Planning application 00/31

Cork - Cork County Council

Proposed Development

Concrete manufacturing plant & ancillary works at existing quarry

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Jan 2000

  2. Decision due

    5 Mar 2000

Application Details

Location
COOLACLEVANE, COOLACLEVANE,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
5 January 2000
Status
WITHDRAWN
Decision
Pending
Decision Due
5 March 2000

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

72m
17/336INCOMPLETED APPLICATION30 May 2017

A Concrete Manufacturing Facility comprising of a Concrete Batching Plant (for production of Readymix and Blocks), Mobile Block Making Machine, associated Block Production Area (2,700 m²) and Block Storage Area (1,300 m²), Closed Circuit Lagoon System, Concrete Recycling Plant and all ancillary works within an application area of c. 0.7 Ha

Coolaclevane Kilmichael Co. Cork

72m
17/433CONDITIONAL6 Jul 2017

A Concrete Manufacturing Facility comprising of a Concrete Batching Plant (for production of Readymix and Blocks), Mobile Block Making Machine, associated Block Production Area (2,700 m²) and Block Storage Area (1,300 m²), Closed Circuit Lagoon System, Concrete Recycling Plant and all ancillary works within an application area of c. 0.7 Ha

Coolaclevane Kilmichael Co. Cork

83m
21/7401CONDITIONAL17 Dec 2021

The development will consist of the erection and operation of an asphalt plant (Stack height 20 meters) within an overall application area of 0.15 ha. at the existing quarry landholding.

Coolaclevane Kilmichael Co.Cork

95m
02/5740CONDITIONAL20 Dec 2002

SEE APPLICATION FOR DETAILS

COOLACLEVANE, COOLACLEVANE,

95m
02/2854WITHDRAWN3 Jul 2002

Tarmacadam/asphalt manufacturing plant & anc. works incl. electrical control building, control cabin, bitumen & fuel storage tanks

COOLACLEVANE, COOLACLEVANE,

132m
20/5468INCOMPLETED APPLICATION14 Jul 2020

The acceptance, storage and crushing of waste concrete from the applicant and other external sources for recycling and re-use consisting of storage and crushing of the concrete. The crushed materials will be utilised in the production of new concrete products. Proposed works include new concrete slab, petroleum/oil interceptor and percolation area. A Natura Impact Statement (NIS) has been prepared and will be submitted to the authority with this application.

Coolaclevane Kilmichael Co. Cork

132m
20/5655CONDITIONAL4 Aug 2020

Permission for the acceptance, storage and crushing of waste concrete from the applicant and other external sources for recycling and re-use consisting of storage and crushing of the concrete. The crushed materials will be utilised in the production of new concrete products. Proposed works include new concrete slab, petroleum/oil interceptor and percolation area. A Natura Impact Statement (NIS) has been prepared and will be submitted to the authority with this application.

Coolaclevane Kilmichael Co. Cork

192m
05/5440INCOMPLETED APPLICATION29 Jul 2005

Construction of concrete batching plant and concrete yard for block making

Coolaclevane Kilmichael

192m
05/6272CONDITIONAL31 Aug 2005

Concrete batching plant and concrete yard for block making

Coolaclevane Kilmichael

215m
17/824CONDITIONAL22 Dec 2017

Acceptance, storage and crushing of waste bituminous mixtures (tarmacadam) from other external sources for recycling and re-use consisting of storage and crushing of waste. The crushed materials will be utilised in the production of new tarmacadam. Proposed works include concrete slab, petroleum/oil interceptor and percolation area

Coolaclevane Kilmichael Co Cork

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.