Road , Blarney
Permission is sought for (A) Construction of single storey extension at lower ground floor to rear of house, (B) Construction of 2 no. dormer windows to roof at rear of house and installation of velux windows to roof at front and rear of house , (C) Alterations to elevations, (D) Associated site development works, all to existing two storey over lower ground floor detached house.
Ballinoe , Station Road , Blarney
Construct a dwellinghouse
Site No. 24 Aisling Geal , Station Road , Shean Upper Blarney
The construction of 3 detached dwellinghouses and all associated site works.
Station Road , Shean Upper , Blarney
Construction of 3 detached dwelling houses and all associated site works.
Station Road , Shean Upper , Blarney
Retention permission for a garden room incorporating workspace/store and sitting area. Permission for the demolition of single storey rear extension, construction of a two storey extension and single storey conservatory to rear, an attic conversion including 2 no. dormer windows and new window to front, 1 No. rooflight to front and 1 no. roof light to rear, new windows to first floor east elevation of existing dwelling, and ancillary site development works to dwelling.
No. 7 Aisling Geal , Station Road , Blarney
Permission for a Large-Scale Residential Development (LRD) at this site at Ringwood, Shean Upper, Blarney, Cork. The proposed development will consist of a largescale residential development (LRD), representing Phase 1 of the development in the Blarney East / Ringwood Expansion Area, and comprising of 246no. residential dwellings as follows: 101no. apartments arranged in 4no. part 3-storey, part 4-storey apartment blocks (to include 6no. 1-bed studio units, 35no. 1-bed units and 60no. 2-bed units); 30no. duplex dwellings arranged in 3no. 3-storey buildings (to include 15no. 1-bed dwellings and 15no. 2-bed dwellings); and 115no. 2-storey and 3-storey houses (to include 19no. 2-bed dwellings, 64no. 3-bed dwellings, and 32no. 4-bed dwellings). The proposed development also includes crèche (380.6sqm) with capacity to accommodate 61no. children. The proposed development will include provision for car parking, including EV charging points, bicycle parking, and motorcycle parking bays, and the provision of an area reserved for future resident car parking to the rear of Woodville Terrace on Station Road. The proposed development will also include the provision of private, communal, and public open spaces; internal roads and pathways with potential for future links to adjacent lands; pedestrian and cyclist routes; hard and soft landscaping and boundary treatments; waste storage; plant; signage; a new signalised access onto Station Road and road and footpath improvement works on Station Road and the R617 road; public lighting; 2no. new substations; all associated site development works; and all drainage and foul sewer infrastructure and network works, including nature-based SuDS measures. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR). The application may be inspected online at the following website: www.ringwoodphase1lrd.ie
Ringwood , Shean Upper , Blarney
Permission for a Large-Scale Residential Development (LRD) at this site at Ringwood, Shean Upper, Blarney, Cork. The proposed development will consist of a largescale residential development (LRD), representing Phase 1 of the development in the Blarney East / Ringwood Expansion Area, and comprising of 246no. residential dwellings as follows: 101no. apartments arranged in 4no. part 3-storey, part 4-storey apartment blocks (to include 6no. 1-bed studio units, 35no. 1-bed units and 60no. 2-bed units); 30no. duplex dwellings arranged in 3no. 3-storey buildings (to include 15no. 1-bed dwellings and 15no. 2-bed dwellings); and 115no. 2-storey and 3-storey houses (to include 19no. 2-bed dwellings, 64no. 3-bed dwellings, and 32no. 4-bed dwellings). The proposed development also includes crèche (380.6sqm) with capacity to accommodate 61no. children. The proposed development will include provision for car parking, including EV charging points, bicycle parking, and motorcycle parking bays, and the provision of an area reserved for future resident car parking to the rear of Woodville Terrace on Station Road. The proposed development will also include the provision of private, communal, and public open spaces; internal roads and pathways with potential for future links to adjacent lands; pedestrian and cyclist routes; hard and soft landscaping and boundary treatments; waste storage; plant; signage; a new signalised access onto Station Road and road and footpath improvement works on Station Road and the R617 road; public lighting; 2no. new substations; all associated site development works; and all drainage and foul sewer infrastructure and network works, including nature-based SuDS measures. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR). The application may be inspected online at the following website: www.ringwoodphase1lrd.ie
Ringwood , Shean Upper , Blarney
Permission for (1) Demolition of existing side boundary wall to be replaced by new timber fluted gate, (2) Construction of a single-storey side extension and two-storey rear extension for two number bedrooms to the existing dwelling house, (3) Elevational alterations to the side elevation of the existing dwelling house, (4) Construction of proposed side patio area and trellis area and proposed rear patio area to proposed extension to the existing dwelling house, (5) All associated site works.
25 Woodfield , Station Road , Blarney
Permission for the retention of the dormer style extension to the rear of the dwelling.
The Cottage , Shean Upper , Station Road