← Back to search

8&8A Ballinure Cottages , Mahon , Cork

CONDITIONAL

Planning application 2140402

Cork - Cork City Council

Proposed Development

Permission for (A) the part demolition, renovation and extension of 1 No. existing single storey semi-detached dwelling, demolition of 2 No. existing commercial shed units & 1 No. external temporary storage unit with associated concrete base. (B) the construction of 13 new dwelling units made up of one 3 storey apartment block comprising 4 no 1 Bedroom Ground Floor Apartments & 4 no 2 bedroom Duplex units over first & second floors, each with their own private balcony/terrace, a terraced block of 3 x 2bed two storey houses and a block of 2 x semi-detached 3 bed two-storey houses (C) Construction of revised existing vehicular entrance off Ballinure Cottages with on site circulation roadway & associated Car Parking Areas, pedestrian footpaths, hard and soft landscaping and communal open space areas (D) Construction of a secure Bike store with roof and railing enclosure Bin Storage shed unit, proposed boundary walls and railings to main entrance with masonry walls to remaining boundaries, and all associated site works, drainage , attenuation and sit services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Aug 2021

  2. Decision due

    29 Nov 2021

  3. Decision: CONDITIONAL

    29 Nov 2021

  4. Grant issued

    19 Jan 2022

Application Details

Location
8&8A Ballinure Cottages , Mahon , Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council

Timeline

Registration Date
4 August 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
29 November 2021
Grant Date
19 January 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2039623REFUSED22 Oct 2020

Permission for (A) The demolition of 1 no. existing single storey semi-detached dwelling, 2 no. existing commercial shed units, 1 no. external temporary storage unit and associated concrete base, (B) The construction of a 2 storey apartment block comprising 2 no. 1-bedroom apartments each with their own private balcony/terrace (C) The construction of a 4 storey apartment block to contain 42 no. apartments comprising 19 no. 1 bedroom apartments, 21 no. 2 bedroom (3P) apartments and 2 no. 3 bedroom apartments each with their own private balcony/terrace (D) Construction of revised existing vehicular entrance off Ballinure Cottages with on site circulation roadway and associated car parking area and hard and soft landscaping (E) The construction of an external bike store with roof and secure railing enclosure, a bin storage shed unit, proposed boundary wall and railing to main entrance with masonry walls to remaining boundaries, and all associated site works.

8 and 8A Ballinure Cottages , Mahon , Cork

79m
2341906CONDITIONAL11 Apr 2023

For planning permission. The development will consist of a Ground Mounted Solar PV Array, in the existing car park with 2334m2 or 495.5kWp (991 no.) of Solar PV Panels mounted on a structure which will be supported by steelwork and anchored in concrete footings, at our premises.

NSC Campus , Saint Michaels Drive , Mahon

163m
1938344CONDITIONAL10 Apr 2019

For permission at Quest Software, Block C, City Gate Park, Mahon, Cork City for provision of new generator on site, including all associated site works.

Quest Software , Block C , City Gate Park

167m
2140382CONDITIONAL26 Jul 2021

Permission for the construction of an extension to existing dwelling house and all associated works and all associated site works

7 St. Michael's Drive , Ballinure , Mahon

185m
1838141CONDITIONAL23 Nov 2018

Permission... for external signage at St. Michael's Dr, Block C, Mahon, City Gate, Cork, T12 HD21.

SonicWALL , International Ltd. , Block C Mahon

186m
2443511CONDITIONAL17 Dec 2024

Permission for the construction of single-storey dwelling together with associated services site development works and vehicular access from existing entrance on Ballinure Avenue.

14(a) Ballinure Cottages , Ballinure Avenue Ballinure (townland) , Mahon

195m
2039049CONDITIONAL24 Jan 2020

Permission for the erection of 1 no. sign to the south elevation (1 no. sign in total) at the existing building Block C, Citygate, Mahon, Cork (previously granted under planning applications 09/34109 and 12/35221).

Existing Building Block C , Citygate Park Development , Ballinure Mahon

254m
2140146CONDITIONAL30 Apr 2021

Permission for the development of a lengthened vehicle queueing lane and ancillary pedestrian/cycle infrastructure at Mahon Point Shopping Centre, Mahon Link Road, Cork. The proposed development includes a new section of pedestrian and cycle path, amendments to existing pedestrian crossings including the relocation of one no. existing pedestrian crossing, provision of two no. additional uncontrolled pedestrian crossings, additional road markings/signage, relocation of lighting and all associated and ancillary site development works.

Mahon Point Shopping Centre , Mahon Link Road , Cork

260m
2342510CONDITIONAL4 Dec 2023

Permission for development which will consist of the change of use of part of the existing ground floor and the entire first-floor of Block B, City Gate Park, Mahon, Cork from the office use permitted under application register references 09/34109 and 13/35818 to outpatient medical services use, and all associated site development works.

Block B , City Gate Park , City Gate Mahon

262m
2543604CONDITIONAL28 Jan 2025

Permission for development which will consist of the change of use of the existing second floor and third floor of Block B, City Gate Park, City Gate, Mahon, Cork from the office use permitted under application register reference 09/34109 to outpatient medical services use, and all associated site development works

Block B , City Gate Park , City Gate

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?